Anti-icing Study at O’Hare International Airport Professor: Barry J. Dempsey Graduate Asst.: Nathan M. Carroll.

Slides:



Advertisements
Similar presentations
WMD Crime Scene Management
Advertisements

BoRit Superfund Site Timeline
1 Certification of Compliance with New Meal Pattern Requirements.
Presented to: FAA Airport Pavement Working Group By: Murphy Flynn Date: April 24, 2012 Federal Aviation Administration Construction Update.
EDUCATOR EVALUATION August 25, 2014 Wilmington. OVERVIEW 5-Step Cycle.
Recent Lighting and Marking Design Challenges/Trends
PRACTICAL AIRPORT PAVEMENT M&R MANAGEMENT Y. Hachiya & M. Kanno Service Center of Port Engineering Tokyo, JAPAN 1 FAA Airport Pavement Working Group Meeting.
ROAD MONITORING TO PREVENT WEATHER PROBLEMS Miguel Ángel Rodríguez Jara Civil Engineer Head of Traffic Control Centre of Valladolid.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
Lecture 9 – Database Design
Monthly Composites of Sea Surface Temperature and Ocean Chlorophyll Concentrations These maps were created by Jennifer Bosch by averaging all the data.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Water | Slide 1 of 16 January 2006 Water for Pharmaceutical Use Part 4: Commissioning, Qualification and validation Supplementary Training Modules on Good.
1 Winter Operations Program Presented by Ken Greene October 10, 2011.
You can achieve 100% Energy Saving WHEN YOU TURN OFF THE LIGHTS.
1 The Stormwater-Pavement Interface in Cold Climates Washington State University: L. Haselbach/ S, Nassiri.
DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM.
California Air Resources Board Workshop November 3, th Street, Room 202 1:30 - 3:30 p.m. Aboveground Storage Tank Enhanced Vapor Recovery.
The Tiksi Hydrometeorological Observatory Program International Collaboration for Climate Studies U.S. Science Contact:
1 Draft Research Plan LIEE Process Evaluation Jane S. Peters, Research Into Action Collin Fellows & Kara Crohn Research Into Action Jackie Berger.
Effective Project Planning, Community Capacity Building, & Partnership Development in Indian Country LT Bradley Sherer Environmental Engineer Indian Health.
15th International Road Weather Conference February 5th - 7th, 2010 in Québec City, Canada By Naoto Takahashi*, Roberto Tokunaga* & Naoki Nishiyama **
Davenport University Strategic Planning, Goal Development and Budget Process December 15, 2009.
Title I Schoolwide Planning Comprehensive Needs Assessment Wednesday, October 24, 2012.
Real-time Observation Monitoring and Analysis Network Haihe LIANG, etc. TECO-2008.
Joint Hurricane Testbed An Update of the Joint Hurricane Testbed is funded by the US Weather Research Program in NOAA/OAR's Office of Weather and Air Quality.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008.
Integrating Airborne DWL and PBL Models in Real Time G.D. Emmitt, C. O’Handley, S. A. Wood and S. Greco Simpson Weather Associates WGSBLW Miami 2007.
FHWA - Pooled Funds Speed Summit By: Kurt Matias February 23, 2010
Project TX Strategies to Improve and Preserve Flexible Pavement at Intersections UTEP - Soheil Nazarian - Imad Abdallah - Carlos Solis Project Duration.
U.S. Department of the Interior U.S. Geological Survey Bee Lake Water Quality Monitor Data Summary Period of record: to 2/19/07.
NC Flood Plain LIDAR Use at NCDOT August 4, 2004 NC LIDAR Workgroup NCSU North Carolina Department of Transportation.
Planning, development and implementation of a Mobile Winter Maintenance Centre Authors: Bent Juhl Pedersen, M.Sc.EE, Danish Road Directorate Kim Niels.
Kaizen Event Flow Kaizen Facilitation Project Management.
NOAA Science and Technology for Maritime Security Michael Tosatto.
1 Distributed Big Data & Analytics University of Cincinnati – Geography/Climate Project/Research Title: Toward a Circumarctic Lakes Observation Network.
Working together to advance Road Weather Information Systems (RWIS) technology.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
ANTIDEGRADATION and THE BENEFITS OF PUMP LOGS FOR BATCH DISCHARGES Given by: Dan Murray, Terrell Hendren and Josh Frazier.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
A BRIEF OVERVIEW THE ‘SKINNY’ ON SLOS Adapted from Amy Breon, IU17, Presented by Emily Ostrom Graham, Troy Area SD,
Public Works Overview of Winter Salt Usage. Our Equipment The City of Mankato's Public Works Department plows 432 lane miles and uses an average of 2,400.
MDT’s Pavement Marking Program Mike Bousliman Montana DOT MQA Peer Exchange October 12, 2004 Madison Wisconsin “Ensuring a consistent level of retro- reflectivity.
1 The Use of METRo (Model of the Environment and Temperature of the Roads) in Roadway Operation Decision Support Systems The Use of METRo (Model of the.
Electronic PROCUREMENT IN MONGOLIA Gantsogt Khurelbaatar Ministry of Finance.
Preliminary Analysis by: Fawn Hornsby 1, Charles Rogers 2, & Sarah Thornton 3 1,3 North Carolina State University 2 University of Texas at El Paso Client:
Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 12: Assuming Management of an.
Advanced Topics in Algorithms SPRING TERM PROJECT Is worth 40% of your final grade Completed project with report is due in week th May,
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Nevada Next Generation 511 System 9 months to design, test and deploy
CUCSA Workgroup Chair Orientation
Unit 6 Application Design Sample Assignment.
Water for Pharmaceutical Use
Development of android app for estimation and visualization of irrigation water demand Prashant K Srivastava IESD, Banaras Hindu University
Global Youth Tobacco Survey (GYTS): Proposal Development
■Auto-collection of data from oversea field
Patti Caswell ODOT Maintenance and Operations Branch October 2017
Intern & Mentor Teacher Orientation
Runway Weather Information Systems & Grip
Process, timeline and overview
College of Alameda Integrated Planning and Budgeting Process
Follow up workshop 14 January on streamlining
Regional WIGOS Centre Tokyo
Circle Chart Template Process Name.
Steve Beningo Rural Intelligent Transportation Systems Specialist
Accreditation for Online Learning Programme (OLP)
Vibe Scout Friction Reduction Tool
2015 January February March April May June July August September
Accreditation for Online Learning Programme (OLP)
Presentation transcript:

Anti-icing Study at O’Hare International Airport Professor: Barry J. Dempsey Graduate Asst.: Nathan M. Carroll

BRIEF HISTORY  Winter of 2002, phase I testing began on textured aggregate coatings.  These Anti-icing Smart Pavement Overlays were evaluated for durability.  Preliminary observations demonstrate feasibility of installation process and durability.  Phase II began with installation of observation bed at O’Hare.

THE THEORY  The pavement overlay is placed on an existing pavement surface.  Anti-icing chemical is applied prior to icing conditions.  Icing conditions occur.  Anti-icing chemical are released from pavement.  Ice melts.

OUR GOAL  To perform a comprehensive observation of the test pavement under controlled conditions.  To perform complete analysis of all recovered data to determine the durability, performance and surface friction characteristics of the anti-icing pavement.

OBSERVATIONS  Visual Conditions  Weather Conditions  Surface Temperature  Operations & Maintenance

Visual  On-sight observation of entire test bed.  Photographic documentation.  Real time video feed of taxiway (24/7).

Weather Conditions  Daily climatic data collected from NOAA.  Climatic data utilized in the Enhanced Climatic Model (ECM).  Surface temperatures monitored with existing sensors.

Operations and Maintenance  Use of observational video to determine all activities that occur on the pavement along with quantity and duration of activities.  Documentation of O & M’s daily log of activities for correlation with video observation.

Equipment: De-icer and Brushes

INITIAL ACTIVITES  Camera system installed and fully operational by end of October  Run friction tests to establish baseline for anti-icing pavement and control.  Take core samples from test site

TIMELINE  November 1, 2004 –Begin complete observations of test pavement  January 1, 2005 –Submit interim report on findings  April 1, 2005 –Begin intense analysis of all accumulated data  August 2005 –Submit Final Report

Thank You Any Questions?