Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
Motors and Automatic Target Recognition Motors... l Motorized Instruments have 2 Motors: –One to Rotate the Alidade Horizontally –A Second to Rotate.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
Keck I Cassegrain ADC: Preliminary Design Overview UCO/Lick Observatory 15 October 2003.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
Nighttime Driving Capabilities for Rovers Danielle Ator Tim Eddy Jack Hompland.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
MMT AO run Jan Timeline: –Night 1: Install hardware during MMT engineering –Nights 2-4: AO engineering with fast-framing H camera (Indigo) –Nights.
HARPS-NEF PDR December 6 & 7, HARPS-NEF Program Project Manager Tim Norton.
1 Aurélien Barrau LPSC-Grenoble (CNRS / UJF) A few words on the LPSC The LPSC in few words: The scientific environment : Grenoble 4 Universities.
Digital Photography Fundamentals Rule One - all digital cameras capture information at 72 dots per inch (DPI) regardless of their total pixel count and.
6dF Data Release 2 The good, the bad and the ugly Will Saunders AAO 27/04/05.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Michigan/MIKE Fiber System (MMFS) – Update Apr 2005.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Committees.
New 42” Camera Status November 20, 2009 Ted Dunham, Peter Collins, Tom Bida, Georgi Mandushev, and Saeid Zoonemat Kermani.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
SALT HRS Lisa Crause for Durham CfAI & SALT Ops SALT Board Meeting #35, Chapel Hill, 5 June 2014.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
The Hobby-Eberly Telescope Mirror Alignment Recovery System Marsha Wolf Graduate Student UT Astronomy Department.
Asteroids Image Calibration and Setup Making a Lightcurve What is a Lightcurve? Cole Cook  Physics and Astronomy  University of Wisconsin-Eau Claire.
Telescopes and Instrumentation October 24. Calendar Next class: Friday November 7 Field trips! – Visit the 61” on Mount Bigelow Afternoon of Saturday.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
Our Company What your are Getting If your workstation or laptop has been giving you problems, we can fix it and restore your productivity without adding.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Existing instruments Future Instruments.
13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April.
1. Photography 101 First Class –Elements of a camera and how an image is made –Types of cameras (deleting the duplicate) –Exposure Second Class –Metering.
Binospec - Next Generation Optical Spectrograph for the MMT
A Detector Upgrade for LDSS3 Mike Gladders Jacob Bean (on the phone) with Andreas Seifart, Josh Frieman, John Carlstrom.
Oct 24, 2006SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status On-telescope throughput analysis Ghost analysis Repair plan Status of other current.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Human Factors Issues Chapter 8. What is Human Factors? Application of the scientific knowledge of human capabilities and limitations to the design of.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
Magellan Telescopes Observatory Report Personnel Network/Systems Administration Observing Statistics.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
STIS STATUS Charles Proffitt TIPs May 21, STIS Status - Status of Repair Results of FT Amp B Bias Anomaly Changes to SMOV Plan.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
CHARA Collaboration Year-Five Science Review 2008 Nightly Reports and Remote Observations By ~ PJ Sallave - Goldfinger.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
SMART, Hida and next NAGATA, SHIN’ICHI. Solar Magnetic Activity Research Telescope (SMART) The telescope was built at the Hida Observatory Kyoto University.
Application of a Charge Transfer Model to Space Telescope Data Paul Bristow Dec’03
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
Pg 1 21 April 2016 ACTR Meeting SOAR Priorities Jay Elias.
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Magellan Telescopes Observatory Report
COSMOS Status David Sprayberry, Sean Points & Jay Elias
On-Orbit Performance and Calibration of the HMI Instrument J
Announcements HR Diagram lab will be extended for one week. I’ll talk about it today. Homework: Chapter 9 # 1, 2 & 3 Next week is a Dark Sky Night. If.
Image calibration Geoff Smith, September 2018.
Echidna: current status and expected performance
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
NGAO topical discussion: Observing Efficiency and Uptime Budgets
Presentation transcript:

Magellan Telescopes Instrumentation: A Critical Assessment of Current Status

General Comments Generally speaking, the instruments currently in use on the Magellan telescopes are working reliably This is confirmed by the relatively small amount of observing time lost to instrument failure Nevertheless, none of the instruments have been accepted as commissioned facility instruments Consequently, there are no support agreements in effect between the instrument teams and the operations staff In the spirit of insuring that the instruments facilitate the best science possible, I present an assessment of instrument problems or deficiencies as seen from the operations side This list was compiled at a meeting with Frank Perez, Dave Osip, Marc Leroy, and the Instrument Specialists Mauricio Navarrete and Gabriel Martin

MagIC Instrument is still characterized by low-level noise pattern in bias exposures Binning and single-amp readout modes not available (currently being worked on at MIT) Dynamic range differs for different amps in quad readout mode Contamination in dewar has been an occasional problem Observing scripts cannot be aborted Instrument lacks a definitive cable wrap Spare parts situation generally good, but we are currently low on electronics boards spares due to work being done at MIT There is no spare for data acquisition computer

MagIC (cont.) Instrument needs a baffle to allow dome flats to be used for calibration Too much light in dome for daytime calibrations Need to make regular tests of linearity, gain, noise, etc. Need a local copy of observing manuals (currently only available on MIT website)

MagIC: Update from Jim Elliot MIT have wired the engineering SITe CCD in a test dewar setup and are (will be?) operating the system with an updated version of LOIS. This system operates in both quad-amp and single-amp mode. (Status of binning is not clear.) The new version of LOIS (4.2.0) should (i) make crashes less frequent,(ii) facilitate for aborting observing scripts, and (iii) allow the current MagIC computer to become a spare. A new computer with the updated control software will be sent to Chile, and installed and tested in June It is hoped that the new software will allow a single-amp mode, but this failure may be caused by wiring error in the MagIC dewar. If that is the case, the least invasive way to "repair" it may be to change the software to be consistent with the wiring error. An "occultation mode" for MagIC will also be tested in June that Jim hopes to use for his proposed Charon occultation observations in July.

MIKE/MIKE fibers Brass slit plate does not reflect blue light well; it also would be useful if the slit plate had a single small aperture in the center for focusing Position of slit plate should be encoded Linearity and well depth of blue CCD needs improvement Contamination in blue CCD dewar has been a problem (dewar does not hold vacuum as well as it should); has resulted in high dark current Occasionally exposures are lost due to the GUI freezing (this is a big problem for MIKE because of the long exposure times which are often employed) Software control needed for iodine cell

MIKE/MIKE fibers (cont.) Change back and forth to MIKE fibers is risky to optics/dewars; requires TV camera to be taken off; need to schedule at least a day off between such changes to minimize impact on observers For efficiency and safety reasons, observers using MIKE fibers are going to require significantly more assistance than the operations staff can provide (e.g. in creating pattern for plugging the fibers, and for doing the actual plugging) An exposure time calculator would be very useful Documentation of linearity, gain, dark current problems with blue CCD has been poor Need a local copy of instrument manual (currently only available on Michigan website, which is sometimes down)

PANIC Filter positioning occasionally unreliable Use of VNCviewer to remote the DEBONAIR display to the observer Linux workstations sometimes gives color mapping problems Firewall between Observer Workstations and Duke hinders access to data Quick-look IRAF tasks often do not work PANIC dithering sometimes doesn’t stop Bad connector(s) has led to noisy quadrant or complete dropout of quadrant PANIC electronics are spared by WIRC electronics, but WIRC boards don’t always function in PANIC

PANIC (cont.) Needs a definitive cable wrap Exposure time calculator not correct System for heat removal from electronics rack on platform has never been finished

LDSS-3 Shutter unreliable (with no warning) Positioning of wheels sometimes fails Opening access door for filters/grisms is painfully slow Zero point of focus mechanism changes when mechanism is cleaned Bad charge transfer in lower-right quadrant; this has been shown to be a problem intrinsic to the CCD An exposure time calculator for spectroscopy would be useful Too much light in dome for daytime calibrations

IMACS Observers need better documentation and operations staff more training in IFU and Nod & Shuffle modes Need to design and fabricate masks with standard slits for Nod & Shuffle observations of single objects Still need a safe way to change gratings It is currently difficult and unsafe to mount a filter in front of one of the grating positions Connectors on grating mounts are degrading All connectors (including coolant lines and piezo electric cable) for dewar changes are degrading Need accurate labels for all Gratings and Mounts Require regular documenting of all hardware and software changes.

IMACS (cont.) Noise in limit switches often requires these to be manually reset Need better documentation of recovery procedures for hardware/software failures An exposure time calculator for spectroscopy would be useful Need 6 more mask holders so that masks can be changed during the night A better way (that doesn’t involve back breaking) needs to be found to transport masks from laser room to telescope and back IMACS optics need to be realigned to remove focus tilt and coma Telescope optics need to be better collimated to remove tilt in field focal plane

IMACS (cont.) Need to understand and correct flat-fielding problem which currently precludes precision photometry over the full IMACS f/2 field Need to make COSMOS software always available to observers Spare parts need to be better organized