Tor Raubenheimer ILC Accelerator Design: Status and Politics Loopfest V SLAC June 19 th, 2006.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Most slides from September 2006 MAC meeting ILC Cost Versus Performance (Parameter Choices) Tor Raubenheimer SLAC.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Nick Walker KEK-DESY meeting 7 th March 2005.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Plan ahead for the GDE Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
The Path Toward a Linear Collider Barry Barish HEP 2005 Lisbon, Portugal 23-July-05.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
ILC Accelerator Technical Issues Nick Walker LCWS 2005 Stanford University
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
22-May-06 FALC - Rome Global Design Effort 1 Report on Progress of the GDE Barry Barish GDE.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
Global Design Effort 22 March 2007 Tor Raubenheimer1 ILC Machine Overview and Critical R&D ALCPG Meeting Tor Raubenheimer.
The International Linear Collider and the Future of Accelerator-based Particle Physics Barry Barish Caltech Lomonosov Conference 20-Aug-2015 ILC.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
6-7 April 06 MAC Review Global Design Effort 1 The Global R&D Board Bill Willis GDE Columbia University.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
On the Way to ILC Shekhar Mishra Fermilab Talk presented on behalf of ILC-GDE 2/16/06 Talk Presented at the 2006 Aspen Winter Conference: "Particle Physics.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE.
6-7 April 06 MAC Review Global Design Effort 1 RDR Management Accelerator Design Towards the RDR Nick Walker ILC-GDE.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
ILC Global Design Effort Barry Barish GDE 9-March-06.
6-7 April 06 MAC Review Global Design Effort 1 The Baseline Configuration Tor Raubenheimer GDE SLAC.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
1-2 May 2006 LCFOA Mtg Global Design Effort 1 The Baseline Configuration and the Reference Design Report Tor Raubenheimer SLAC.
Tor Raubenheimer SLAC ILC Accelerator Efforts SLAC DOE Program Review June 13 th, 2007.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
WG1: Overall Design personal highlights report by Nick Walker First project meeting 2/12/2004 conveners: Kiyoshi Kubo (KEK) Tor Raubenheimer (SLAC)
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
ILC - Upgrades Nick Walker – 100th meeting
Status and Plan of GDE Design Work (Including Road Map for RDR)
ILC Global Design Effort
Barry Barish GDE Caltech
Electron Source Configuration
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Tor Raubenheimer ILC Accelerator Design: Status and Politics Loopfest V SLAC June 19 th, 2006

International Linear Collider – Americas The ILC Accelerator 2 nd generation electron-positron Linear Collider Parameter specification –E cms adjustable from 200 – 500 GeV –Luminosity  ∫ Ldt = 500 fb -1 in 4 years –Ability to scan between 200 and 500 GeV –Energy stability and precision below 0.1% –Electron polarization of at least 80% –Options for electron-electron and  collisions –The machine must be upgradeable to 1 TeV Three big challenges: energy, luminosity, and cost

International Linear Collider – Americas SLC: The 1 st Linear Collider Built to study the Z 0 and demonstrate linear collider feasibility Energy = 92 GeV Luminosity = 3e30 Had all the features of a 2nd gen. LC except both e+ and e- shared the same linac Much more than a 10% prototype

International Linear Collider – Americas Experimental Basis for the ILC Design Linac rf system BDS & IR Damping Rings e+ / e- Sources Bunch Compression SLC, E-158 SLC and (ATF2 in the future) SLC, FFTB, ASSET, E-158 ATF, 3 rd Gen Light Sources, SLC  Preservation TESLA Test Facility (SMTF & STF in the future) SLC and FEL’s

International Linear Collider – Americas ILC Schematic and Tunnels

International Linear Collider – Americas Global Design Effort Schedule Global Design EffortProject globally coordinated Baseline configuration Reference Design ILC R&D Program Technical Design FALC Siting International Mgmt expression of interest sample sites regional coord ICFA / ILCSC Funding Hosting

International Linear Collider – Americas Global Design Effort ICFA FALC Resource Board ILCSC GDE Directorate GDE Executive Committee Global R&D Program RDR Design Matrix GDE R & D Board GDE Change Control Board GDE Design Cost Board GDE

International Linear Collider – Americas Global Design Effort

International Linear Collider – Americas The GDE Boards R&D Board –Chris Damerell –Eckhard Elsen –Terry Garvey –Hitoshi Hayano –Toshiyasu Higo –Tom Himel –Lutz Lilje –Hasan Padamsee –Marc Ross –Bill Willis –Andy Wolski Design Board –W. Bialowons –J.P. Delahaye –A. Enomoto –P. Garbincius –R. Kephart –A. Mueller –J.M. Paterson –N. Phinney –T. Shidara –N. Terunuma Config Board –C. Pagani –G. Blair –D. Schulte –T. Markiewicz –S. Mishra –W. Funk –K. Kubo –M. Kuriki –N. Toge

International Linear Collider – Americas ILC GDE Program The present GDE ILC program has two portions: –Reference Design Report (RDR) A conceptual design based on sample sites with a cost estimate Accelerator physics and engineering efforts are being developed –R&D Program Presently administered through the different regions ILC Global Design Effort will coordinate effort more globally ILC design timeline –RDR at end of CY2006 –TDR based on supporting R&D in ~2009 ILC Americas –Effort spread between RDR and R&D programs –Coordinated by Gerry Dugan – MOUs between GDE and labs

International Linear Collider – Americas Reference Design Report What exactly is the RDR? –A 1 st attempt at an international cost estimate for the ILC using ‘reasonable’ extrapolations from present technology Baseline design mostly established at Snowmass, Aug Not TESLA and not USTOS –Must document sufficiently to estimate cost –Cost estimate based on sample sites from different regions –Goal of completing the estimate in CY2006 Need to use existing information: TESLA TDR, USTOS, Japanese ITRP estimate New information from US industrial estimates, DESY XFEL estimates, Japanese industrial estimates but most of these will be late  provide calibration but not a basis Need to make laboratory estimates for cost drivers Highest priority for the GDE in 2006

International Linear Collider – Americas Sample Sites Sample sites located in US, Japan, Germany, and CERN. Sample sites located in US, Japan, Germany, and CERN. Site located in northeast Illinois. Site located in northeast Illinois. Tunnel placed in a north-south alignment, in the top half of the Galina/Platteville dolomite, limestone stratum. This rock stratum is structurally stable and relatively dry. Tunnel placed in a north-south alignment, in the top half of the Galina/Platteville dolomite, limestone stratum. This rock stratum is structurally stable and relatively dry. Potential sites under consideration range from being centered on Fermilab to a site 30 KM to the west of Fermilab. Potential sites under consideration range from being centered on Fermilab to a site 30 KM to the west of Fermilab.

International Linear Collider – Americas RDR Working Groups Established working groups to complete RDR effort –Organized by Area around regional sections of LC Sources; damping rings; main linac; beam delivery; … –Technical design provide by technical groups that reach across Areas Coordinates technical resources but makes communication harder Uniform technical standards applied across collider Similar to style used for NLC Lehman design and TESLA TDR –Some groups provide technical support for Areas but also have system-wide responsibility  Global groups Conventional Facilities and Siting (CF&S) Control systems; Operations; Installation; … –Costs get rolled up to the Area groups so that they can study cost versus performance trades –Costs get output to Cost Engineers so they can study cost basis across systems

International Linear Collider – Americas RDR Matrix (Organization to complete Design) Matrix of Area Systems and Technical Systems to develop cost estimate –International representation in all working groups RDR Management group: Nick Walker, Tor Raubenheimer, Kaoru Yokoya, Ewan Paterson, Wilhelm Bialowons, Peter Garbincius, Tetsuo Shidara

International Linear Collider – Americas RDR Costing Use the spirit of ITER “Value” methodology –Doesn’t include labor costs, but estimates of institutional labor effort in person-hours –Doesn’t include contingency – need to subtract this cleanly from regional estimates –Will need a risk assessment for costs –Costs for raw materials will be standardized across project Use TESLA TDR, DESY XFEL, and USTOS costing –Get additional industrial estimates to support laboratory #s Insufficient time to develop a loaded schedule –Assume a 7 year construction period Construction starts with the 1 st contracts and finishing with the installation of the final components

International Linear Collider – Americas RDR Schedule RDR Matrix – Frascati (12/05) –Area Systems KEK (1/06) –Area & Technical Systems FNAL (2/06) GDE Bangalore (3/06) –Weekly review of different Area Systems –Linac Systems DESY (5/06) –Weekly review of different Technical Systems –First pass at cost estimates to AS and DCB by June 25 th GDE Vancouver (7/06) –Iterate on main cost drivers and estimates –Complete written drafts of RDR –Probable RDR meetings in early fall GDE Valencia (11/06) – First draft of RDR and cost estimate  complete in early 2007

International Linear Collider – Americas Parameter Plane Parameter plane established –TESLA designed for 3.4e34 but had a very narrow operating range Designed for single operating point –ILC luminosity of 2e34 over a wide range of operating parameters Bunch length between 500 and 150 um Bunch charge between 2e10 and 1e10 Number of bunches between ~1000 and ~6000 –Significant flexibility in damping ring fill patterns –Vary rf pulse length –Change linac currents Beam power between ~5 and 11 MW –Thought to have small cost impact – to be checked

International Linear Collider – Americas Parameters nomlow Nlrg Ylow PHigh L N  nbnb  x,y  m, nm 9.6, 4010, 3012, 8010,3510,30  x,y cm, mm2, , 0.21, 0.41, 0.2  x,y nm543, , , 8452, , 3.5 DyDy  BS % zz mm P beam MW Parameter range established to allow operating optimization

International Linear Collider – Americas Energy Upgrade Path Linac energy upgrade path based on empty tunnels hard to ‘sell’ –Empty tunnels obvious cost reduction Lower initial gradient increases capital costs Baseline has tunnels for 500 GeV cms with a linac gradient of 31.5 MV/m Geometry of beam delivery system adequate for 1 TeV cms –Require extending linac tunnels past damping rings, adding transport lines, and moving turn-around  ~50 km site

International Linear Collider – Americas (8 Cavities per Cryomodule) RF System

International Linear Collider – Americas Gradient Choice Balance between cost per unit length of linac, the available technology, and the cryogenic costs Optimum is fairly flat and depends on details of technology Gradient MV/m Relative Linac Costs Cavity typeQualified gradient MV/m Operational gradient MV/m Length Km Energy GeV initialTESLA upgradeLL

International Linear Collider – Americas Superconducting Cavities Goal 35

International Linear Collider – Americas Main Linac Layout

International Linear Collider – Americas Positron Source Choice Snowmass debate between conventional, undulator, and Compton sources –Snowmass recommendation of undulator source with Compton source as ACD Conventional source –Reduces operational coupling Undulator-based positron source –Much lower radiation environment –Smaller e+ emittance for given yield –Similar target and capture system to conventional –Easy path to polarized positrons Photon production at 150 GeV electron energy Compton source –Requires large laser system and/or capture ring

International Linear Collider – Americas e- source e - DR e - Dump Photon Dump e + DR Auxiliary e - Source Photon Collimators Adiabatic Matching Device e + pre-accelerator ~5GeV 150 GeV100 GeV Helical Undulator In By-Pass Line Photon Target 250 GeV Positron Linac IP Beam Delivery System e- Target Adiabatic Matching Device e - Dump Positron Source Positron source –SLAC is coordinating the positron source development –Undulator-based positron source is a large system –Focused on systems design and capture structure R&D Working with LLNL on target design Working with ANL on AMD and capture simulations Working with UK and ANL/LBNL on undulator design

International Linear Collider – Americas Damping Ring Requirements Compress 1 ms linac bunch train in to a “reasonable size” ring –Fast kicker (ns) Damping of  x,y = m-rad positron beams to (  x,  v )=(8  10 -6, 2  ) m-rad –Low emittance, diagnostics Cycle time 0.2 sec (5 Hz rep rate)   = 25 ms –Damping wiggler 2820 bunches, 2  electrons or positrons per bunch, bunch length= 6 mm –Instabilities (classical, electron cloud, fast ion) Beam power > 220 kW –Injection efficiency, dynamic aperture

International Linear Collider – Americas Damping Ring Issues Damping rings have most accelerator physics in ILC Required to: 1.Damp beam emittances and incoming transients 2.Provide a stable platform for downstream systems 3.Have excellent availability ~99% (best of 3 rd generation SRS) Mixed experience with SLC damping rings: –Referred to as the “The source of all Evil” –Collective instabilities, dynamic aperture and stability were all hard ILC damping rings have lower current than B-factories –More difficult systems feedback because of very small extracted beam sizes in constant re-injection (operate with small S/N) –More sensitive to instabilities – effects amplified downstream

International Linear Collider – Americas Damping Rings – BCD Choice Compared multiple lattice styles –Optics tuning and dynamic aperture –Collective instabilities (ECI, Ions, Space charge) –Cost 16 km FODO ‘dogbone’ (LBNL) 3 km TME ‘racetrack’ (KEK) 6 km TME ‘circular’ (ANL/FNAL) Baseline

International Linear Collider – Americas Beam Delivery System Baseline –Two BDSs, 20/2mrad, 2 detectors, 2 longitudinally separated IR halls Alternative 1 –Two BDSs, 20/2mrad, 2 detectors in single IR Z=0 Alternative 2 –Single IR/BDS, collider hall long enough for two push-pull detectors

International Linear Collider – Americas IR Design Design of IR for both small and large crossing angles Pairs induced background similar in both cases Losses in extraction & background harder in 2mrad Pairs induced background in SiD

International Linear Collider – Americas ATF-2 at KEK ATF-2 would be the BDS test facility –Follow-on to FFTB –New FFS optics –Operational issues –Train next generation New final focus ILC like optics at ATF-2

International Linear Collider – Americas ILC Technology Status Very High R&D priorities (categorized by Global Board): –Superconducting cavities and gradient Gradient of 25 versus 35 MV/m Cavity tuners –Rf sources Klystrons do not meet spec New modulator designs, eg Marx Generator –High availability hardware Power supplies and magnets –Positron target –Instrumentation (BPMs, laser wires, and energy spectrometers) –Damping ring (collective effects, kickers and emittance) –Beam delivery system (crab cavity, feedback and tuning)

International Linear Collider – Americas Availability and Operations The ILC will be an order of magnitude more complex than any accelerator ever built –If it is built like present HEP accelerators, it will be down an order of magnitude more (essentially always down) –For reasonable uptime, component availability must be much better than ever before  requires serious R&D R&D on –Power supplies – building 40 supplies for installation in ATF2 –Normal conducting magnets – started this as part of NLC program –Control system – started investigations in ATCA standard –Component diagnostics – developing small diagnostic board with Pohang Accelerator lab and Argonne –LLRF and timing system – working with large collaboration

International Linear Collider – Americas Summary ILC baseline configuration is well thought out –Based on decades of R&D –Technology reasonable extrapolation of the R&D status –Inclusion of availability and operational considerations –Conservative choices (for the most part) to facilitate rapid cost evaluation International team will complete RDR by end of CY2006 –Unknown review process afterwards Active R&D program to address technical and cost risks –Global R&D Board is working to coordinate the program