Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC.

Slides:



Advertisements
Similar presentations
Hydroelectric power By Andrew Verney NBS-MO16. Courtesy Queen Mary University of London t The hydrological cycle.
Advertisements

1 CERC Terms and Conditions of Tariff This presentation will only highlight the relevant financial principles and operation norms. APERC would like to.
India Electricity – 2006 Session – II Renovation & Modernisation Presented by: M.R. Ganesan / GM / SSBG Bharat Heavy Electricals Ltd.
Electric System Carlos Silva October 28 st Electric System Components Generation Transmission Network Substations Distribution Network Substations.
1 ENERGY EFFICIENCY IMPROVEMENT IN THE POWER SECTOR Presentationby BHEL - Corporate Engineering & Product Development 5 June 2008.
1 APGENCO Profile & Performance. 2 A NDHRA PRADESH POWER GENERATION CORPORATION LIMITED (APGENCO) WAS ESTABLISHED BY GOVERNMENT OF ANDHRA PRADESH UNDER.
1 TARIFF DESIGN for GENERATING STATIONS -- Bhanu Bhushan -- Feb 2011.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Serbian Legislation on Energy Milos Vulic, Attorney at Law.
Natural Gas Industry: a dynamic industry and a bridgehead to sustainable energy supply Auke Lont.
Madhya Pradesh Electricity Regulatory Commission Terms and Conditions of Tariff MPERC Comments on CERC Discussion Paper.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
EE535: Renewable Energy: Systems, Technology & Economics
POWER GENERATION TECHNOLOGIES
Electricity Supply in Alaska Frank Abegg, PE Fairbanks, Alaska April 2006 Frank Abegg, PE Fairbanks, Alaska April 2006.
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Barbara Tolić, HEP Trgovina d.o.o. SEECOFF , Belgrade.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Economics of Alternative Energy Sources and Globalization Nov Orlando, Florida The Economic Feasibility of Bio-energy Generation for Peak Demand.
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
GMR Group Discussion Paper on Terms and Conditions of Tariff November 12, 2003.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
PRESENTATION ON ON : TOTAL INSTALLED CAPACITY OF INDIA AS ON 31/03/2001 1,01,630 MW INSTALLED CAPACITY OF INDIA (THERMAL) 61,026 MW INSTALLED CAPACITY.
PRESENTATION On National Hydroelectric Power Corporation Ltd. ( A Govt. of India Enterprise) Sector – 33, Faridabad (Haryana), INDIA “Comments on Discussion.
Prime Ministry Regulatory Reform Group Republic of Turkey Prime Ministry RIA PLANNING PROCESS AND DEFINITION OF PROBLEM FOR ELECTRICITY PRODUCTION BASED.
The Energy Sector in India. Growth of installed capacity for electricity in India.
Energy Commission Ministry of Economic Affairs May 2004 Financing Renewable Energy Development in Chinese Taipei.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
Biggest hydroelectric power plants in world
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
MIGRATING TOWARDS A SMART DISTRIBUTION GRID Authors: Prashanth DUVOOR Ulrike SACHS Satish NATTI Siemens PTI.
Frankfurt (Germany), 6-9 June Astrid Petterteig, SINTEF Energy Research, Norway – Paper 0840 Presented by Dag Eirik Nordgård, SINTEF Energy Research.
Hydro Power – the history and the future. Robyn Hammond, School of Environmental Sciences, University of East Anglia. 24 th February 2005.
Electricity pricing Tariffs.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
Prepared by Sun Energy Engineering, LLC Opportunities for Renewable Power Resources in Florida What are our options?
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Training Presentation On Suratgarh Super Thermal Power Station (Raj)
Variable Load on Power Stations
Terms & Definitions.
KHYBER PAKHTUNKHWA Sept 30, PAKHTHUKHWA ENERGY DEVELOPMENT ORGANIZATION (PEDO)
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Power Systems presentation from ch-3
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Baseline for wind energy project in Tunisia Second National.
Southern Regional Power Committee Central Electricity Authority.
PRESENTER: K.P.REDDY B.E (Elect), F.I.E S.E (Retd.) APGENCO Associate President, Telangana Retired Engineer's Forum 1.
SCOPE OF THERMAL POWER PLANTS IN INDIA SUBMITTED BY GUIDED BY SURENDRA KUMAR AHIRWAR R.L. SHREE MALI.
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
CESC – visit presentation Marwadi Shares and Finance Ltd. 17 August 09.
Science A Physics – P1 Science A Physics – P1 Topic 1: Electricity Generation - 3 Topic 1: Electricity Generation - 3.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
STATE-WISE INSTALLED ELECTRICITY GENERATION CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE) StatesHydroSteamDieselGasWindTotal AP
Introduction And Thermal Power Plant
TARIFF DETERMINATION: GENERATION AND TRANSMISSION
Experience of R & M from Regulatory Perspective
Electricity Generation: Coal v/s N-Gas - Basic Economics
Electricity Generation: coal v/s n-gas - Basic Economics
CENERG 3rd TEMATIC WORKSHOP
Economic Operation of Power Systems
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Solar Power Project –Viability
Presentation transcript:

Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC

AUXILIARY POWER CONSUMPTION Slide 2

* Actually obtained in respect of two projects (i) M/s BPL Power Project (ii) M/s APGENCO - RTPP II. Colony consumption and construction power shall not be included Slide 3

Colony consumption and construction power shall not be included Slide 4

Slide 5

STATION HEAT RATE Slide 6

** In respect of units of 500 MW and above where the BFP is electrically operated the heat rate of 40 kcal / kWh shall be reduced from SHR. # Actually obtained in respect of RTPP. Slide 7

SPECIFIC OIL CONSUMPTION Slide 8

*As approved in case of RTPP. Slide 9

INCENTIVES Slide 10

(*) Actually obtained in respect of M/s BPL Power Project in AP. (**) Actually obtained in respect of 5 gas based projects (i) M/s BSES Andhra Power Limited (ii) M/s Vemagiri Power Generation Ltd (iii) M/s Konaseema EPS Oakwell Ltd (iv) M/s Gautami Power Project Ltd (v) M/s GVK Industries Ltd. Slide 11

Slide 12

(CI A – CI N ) 100 Where CI A = Average of daily capacity indexes over one year (CERC notification dated CI N = Normative capacity Index = 85%. Daily Capacity Index = Declared capacity in MW Maximum available capacity in MW x 100 Declared capacity : capacity available from the plant over peaking hrs in a day shall not be less than 3 hrs in any day. Slide 13

Advantages: i) Incentive not related to capital cost. ii) Incentive relates to peak time generation as well as capacity index. iii) There will be higher incentive for storage / pondage type of Hydro stations compared to run of the river schemes. iv) Incentive does not decrease for older plants. Slide 14

Slide 15

Slide 16

O & M EXPENDITURE Slide 17