Managing Reliability and the Markets with PI

Slides:



Advertisements
Similar presentations
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Roles and Responsibilities network owners system operator(s) regulators Infrastructure brokers power exchange(s) Market Places generatorsconsumerssupplierstraders.
Western Regulation Usage and Pilot Program Results 1.
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
Demand Response in Connecticut Presented by: Bob Laurita ISO New England December 2, 2004.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Resource Adequacy in PJM
PacifiCorp-CAISO EIM Initiative Overview
WAL-MART STORES, INC. DEMAND RESPONSE. Wal-Mart in New York Supercenters45 Discount Stores45 Neighborhood Markets 0 Sam’s Clubs17 Distribution Centers4.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Presentation to WECC Market Interface Committee March 24, 2015
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
WAL-MART STORES, INC. ENERGY EFFICIENCY AND DEMAND RESPONSE.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Market Based Solutions for Demand Response Providers Today and the Future Alice Jackson Occidental Energy Ventures Corp.
1 © 2008 OSIsoft, Inc. | Company Confidential Edison Mission Energy: PI for the Next Generation (of Generation) OSI Regional User Conference 10/09/08 Jerry.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
The Secrets to Successful AMI Deployment – The Ontario Experience Paul Murphy, President & CEO Independent Electricity System Operator February 19, 2007.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Illinois Wholesale Market Update December 10, 2003.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Extra electricity slides
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Wind Management at MISO
The New Texas Wholesale/Retail Market
Grid Integration of Intermittent Resources
ISO New England System R&D Needs
MIT tour of the California ISO Control Center March 31, 2015
Module 4 Smart Grid Implementation Issues
New England Electricity Restructuring Roundtable
Solar Energy Commercialization
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Managing Reliability and the Markets with PI PI System Users Conference OSI Software, Inc. April 2-5, 2000 Jim Detmers Director, Engineering and Maintenance California Independent System Operator

Some Facts About the California ISO Consists of PG&E, SCE, and SDG&E Service Territories. Covers 124,000 square miles. 21,000 Circuit Miles of Transmission Approximately 600+ Generators 45,000 Megawatt Summer Peak Load 164 Billion KWh of Energy Delivered to 27 Million Californians. Consumers Use Over $23 Billion of Energy Annually.

De-Regulating the Electric Industry in California

How the California ISO was Formed Sept. ‘96 Dec. ‘96 Jan. ‘97 May ‘97 July.-Oct. ‘97 Oct.‘97-Mar.’98 Mar. ‘98 ISO Restructuring Trust established $191 million credit facility for ISO start-up and development costs AB 1890 goes into effect Operational Dry Run Staff Training First Staff is Hired AB 1890 signed Mar.‘97 ISO staff & Executives hired Vendor Contracts Signed Initial Applications & infrastructure delivered

The ISO’s Basic Functions Assure that the Transmission Grid is Reliable. Access to the Transmission Grid is Open and Non-discriminatory. Electricity Markets Function Efficiently and Effectively. $

The ISO Reliability Requirements Maintain National and Regional Reliability Standards. Operating Reserve - Automatic Generation Control Frequency Response and Bias - Time Control Control Performance - Inadvertent Interchange Control Surveys - Control and Monitoring Equipment Backup Power Supply Maintain Operating Transfer Capability (OTC) between other Control Areas Maintain Operating Limits in the Local Area Transmission System.

“Reliability through Markets” Forward Energy Markets Day Ahead Hour Ahead Ancillary Services Markets Regulation - Spinning - Non-Spinning - Replacement Real-Time Markets Out-of-Market Calls (OOM) Emergency Measures

From Schedule to Reality Day Ahead Market Hour Ahead Market Real Time Suppliers Bid - Energy & Ancillary Services Load Estimated Transmission Capacity Analyzed Inter-Zonal Congestion Management Suppliers Re-Submit Bids Schedules Balanced Suppliers Bid - Energy & Ancillary Services Load Estimated Transmission Capacity Analyzed Inter-Zonal Congestion Management Suppliers Re-Submit Bids Schedules Balanced Suppliers Bid Energy Manage Loads Manage Frequency & Transmission System Balanced Regulation Dispatched Time

Gen. Scheduler Dispatched One Hour in the Market SCADA Regulation (AGC) 10 Minute Market Balancing Energy Gen. Scheduler Dispatched Load Balancing Energy Ties ????? Uninstructed Deviation Calculated Reliability Must Run Contracted Hour Ahead Energy Market Pre-Schedules Day Ahead Energy Market One Hour Time

The Tools That Make It Work INITIAL ISO COMPUTER SYSTEMS: Scheduling Infrastructure (SI) Scheduling Applications (SA) Energy Management System (EMS) Meter Data Acquisition System (MDAS) Balance of Business System (BBS) ________________________________ TOOL BOX ADDITIONAL COMPUTER SYSTEMS: Plant Information System (PI) Generator Communications Project (GCP)

Why Use PI? Historical Operational Data. Reliability and System Security Compliance with Market Bids Market Analysis

Examples of Using PI Real-time Regulation Response. Trend System Loads. Monitor Critical Transmission System Components. After the Fact Retrieve Operational Data. Analyze Transmission System Disturbances. Reliability Management System (RMS) reporting.

“Real-Time” Example: ISO Regulation The Dynamics of Regulation Provides Real-Time Difference Between Load and Generation Maintains Frequency and Interchange Schedules. Unique Ancillary Services Market. A Regulation Set-Point Signal is Calculated Every 4 Seconds. Regulation Market Bids are Dispatched Directly from the ISO. Load Generation 60Hz

“Real-Time” Example: ISO Regulation The Problem with Regulation New Market Environment Greatly Increased Regulation Requirements. Regulation Costs California Consumers up to $1,000,000 Each Day. Regulation is Complex and Difficult to Analyze. Multiple Generation Suppliers Bid to Provide Service Market Determines Which Units Will Provide Regulation Each Hour Dynamic Load Determines Regulation Need

Regulation is Bid in Market

“Real-Time” Example: ISO Regulation Using PI to Find the Regulation Problem Process Book Trends of Each Generator on Regulation Hourly Deviations Between Set-Points and Actual MW Output List of Generators Based on their Ability to Deliver Regulation Real-Time Updates of Generators Selected by the Market Net Regulation Trend Display.

Good Regulation Response “Real-Time” Example: ISO Regulation Good Regulation Response

PI Trend - Good Regulation Response

“Real-Time” Example: ISO Regulation Delay in Response Time

Generator Not Following the Set-Point “Real-Time” Example: ISO Regulation Generator Not Following the Set-Point

Improper Regulation Response

Uninstructed Deviation of a Non-regulating Unit “Real-Time” Example: ISO Regulation Uninstructed Deviation of a Non-regulating Unit Uninstructed Deviation Unit in Market and Chasing Price Uninstructed Deviation Unit Not in Market but, Chasing Price Uninstructed Deviation Unit Not in Market, but at Minimum Load Until Called

“Real-Time” Example: ISO Regulation Solving the Regulation Problem The Regulation Problem was Caused by Generators Not Responding to Control Signals. To Solve This Problem, the ISO is: Establishing Direct Communications with the Generators Correcting Improper Conversions for the AGC Set-Point Signal. Penalizing Units Deviating from Schedules because of Spot Prices.

“Real-Time” Example: ISO Regulation $ Results of Solving the Regulation Problem Correcting Regulation Problems Improves System Reliability. Reducing Regulation Requirements Enhances Market Competition. Reduced Requirements Result in Savings up to $300,000 a Day. The PI System Easily Paid for Itself After a Few Weeks of Operation.

“After the Fact” Example: Disturbance Analysis On September 30, 1999, under-frequency was experienced in the Western United States for about two hours. It appeared that the California transmission system was the cause of the event because: Higher than Expected Loads. Overloads on a Major Intertie Between Oregon and California. Shortage of Operating Reserves. Interruptible Load Shedding in California was Implemented.

“After the Fact” Example: Disturbance Analysis Using PI to Analyze the Disturbance Develop Trends For: Load Frequency Area Control Error (ACE) Flows on the Overloaded Transmission Lines Regulation Reserves.

“After the Fact” Example: Disturbance Analysis

PI Trend of Frequency and Load “After the Fact” Example: Disturbance Analysis PI Trend of Frequency and Load

“After the Fact” Example: Disturbance Analysis

PI Trend of Frequency and ACE “After the Fact” Example: Disturbance Analysis PI Trend of Frequency and ACE

“After the Fact” Example: Disturbance Analysis Results of the Analysis PI is a Valuable Tool for Determining the Causes of System Disturbances and Teaching Us How to Prevent Them from Occurring Again. Losses of Generation Outside of the California System Initiated the Event.

Conclusions PI can Be Used to Improve the Efficiency of the Markets and Reduce Costs to Consumers. PI can Be Used to Determine the Cause of Problems and Help to Improve System Reliability. PI has helped the ISO Realize its Mission Statement of “Reliability Through Markets” and to Meet ISO Corporate Goals.