7 May 2009Paul Dauncey1 Tracker alignment issues Paul Dauncey.

Slides:



Advertisements
Similar presentations
1 Calice Analysis 02/03/09 David Ward ECAL alignment update David Ward  A few thoughts about ECAL alignment  And related issue of the drift velocity.
Advertisements

1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
Alignment study 19/May/2010 (S. Haino). Summary on Alignment review Inner layers are expected to be kept “almost” aligned when AMS arrives at ISS Small.
LHCb PatVeloTT Performance Adam Webber. Why Upgrade?  Currently we de-focus the beams o LHCb Luminosity ~ 2x10 32 cm -2 s -1 o ~ 1 interaction per bunch.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
Using  0 mass constraint to improve particle flow ? Graham W. Wilson, Univ. of Kansas, July 27 th 2005 Study prompted by looking at event displays like.
28 Feb 2006Digi - Paul Dauncey1 In principle change from simulation output to “raw” information equivalent to that seen in real data Not “reconstruction”,
Status of Tracking at DESY Paul Dauncey, Michele Faucci Giannelli, Mike Green, Hakan Yilmaz, Anne Marie Magnan, George Mavromanolakis, Fabrizio Salvatore.
March 6th, 2006CALICE meeting, UCL1 Position and angular resolution studies with ECAL TB prototype Introduction Linear fit method Results with 1, 2, 3,
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
© Imperial College LondonPage 1 Preliminary Studies of the Tracking Resolution at DESY Hakan Yilmaz.
Page 1 Calculating the Beam Position at the Ecal for DESY Run (Independent of Tracking) Hakan Yilmaz.
1 Statistics Toy Monte Carlo David Forrest University of Glasgow.
Bill Atwood - July 2002 GLAS T 1 A Kalman Filter for GLAST What is a Kalman Filter and how does it work. Overview of Implementation in GLAST Validation.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
29 Mar 2007Tracking - Paul Dauncey1 Tracking/Alignment Status Paul Dauncey, Michele Faucci Giannelli, Mike Green, Anne-Marie Magnan, George Mavromanolakis,
1 Calice UK s/w meeting RHUL 24/1/06D.R. Ward David Ward Have previously reported on comparison of Feb’05 DESY data with Geant4 Monte Carlos. Issues with.
Karsten Büßer Beam Induced Backgrounds at TESLA for Different Mask Geometries with and w/o a 2*10 mrad Crossing Angle HH-Zeuthen-LC-Meeting Zeuthen September.
1.Check Laser track of B=0 run and exclude some tracks in order to get precise GGV eff, which in turn is used when extract T1, T2 value by pos-B and neg-B.
DHCAL - Resolution (S)DHCAL Meeting January 15, 2014 Lyon, France Burak Bilki, José Repond and Lei Xia Argonne National Laboratory.
1 RPCs - where do we stand? HARP Collaboration meeting, 7 July 2003 Jörg Wotschack.
Lecture 8 Simple Linear Regression (cont.). Section Objectives: Statistical model for linear regression Data for simple linear regression Estimation.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 1 Paul Dauncey Imperial College London.
M. Dugger, February Triplet polarimeter study Michael Dugger* Arizona State University *Work at ASU is supported by the U.S. National Science Foundation.
August 26, 2003P. Nilsson, SPD Group Meeting1 Paul Nilsson, SPD Group Meeting, August 26, 2003 Test Beam 2002 Analysis Techniques for Estimating Intrinsic.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
CMS WEEK – MARCH06 REVIEW OF MB4 COMMISSIONING DATA Giorgia Mila
Study of neutrino oscillations with ANTARES J. Brunner.
Study of neutrino oscillations with ANTARES J. Brunner.
19 July 2007Paul Dauncey - Software Review1 Preparations for the Software “Review” Paul Dauncey.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
© Imperial College LondonPage 1 Tracking & Ecal Positional/Angular Resolution Hakan Yilmaz.
1ECFA/Vienna 16/11/05D.R. Ward David Ward Compare these test beam data with Geant4 and Geant3 Monte Carlos. CALICE has tested an (incomplete) prototype.
05/04/06Predrag Krstonosic - Cambridge True particle flow and performance of recent particle flow algorithms.
Jyly 8, 2009, 3rd open meeting of Belle II collaboration, KEK1 Charles University Prague Zdeněk Doležal for the DEPFET beam test group 3rd Open Meeting.
Mark Dorman UCL/RAL MINOS Collaboration Meeting Fermilab, Oct. 05 Data/MC Comparisons and Estimating the ND Flux with QE Events ● Update on QE event selection.
Oct. 16, 1998Hobbs (thanks Hal)1 SMT Road Widths & Extra CFT Layers Current Situation Adding a 3rd CFT layer Using all 8 CFT layers Summary.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
, Dan Peterson Apparent inconsistencies and other issues in the xBSM measurements of IBS Scans We have studied the pinhole and CodedAperture.
Longitudinal shower profile - CERN electron runs Valeria Bartsch University College London.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
Update on Diffractive Dijets Hardeep Bansil University of Birmingham 12/07/2013.
Calibration of energies at the photon collider Valery Telnov Budker INP, Novosibirsk TILC09, Tsukuba April 18, 2009.
DREAM Coll. Meeting, Rome 2009F. Bedeschi, INFN-Pisa Template Analysis of DRS Data  Motivations  Preliminary results F. Bedeschi, R. Carosi, M. Incagli,
G. Eigen, Paris, Introduction The SiPM response is non-linear and depends on operating voltage (V-V bd ) and temperature  SiPMs need monitoring.
STAR SVT Self Alignment V. Perevoztchikov Brookhaven National Laboratory,USA.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
December, Calibration of electromagnetic calorimeter of Hall A DVCS experiment Eric FUCHEY Ph.D Laboratoire de Physique Corpusculaire.
Manqi Ruan Discussing & Support: Roman, Francois, Vincent, Supervisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua)) DQ Check for CERN Test.
9 Sep 2008Paul Dauncey1 Tracking software status Paul Dauncey.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
23 Jan 2012 Background shape estimates using sidebands Paul Dauncey G. Davies, D. Futyan, J. Hays, M. Jarvis, M. Kenzie, C. Seez, J. Virdee, N. Wardle.
11 Sep 2007Tracking - Paul Dauncey1 Tracking Code Paul Dauncey, Imperial College London.
A Study on Leakage and Energy Resolution
Michele Faucci Giannelli
Tracking System at CERN 06 and 07 test beams
Analysis Test Beam Pixel TPC
Validating Magnets Using Beam
Field quality to achieve the required lifetime goals (single beam)
Beam Tilt & TFC: Can we see a (MC) beam tilt?
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
EM Linearity using calibration constants from Geant4
Imperial laser system and analysis
Slope measurements from test-beam irradiations
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
Beam properties for run
Presentation transcript:

7 May 2009Paul Dauncey1 Tracker alignment issues Paul Dauncey

7 May 2009Paul Dauncey 2 General method Go through rec_v0406 files for CERN 2006 and 2007 Find tracking hits in each x and y layer; chose random one if more than one Find ECAL hit in first layer (if any) with largest energy Find average position over run of each layer and ECAL hit in both x and y Find correlated spread of these values For each run, have two (x and y) sets of averages and “error” matrices Use these to get alignment First look at averages; spreads are harder to interpret...

7 May 2009Paul Dauncey 3 Correlations of average x values, 2006 Good correlation for ~all runs Implies motion is due to beam, not tracking Means alignment was constant for all of 2006 Average position has shifted between Aug and Oct How to define x=0? Aug 2006 Oct 2006

7 May 2009Paul Dauncey 4 Correlations of average y values, 2006 Same conclusions for y Aug 2006 Oct 2006

7 May 2009Paul Dauncey 5 Correlations with ECAL in x, 2006 Looks reasonably stable Unexpected; ECAL was moved downstream by ~1.5m between Aug and Oct Note, ECAL position is not centred on zero Aug 2006 Oct 2006

7 May 2009Paul Dauncey 6 Correlations with ECAL in y, 2006 Not so good; clear shift between Aug and Oct Relative ECAL y position will need to be adjusted Also difference in slope... Aug 2006 Oct 2006

7 May 2009Paul Dauncey 7 ECAL angled runs Some runs had ECAL tilted from normal incidence How to get this information? Reconstruct angle from z dependence of hits for differing x

7 May 2009Paul Dauncey 8 ECAL angled runs (cont) Correlation of tracker and ECAL is washed out if using the angled runs Implies alignment of ECAL not correctly compensated for tilt Have not used these runs in previous plots Aug normal incidence runs Aug all runs

7 May 2009Paul Dauncey 9 Extraction of alignment values Need constant (t 0 ) and linear (v d ) values to convert TDC time to position x = v d (t-t 0 ) and similarly for y Nominal beam line is supposed to define x=0 Hence t 0 is “average” time of TDC hit Take some value in centre of range for all of 2006? Take two values; one for Aug and one for Oct? Semi-arbitrary but either will require ECAL to be repositioned Use ECAL as fixed “ruler” to give absolute scale of v d Use correlation of ECAL and tracker averages But... does not nail down system uniquely Does beam move because of angle or position?

7 May 2009Paul Dauncey 10 Beam shift vs tilt Assume beam motion is mainly position All averages move 1:1 Assume beam motion is mainly angular Averages move depending on z position; ~5% effect

7 May 2009Paul Dauncey 11 Typical fits, Aug mm/TDC unit 0.171mm/TDC unit Aug 2006 Values assume beam position, not angle, varies run-to-run Fits are limited in statistics Note: if beam was very stable, this method would not work

7 May 2009Paul Dauncey 12 Typical fits, Oct mm/TDC unit 0.163mm/TDC unit Oct 2006 Slope values differ, even though tracking correlations are stable Fit for y does not look good

7 May 2009Paul Dauncey 13 Correlations of average x values, 2007 Good correlation for ~all runs Alignment was also constant for all of

7 May 2009Paul Dauncey 14 Correlations of average y values, 2007 Same conclusions for y 2007

7 May 2009Paul Dauncey 15 Correlations with ECAL in x, 2007 ECAL motion; 3 or 4 different lines Would need to fit to each Lacking statistics; only ~70 runs total 2007

7 May 2009Paul Dauncey 16 Correlations with ECAL in y, 2007 Also see differing lines Even harder to fit slopes here 2007

7 May 2009Paul Dauncey 17 Using spread matrix Try to use spread in each run to cross check Measured matrix is in terms of TDC times and ECAL position The v d parameters convert measured time spreads to position spreads Spread arises from three sources Event-to-event beam spread around average Scattering in material in beam line Intrinsic position resolution of the tracker and ECAL Adjust parameters to best match measured matrix Need beam energy to know scattering So far not successful... Tracker-only matrix works well but no “ruler” to fix v d precisely ECAL spread seems physically too small; maybe chopping off spread due to finite size of ECAL? Needs further work...

7 May 2009Paul Dauncey 18 Basic check of nominal beam energy Check average energy deposited in ECAL in each run vs nominal beam energy 2006

7 May 2009Paul Dauncey 19 Basic check of nominal beam energy Check average energy deposited in ECAL in each run vs nominal beam energy  e  GeV? 2006

7 May 2009Paul Dauncey 20 Comments on FitConstants Currently has two scattering matrices for use in fitting 6×6 matrix for forward track fit; four tracking layers plus beam spot position and angle constraint 4×4 matrix for backward track fit; only four tracking layers Alignment matrix needed here is another scattering matrix Needs backward track fit matrix plus ECAL position (and maybe in future angle); 6×6 matrix Daniel has been calculating these from MC recently Choice Keep alignment matrix elsewhere; painful to ensure consistency Enlarge FitConstants to have two 6×6 matrices; not backward compatible with checked out code Also, do we put in single scattering matrix and scale by 1/E 2 ? Requires nominal energy to be absolutely reliable when running jobs Need to decide before we start to put Daniel’s values in the database

7 May 2009Paul Dauncey 21 Conclusions CERN 2006: tracker seems stable in Aug and Oct Alignment values still uncertain at 10% level Using ECAL depends on ECAL also being stable; maybe not? CERN 2007: tracker is again stable ECAL is not, so needs more work to extract alignment This method needs assumption on how beam moves run-to-run Cross-check using spreads Need beam energy reliably; always get zero for 2007! Need to understand position spread in ECAL