E906 Spectrometer Upgrade Overview Paul E. Reimer Magnet Concept Design Estimates (Money & Time)

Slides:



Advertisements
Similar presentations
Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
Advertisements

Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
AnDY at IP2 Infrastructure Requirements & Experimental Construction 1Charles Folz, BNL.
February 17-18, 2010 R&D ERL Ady Hershcovitch R&D ERL Beam Dump Ady Hershcovitch February 17-18, 2010 Beam Dump.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
MICE Spectrometer Solenoid Design and Fabrication Update Mike Green and Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference December.
Electromagnets Grade 8.
E906 Changes Paul E. Reimer 8 December 2006 Spectrometer Location Spectrometer’s 2 nd magnet Hodoscopes –Scintillator for Station 1 and 2 –Photomultiplier.
Takeyasu Ito University of Tennessee EDM Collaboration meeting December, 2004 Cost and Schedule Estimate WBS 2.5- Neutron beam polarizer/splitter for SNS.
Powered Magnets, DB Formation and Decelerator Alexey Vorozhtsov (JINR) International Workshop on Linear Colliders October 2010.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
E906 Spectrometer Upgrade Overview Paul E. Reimer Experimental Approach Impact on Fermilab Magnet Coil Fabrication Spectrometer Upgrades.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
PV-DIS Toroid Detector: outline and costs Paul E. Reimer 12 GeV PV-DIS detector meeting August 1.Introduction to Toroid Concept (presenting work.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
SBS Magnet John J. LeRose. Assembly drawing of 48D48 magnet as used at BNL (vertical field)
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
Magnets Paul E. Reimer 21 June Paul E. Reimer Magnets First Magnet Dual magnet spectrometer Proposal:SM3 coils and SM12 iron to construct first.
STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)
Design of DC septum magnets based on measurements and 3D calculation of an R&D septum magnet for Rapid Cycle Synchrotron of J-PARC Masao Watanabe, Accelerator.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
SHMS Spectrometer Update Hall C 2008 Users Meeting Paul Brindza January 18, 2008.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
NCSX NCSX Trim Coil Peer Review 11/6/07 1 Tom Brown Art Brooks Raki Ramakrishnan Mike Kalish NCSX Trim Coil Peer Review.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
PREX Mtg, July 2008R. Michaels, JLAB Warm Septum : Status Septum Team: Kees deJager, Paul Brindza, Javier Gomez, John Lerose, Al Gavalya, & me New Design.
SBS Magnet and Support Status Robin Wines June 2013.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Correctors for the J-PARC Proton Beam Line Peter Wanderer BNL Superconducting Magnet Div. September 8, 2007 T2K US B280 Collaboration Mtg.
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
NCSX NCSX TF Coil Conductor FDR 5/17/05 1 Michael Kalish NCSX TF Conductor.
PSB Reference Magnet (for the 2.0 GeV upgrade) A.Newborough 16 th October 2014.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
MSE Pulsed Septum for g-2 and Mu2e Design Review A. Makarov 2/11/2016.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
Neutral Particle Sweeper Magnet Paul Brindza Nov 17, 2014.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
WP15.4 Status March 2017.
CERN, 11th November 2011 Hi-lumi meeting
CBM magnet overview of the BINP work
Some Design Considerations and R &D of CEPCB Dipole Magnet
WORK IN PROGRESS F C C Main Quadrupoles FCC week 2017
Warm magnets for LHeC / Test Facility arcs
6th BINP-FAIR-GSI Workshop,
MICE Partial Return Yoke Mechanical Design
16 T Cosq DIPOLE Mechanical Analysis
News and brief overview of Beamline plans for the next few months
EuroCirCol: 16T dipole based on common coils (DRAFT)
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Arc magnet designs Attilio Milanese 13 Oct. 2016
Bore quench field vs. critical current density
CHEN, Fusan KANG, Wen November 5, 2017
Support Structure Fabrication
Main magnets for PERLE Test Facility
Block design status EuroCirCol
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Compact and Low Consumption Magnet Design The DESY Experience
Magnets and Electromagnets
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Updated concept of the CBM dipole magnet
Budker Institute of Nuclear Physics,
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Electron Collider Ring Magnets Preliminary Summary
Presentation transcript:

E906 Spectrometer Upgrade Overview Paul E. Reimer Magnet Concept Design Estimates (Money & Time)

2 11 December 2006Paul Reimer E906 Sepctrometer Upgrade Overview Magnet Concept Use pieces from existing (but dismantled) SM12 Magnet –This was the large dipole used by E866 and predecessors Design coils to minimize the need to cut existing iron Decrease nonBend aperture –to match downstream acceptance –Save on Amp-Turns Tapered pole pieces Copper Beam dump (either modified from E866/SM12 or new) Graded hadron absorber within aperture of magnet (Copper, Carbon, Polyethylene)

3 11 December 2006Paul Reimer E906 Sepctrometer Upgrade Overview 66” 198” 50’ (9 blocks long) 2£17” SM12 Removal

4 11 December 2006Paul Reimer E906 Sepctrometer Upgrade Overview M1 Magnet New coils Reuse whole pieces of SM12 magnet yoke (1/3 or total SM12 yoke) Beam dump either modified to fit or new (from Fermilab) Coil Design Team –Jack Jagger— Engineering (PHY- STA) –Ken Thompson— Field, power calculations, etc (APS) –Tom O’Connor and Kevin Bailey—design and drafting (PHY)

5 11 December 2006Paul Reimer E906 Sepctrometer Upgrade Overview M1 Magnet Parameter Length189 inCooling Water Width (Vert. Bend)95 in Temp Rise25^\circ C Height198 in Flow rate90 g/min ApertureWeight Bend48 in Pole Inserts9.5 t Non-Bend26 in Coils19 t Current2,400 A Yoke420 t Voltage240 V Total450 t Power0.58 MW

6 11 December 2006Paul Reimer E906 Sepctrometer Upgrade Overview Budgetary Estimates: Aluminum conductor Conductor Properties –Al 1350 Alloy –1.6 £ 1.6 inch –0.700 inch diameter hole for cooling Estimate From Alconex, Fort Wayne, IN –Will vary with base metal price –Investigating additional possible vendors ItemCost Base Metal ($1.25/lb)$59,400 Fabrication$186,700 Testing$13,700 Misc. (die, ship, etc.)$7,500 Total$267,300 × 1.2 (contingency) × 1.1 (Overhead) × 1.03 (inflation)$363,000

7 11 December 2006Paul Reimer E906 Sepctrometer Upgrade Overview Budgetary Estimate: Coil Fabrication Contacted 5 possible vendors in Fall 2004 for budgetary estimates based on preliminary designs—4 vendors responded by January 2005 Revisited estimates with 3 of 4 vendors for this review (Oct-Nov 2006) ConductorTooling and setup Coil Fabr.Ship.Total Everson Tesla Nazareth, PA Included$160k$703k$7k$870k Sigma Phi France $267k (our est.) 530 euro × 1.30 $/euro $689 $20k (our est.) $976k Alpha Magnetics Hayward, CA $267k (our est.) $74k$429k$9k$779k For budget, estimate is based on Sigma Phi total, but will use lowest bidder in which there is confidence × 1.2 (contingency) × 1.1 (Overhead) × 1.03 (inflation)

8 11 December 2006Paul Reimer E906 Sepctrometer Upgrade Overview M1 Magnet Coil Fabrication Budget Cost dominated by cost of conductor and coil ($1.3M of $1.6M) Tab. III of review document

9 11 December 2006Paul Reimer E906 Sepctrometer Upgrade Overview Coils: Fabrication time Schedule based on longest lead-time vendor: –Sigma Phi: 10 Months with conductor available 4 months before delivery –Everson Tesla: week (5 months) –Alpha Magnetics: no estimate Requested Budget—purchase coils over two years: –FY2007: Bid and contract for coils Purchase tooling this is delay is the critical path item –FY2008 (starting in Jan 2008)—this is delay is the critical path item: Purchase conductor Fabrication of coils

10 11 December 2006Paul Reimer E906 Sepctrometer Upgrade Overview Magnet Timeline Al Conductor delayed to FY08 Coil Fabrication delayed to FY08

11 11 December 2006Paul Reimer E906 Sepctrometer Upgrade Overview Conclusions Design of magnet is underway Sufficiently advanced enough to obtain reasonable budgetary estimates on coil fabrication from vendors Both budget and time line are based on conservative estimates