A Sustainable Future Powered by Electricity DS3 Workshop EAI Perspectives 14 th October 2013.

Slides:



Advertisements
Similar presentations
ICT Services Suppliers Briefing Thursday, 17 September 2009.
Advertisements

Smart grid energy business
Claims change programme Kent Chaplin Head of Claims, Lloyds Market Reform Forum 24 April 2008.
Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
Delivering a real CDM Project The BP PRODEEM Rural Solar Project.
DEVELOPERS PERSPECTIVE 5 th Annual Banking Summit Banking Association South Africa 31 October 2014, Empire Hotel, Sandton.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Comments on the OCE Solar Transition – Next Steps: Draft Staff Positions for Discussion Alfredo Z. Matos Vice President – Renewables & Energy Solutions.
Kick-off Stakeholder Workshop "Post 2020 framework in a liberalised electricity market with large share of Renewable Energy Sources" 28 April 2014, Brussels.
DS3 Programme Status Update JGCRP 12/11/2014 Robbie Aherne.
Congestion Management by distribution FEBEG POSITION Meeting FEBEG-VREG ( )
The Health Roundtable 3-3b_HRT1215-Session_MILLNER_CARRUCAN_WOOD_ADHB_NZ Orthopaedic Service Excellence – Implementing Management Operating Systems Presenter:
Towards Regional Independent Operators – a main driver for successful market integration.
Our Focus On Benefits Realisation >> Delivering Accelerated and Sustainable Business Benefits An introduction to our Project Definition & Benefits Templates.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Water policy reform – moving ahead Presentation for the Water Policy in the MDB Workshop 22 October 2010 Will Fargher, General Manager Water Markets and.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
A Business Case for the Gold Standard Heidi Forbes Gold Standard and the Clean Development Mechanism Capacity Building Workshop 7 th December 2006.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
May Agenda  PeopleSoft History at Emory  Program Governance  Why Upgrade Now?  Program Guiding Principles  High-Level Roadmap  What Does This.
DSU Commissioning and Testing Process
Market Integration Project. Background –Single Electricity Market Organisation –EU Internal Energy Market –Context for Market Design Market Integration.
A Sustainable Wales Better Choices for a Better Future Sustainable Development White Paper A Sustainable Wales - Better Choices for a Better Future.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
1 A REGIONAL PERSPECTIVE ON COP ISSUES – SESSION 4: DEVELOPMENT AND TRANSFER OF TECHNOLOGY By Angela Katongo Kabuswe.
Imposing access obligations under the new framework Karen Hardy.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
Wales and Third Sector EU Funding. Government of Wales Act 1998 sets out the National Assembly’s legal obligations to the sector and how it proposes,
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Prof. Valeria Termini AEEGSI Commissioner CEER Vice-President CEER DSO WG co-Chair The Future Role of European DSOs 1.
WSPP Contract Subcommittee February 3, 2011 Meeting Notes These notes are to facilitate discussions of a WSPP REC Service Schedule, are subject to revision,
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
STREAM 1B: SECTOR STRUCTURAL AND RESTRUCTURING ISSUES CLLR C JOHNSON, SALGA NEC ELECTRICITY DISTRIBUTION MAINTENANCE SUMMIT 9 JUNE 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Economic Instruments for Climate Change Mitigation Tradable Renewable Energy Certificates Workshop at the 2009 Climate Change Summit.
Copyright © 2007 Alsbridge plc. All rights reserved. Global Sourcing Masterclass: Transforming the HR Function HRO Insights and Key Success Factors from.
Gas & Electricity Workshop CER Consultation CER/13/122 Access Tariffs & Financing the Gas Transportation System 03 July 2013.
Capacity mechanisms in Europe The fundamental issues behind the ongoing sector enquiry Session 2 - If a capacity mechanism, which design is most appropriate?
California Transmission Planning Group Collaborative approach to State-wide Transmission Planning.
Code Governance Seminar 11 February 2008 Philip Davies Director of Regulatory Affairs.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
If I was the Government of India, what is the one thing that I would do to make the nation energy efficient? Suggest one way in which Government of India.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Cross Border TSO Balancing Procurement - a Generator/Trader Perspective Malcolm Taylor Head of Electricity Trading Association of Electricity Producers.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
Supporting Cheshire and Merseyside PCTs STANDARD NHS CONTRACTS Carole Hodgkinson Head of Contracts CISSU.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
All Island Single Electricity Market IWFA Update Laura Brien
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Philippine Feed-In Tariff System Implementation 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Legal Text Production Options for Discussion. Legal Text Production 2 Issues with current approach Issues with the current approach to legal text production.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
Advisory Team for Large Applications Viability and delivery: Applying good practice.
New Economy Breakfast Seminar – 13 July What Has Changed?
DSC Change Committee UK Link Future Releases Proposed Approach
DS3 and Qualifier Trials Update
Planning a Regional Approach
Exit Capacity Release Methodology Statement
Engaging Energy Consumers Energy Action, Fuel Poverty & Climate Action Conference - March 2017 Aoife MacEvilly Commissioner for Energy Regulation Regulating.
Review Group 291- Ofgem Update
Economic Regulation of Irish Water
Review Group 291- Ofgem Update
Ofgem presentation to Gas Transmission Workstream
Isaac Sokopo Group Electrification Planning Manager
Renewable Electricity Support Scheme (RESS) Update
Presentation transcript:

A Sustainable Future Powered by Electricity DS3 Workshop EAI Perspectives 14 th October 2013

A Sustainable Future Powered by Electricity DS3 Programme EAI supports the roll out of DS3 RoCoF and System Services workstreams are both critical and should be treated and implemented consistently and simultaneously. CBA should consider both workstreams and the delivery of 75% SNSP in the absence of RoCoF EAI supportive of work of TSOs to-date Recognise RA work required but this should not delay the implementation of the overall DS3 services and products for timeline critical for timely delivery of flexible investments and renewable investments Essentially critical to delivery of renewable targets for 2020

A Sustainable Future Powered by Electricity RoCoF Implementation PPA recognised that further studies are needed before a decision can be made on whether to approve the RoCoF grid code modification OEM resources are constrained Studies will not occur concurrently for generators Detail on how compliance testing will be verified not available – more detail and input from TSOs needed to enable studies Studies cannot practically be delivered within proposed 18 month timeframe TSO, OEM and generator collaboration needed to manage programme Not reasonable to impose penalties on generators making reasonable endeavours to assist in delivery of programme

A Sustainable Future Powered by Electricity RoCoF Cost There is a system wide benefit of delivering RoCoF change – it equates to a 10% SNSP increase It is undue discrimination to levy cost of change only on conventional generators as the benefit will be shared. Levying cost on generators will incentivise derogations as opposed to completion of studies/compliance. EAI Requests: 1.A collaborative programme to plan and deliver the RoCoF studies 2.Removal of penalties for generators engaged with collaborative programme 3.Socialising of the cost of the RoCoF studies across the market

A Sustainable Future Powered by Electricity Implementation of System Services from an Investor Perspective CBA needs to consider real counter-factual of DS3 not being delivered Given binding targets, impact of non-delivery of DS3 is the cost of extra capacity needed to deliver 40% target and subsequent additional system costs. TSOs have recognised that investment is needed to deliver necessary system services Infrastructure does not currently exist to deliver necessary flexibility. Market needs to provide added revenues to deliver investment – not simply a transfer from capacity market to enhance ancillary market. Phased implementation of products will not deliver required investment as investors may need suite of products to achieve business case.

A Sustainable Future Powered by Electricity Implementation of System Services from an Investor Perspective Market arrangements need to incentivise investments across technology types: Dispatch based payments drive uncertain revenue streams and therefore dis- incentivise investment. A minimum contract length of 7 – 15 years needed. A value based approach to pricing products should apply a price floor at Long- Run Cost of service provision. Market needs to be transparent and flexible to give confidence to investors and to provide signals for technology innovation. Market mechanism needs to be stable and not subject to on-going intervention and change.