AMR/AMI Metering Experiences IURPA/SURPA/SCRPA Conference – June 2010 Eddie Fee, Jr. Revenue Assurance Administrator.

Slides:



Advertisements
Similar presentations
Life with AMR Strengths and Weaknesses Of AMR Systems.
Advertisements

Case Study Exelon Energy Delivery AMR Pilot Project
Platinum Sponsors Titanium Sponsors.  FortisAlberta is Power Distribution company, responsible for 520,000 residential, farm and business customers.
Deployed AMI Value – Real World Examples Scott Durham Vice President, Strategic Accounts Elster Integrated Solutions.
City of Tallahassee Customer Engagement Florida Benchmarking Consortium Spring Conference April 25, 2013 Presented by: Joseph Cheatham.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
AMR/MMR And Tamper Detection Alan Chapman SCRPA/SURPA/IURPA Conference Atlanta, GA June 18 – 21, 2002.
Meter Tampering Presentation American Electric Power Texas Central Company Texas North Company.
Elements of a Lockout / Tagout Program BWC Division of Safety & Hygiene.
11 Rate Design to Complement AMI Implementation in Danville, Virginia Presentation by Denise Sandlin Support Services Director Danville, VA APPA 2009 Business.
What we found Benefits n Annual benefits = 9% to 16% of system cost n Most (60% - 70%) come from meter reader staff reductions. n Considerable stakeholder.
Contractor Safety Management
1 HON Introduction Honeywell Confidential Today’s Economic Realities Civic leaders face many issues… Improving productivity Improving safety & security.
Meter/Service Line Inspection s FECA Engineers Conference June 11, 2013 R. Corey Parr, CLCP
SIGN MANAGEMENT UPDATE Tracy Nowaczyk Pavement Management and Operations Section Engineer Meeting Fall 2013.
Bernie Neenan Technical Executive City Light Review Panel Meeting January 31, 2012 AMI Presentation.
NEI Electric Power Engineering electric power engineering Your Power System Specialists Outage Management System Overview June 9,
12/10/14 Advanced Metering Infrastructure Smart Grid Boot Camp IIT Delhi Oct 12, 2014 bindoo srivastava.
1 Department of Water and Power City of Los Angeles Automatic Meter Infrastructure Program Mariko Marianes and John Yu.
Solar Metering and Performance Monitoring Exposition June 4, 2007.
1 An Introduction to AMR file = amr101-1.ppt.
Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma.
© 2007 PPL Electric Utilities Energy Outlook: 2008 and Beyond Small Business Development Center Lehigh University November 7, 2007 Tom Stathos PPL Electric.
Southwest Renewable Energy Conference Smart Metering 101 Salt River Project Smart Meter Implementation September 13,
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
Mtr - 1 Smart Metering & Potential Impacts to Revenue Protection.
1 Billing, Metering CRM/CIS America 2004 Transition Strategy: Manual Field Data Collection to AMR Implementation Chuck Session Manager, Cinergy Meter Reading.
The Business Proposition
1 American Public Power Association Session 6 (PMA) September 24, 2007 Uses, Costs, and Implementation of AMR/AMI Herman Millican Austin Energy.
Web Security for Network and System Administrators1 Chapter 2 Security Processes.
Maureen Trumble Jack Hobbick AMI – Providing the Smart Grid Foundation.
Getting Ready for Advance Metering Infrastructure.
Listen to Your Meters! Pradeep Murthy SunTec Business Solutions.
Frankfurt (Germany), 6-9 June Lars Garpetun – Sweden – Session 6 – 0415 EXPERIENCES FROM OPERATIONS AFTER A FULL- SCALE SMART METERING ROLLOUT REGARDING.
Theft in Domestic and Commercial sectors 1Non-metering for want of meters, resulting in arbitrarily assessed consumption 2Tampering of meters 3Wrong recording.
Cleve L. Freeman – Los Angeles, CA USA Energy Loss Reduction Programs & Profits, Rio de Janeiro, Brazil 11 – 13 August 2004.
Improving Customer Service at BTU Through Benchmarking APPA National Conference Anaheim, California - June 20, 2005.
Consumer Education Challenge 1000 kwh x rate/kwh = $ Billed Amount When asked about energy usage, the customer receives this…… But really understands this…………
Supported by ACE – EAEF - EC With MIME - EDC – MIH – Power Dev 1 July 2005 DEMT Innovation Energie Développement REE Management Survey Results Summary.
Population 2,000 2 Square Mile City Randal Jones City Mgr W We’re on the way eimar C I T Y O F.
LPA Training Program. LPA Training Program: Construction/Contract Management Module 2.
Port Angeles, WA Process to Purchase AMI System Know Your Business Case Have A Procurement Strategy Evaluate 1st & Ongoing Costs Have A Communications.
Consumers Energy Advanced Metering Infrastructure Review and Feedback Utility AMI / Open HAN Meeting August 15, 2007.
Fermilab AD E/E Support Department Fermilab’s Experience in Applying OSHA and NFPA 70E Requirements in Accelerator Power Supply Systems NFPA 70E Standard.
Electrical Installation II1 Registered Electrical Contractor / Worker (Refer to handouts)
Metering Americas April 24, 2006 Advanced Metering.
ELECTRICITIES – INTRO TO AMI Brad Kusant – Area Manager 8/19/2014.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
Basic Meter School August 19-21, 2015 HISTORY OF METERING.
SmartMeter Status Report For December, 2011 (Prepared January, 2012) Work Plan Deliverable Continue the general meter deployment in the Coastal Region.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
1 Identification & Elimination of High Potentials Lessons Learned - Discussion.
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
MEPAV 2010 CONFERENCE. AMI MANASSAS Gregg S. Paulson, P. E
2016 Benchmarking Insights Conference Boulder, CO
Beyond the Business Case: AMR Operational Experiences and Benefits
Unitil Customer Facing Technology
in Smart Metering Solutions
Enterprise Asset Management Proposal to Expand AiM :
April 19, 2017 WB/DB vs. FlexNet Jeff miller.
Electricity Demand Response and Advanced Metering for Integrated Utilities Arkansas Public Service Commission Lonni Dieck AEP May 24, 2007.
Struggling to Pull the Plug on Energy Theft with AMR Technology
Pradeep Murthy SunTec Business Solutions
Remote Service Switches Reconnect/Disconnect Meters
The Future of Energy Management Real-Time Pricing
Smart Prepayment Solutions for PV/SSEG
PECO Natural Gas AMI Fixed Network Deployment Experiences
Presentation transcript:

AMR/AMI Metering Experiences IURPA/SURPA/SCRPA Conference – June 2010 Eddie Fee, Jr. Revenue Assurance Administrator

OUC 1998 – Started using walk-by AMR (Itron) – Mechanical meter w/ electronic AMR module – Select ‘rear-lot’ subdivisions, installed by employees – Currently have ~55,000 AMR walk-by in field 2001 – Started using fixed network AMR (Itron) – Pole or wall-mounted collection & concentrators – LSA apartment complexes, installed by employees – Eliminates ~28,000 trips annually for off-cycle read – Currently have ~20,000 AMR fixed network – Meters read twice daily

OUC 2005 – Started testing of AMI – Elster’s Energy Axis (REX) system – Remote Disconnect capability (under canopy) – Communicates meter to meter & back to collection point 2008 – Installed AMI addt’l 7,500 AMI meters – Select neighborhoods, installed by contractors Currently have ~30,000 AMI meters in field – Meter read twice daily

Contractor Installation of AMI 100% in-shop testing of all removed meters – Wanted to gain better knowledge of meter tamper rates for service territory – Overall meter tamper rate of 3.7% with some neighborhoods as high as 14.4% – Even w/ training, only 26% of tampered meters actually reported by contractor

AMR Tamper Flags Itron AMR Tamper Flags – Tilt & Inverse tamper flags associated w/ outage – Must be filtered against valid field orders – Sometimes sign of electronic module failure Elster AMI Outage Flags – REX1 – dip in voltage recorded as ‘outage’ – REX2 – dips not recorded as ‘outage’ – Must be filtered against valid field orders and recorded OMS outages for area

AMR/AMI Exposures & Considerations Contractor installs w/o meter testing may not give utility good understanding of tamper rates Develop reporting tools during test phase & before major deployment No monthly Meter Read visit to inspect seal, meter, & report safety hazards at location Tampering during outages may go unnoticed Pirated software to change/re-program meter