The Danish CDM Project Development Facility Financing CDM in Indonesia Erik Dugstad, Sr. Economist, ECON Analysis Agus Sari, Climate change specialist,

Slides:



Advertisements
Similar presentations
1 Sustainable Development Assessment of CDM projects in Georgia Mariam Ubilava Istanbul, Turkey January, 2008.
Advertisements

Performance Based Climate Finance Facility (PBC) Alejandro Miranda Velazquez Latin American and Caribbean Forum Carbon (LACCF) 2014 Bogotá, September.
Click to edit Master title style Climate Change and the Carbon Market October 2010 Ciska Terblanche TAPPSA 2010 Conference Durban, South Africa TAPPSA.
CDM and SSN: A winning combination. SSN and CDM Creating partnerships between South, South and North countries through the opportunity of the Clean Development.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
Conducting Carbon Projects Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
Current CDM experiences HeidelbergCement
Environmental Sustainability in the Extractive Industry: The Case for Climate Change Mitigation Dr Uwem E. Ite.
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
A Business Case for the Gold Standard Heidi Forbes Gold Standard and the Clean Development Mechanism Capacity Building Workshop 7 th December 2006.
-2- Opportunities for CDM/JI Projects Renewable energy Electricity generation and transmission Energy efficiency Fuel switching Waste management Oil and.
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth Power-Gen PAK rd International Conference.
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Carbon markets An international tool for cost-effective GHG mitigation.
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Global Carbon Market and CDM Potential in Cement Production Industry.
Emission reduction value in financing clean energy projects By Jan-Willem Martens EcoSecurities.
CDM implementation in Korea Gyungae Ha Center for Climate Change Mitigation Projects Korea Energy Management Corporation October , AIT, Thailand.
ECONOLER INTERNATIONAL CDM/JI Office Canada Development of a Portfolio of CDM Projects in Indonesia Access to CDM & JI office of Canada facility Presented.
1 Macroeconomic Impacts of EU Climate Policy in AIECE November 5, 2008 Olavi Rantala - Paavo Suni The Research Institute of the Finnish Economy.
The Role of the Designated National Authority (DNA) in preparation of CDM Projects 1 Designated National Authority for the Clean Development Mechanism.
Financing climate-friendly projects in the Balkan region DAC PROJECT CAPACITY BUILDING IN BALKAN COUNTRIES IN ORDER TO DEAL WITH CLIMATE CHANGE Prepared.
CDM Status in Pakistan Dr. Syed Sajidin Hussain Clean Development Mechanism Cell Ministry of Environment, Government of Pakistan
E8-GEF-UNDESA Financing Sustainable Electrification Dialogues HCB Initiative e8-GEF-UNDESA 'Financing Sustainable Electrification Dialogues' Human Capacity.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
The Danish JI Program UNFCCC Workshop on the Implementation of Article 6 projects under the Kyoto Protocol Moscow, May 2004 by Ulla Blatt Bendtsen,
Prasetyadi Utomo Ministry of Environment of Indonesia CD4CDM Workshop Pathumthani, Thailand 19 – 21 October, 2005 Indonesia’s Policy on CDM Implementation.
Title written in CAPITAL letters, broken into 2 lines, if it fits with the length of the words Optional: Cover this area with photo. Proportions are approx.
The policy and plan on CDM Forum MDP Maroc Marrakech, April Italian Ministry for the Environment and Territory Department for Global Environment,
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
© ESD 2003 IRIS KYOTO Achieving Carbon Finance: Carbon Funds and key issues (Including European Emissions Trading Scheme) Jeremy Doyle ESD, UK European.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Pakistan National Operational Strategy for Clean Development Mechanism.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
Practical issues in identification and development of CDM projects AIT, Bangkok, October 20, 2005 Soeren Varming Senior Consultant, Climate Change
The Netherlands - Bulgaria Economic Relations and Co-operation.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Challenges of CDM Implementation in Indonesia Architrandi Priambodo.
1 Summary National Workshop Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
PELANGI Solid-Waste Management and Financing: With Special Focus on CDM Agus P. Sari Managing Director Pelangi – Ecosecurities Alliance on Climate and.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Project Development Guidelines and CDM Activities in Pakistan
CDM: Quick Overview Matt Spannagle Technical Manager Millennium Development Goals Carbon Facility Bureau for Development Policy United Nations Development.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Standardized national/sectoral baselines UNFCCC Technical Workshop on Joint Implementation Bonn, 16 October 2007 Manfred Stockmayer Managing Director Camco.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
Challenges and Opportunities for Addressing Global Climate Change February 2006.
0 BARRIERS TO CDM PROJECT FINANCING Presentation to CDM Financial Mechanism Training Course 18 September 2003 Clean Energy Finance Committee.
CDM Development in Thailand Capacity Development for the Clean Development Mechanism Office of Natural Resources & Environmental Policy and Planning (ONEP)
Morten Pedersen Deputy Programme Director Danish Environmental Protection Agency Climate Change Division.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
The Danish CDM Project Development Facility Gustya Indriani Climate Change Researcher, Yayasan Pelangi Indonesia
Supporting Scaled Up Private Investments in Clean Energy Infrastructure. Washington, D.C., October 6&7, 2014.
Danish Project Experience
CDM –Functional Overview
What JCF observed in its
Indocement’s CDM Project
The Danish CDM Project Development Facility Financing CDM in Indonesia
Possibilities for promoting environmental protection projects
Presentation transcript:

The Danish CDM Project Development Facility Financing CDM in Indonesia Erik Dugstad, Sr. Economist, ECON Analysis Agus Sari, Climate change specialist, Pelangi Contact: – Phone:

2 Danish Climate Strategy Published by Danish Government in February 2003 Key issue: Introducing Kyoto Mechanisms to achieve cost efficiency Balance between domestic action and buying of credits defined in economic terms.  Maximum cost of domestic measures set at 120 DKK or approximately 20 USD pr ton of CO2-eq

3 Uncoupling of economic growth and CO2-emissions '89'90'91'92'93'94'95'96'97'98'99'00'01 GDPCO 2 -emission Primary Energy Supply

4 Share of Renewable Energy in Denmark Red: Share of electricity Blue: Share of total energy

5 Danish demand for Carbon Credits Danish EU-burden sharing target is reduction of 21% in compared to 1990-level Three sources of ”deficit” compared to target:  10 mill. Tons CO2/year from lack of success in achieving reductions i.e. in the transport sector  10 mill. Tons CO2/year from expected electricity export  5 mill. Tons CO2/year from (lack of) base year adjustment Projected total demand 25 mill tons CO2/year for 5 years or a total of 125 mill tons Government expected to buy 20% - The rest by private sector (mainly electricity sector)

6 Bilateral collaboration in focus Government purchases through pipelines of  Ministry of Foreign Affairs: Bilateral collaboration on CDM in Malaysia, Thailand, Indonesia, China and South Africa  Environmental Protection Agency: JI-projects in Eastern Europe  Multilateral Carbon Funds – A Danish Fund in the World Bank Incentives for private sector  EU Emissions trading scheme started 1. January 2005  Directive implemented that links emission trading and JI/CDM A Memorandum of Understanding between Denmark and Indonesia has been signed between Ambassador Andersen and Minister Witoelar on July 27, 2005

7 Huge CDM potential in Indonesia million ton CERs in the period Could create a value of million USD via sales + large local benefits for sustainable development Opportunities in many sectors  Cement  Oil and gas  Landfill and waste  Pulp and paper  Steel  Palm Oil  Electricity  Energy saving  Etc

8 Impact of CDM for landfill to energy projects Threshold for producing power from landfill gas is 150 tonnes of waste per day Emission reductions generated by avoiding methane emissions from deposited waste and displacement of grid connected fossil fuel plants Contribution from CDM is more than half of the electricity tariff The table below indicates impact CDM on IRR for different sizes of landfills

9 Impact of CDM for Palm Oil Mill Effluent Mill with capacity of 40 ton of Fresh Fruit Bunches per hour Power generated will be connected to the grid Contribution from CDM is more than half of the electricity tariff Impact of CDM is different per technology used

10 How to develop a CDM project? Projecttimeline CERs issued Pre-feasibility PDD Development ImplementationRegistration Final Host Country Approval Project Validation PIN Feasibility study Conditional Host Country Approval Financial closure Operation Monitoring Danida Project Development Facility Danida buys CERs

11 Transaction costs of CDM Project Feasibility and Due Diligence$5,000 - $10,000 Documentation (PDD)US$ 20,000 – $50,000, up to $100,000 with new methodology Public ConsultationAbout $2,000 – 10,000 Validation$8,000 - $15,000 Approval by the National Authority Currently free Registration to the Executive Board $5,000 - $30,000 (according to the project) Implementation of the CDM Project According to the project Underlying investmentAccording to the project MonitoringAccording to the project Verification$5,000 – $10,000

12 Benefits of participating You get a new income stream for your project – with no risk for you Danida takes all the CDM related risk Danida takes all the trouble getting the paper work done  Preparing a Project Design Document  Getting the PDD validated  Getting an Indonesian National Approval  Getting the registration at the CDM Executive Board Danida buys the CERs when they are delivered

13 Criteria for participating The underlying project must be technically and financially viable  The technical design  Financial viability/project financing  Legal and commercial status of the project The project should be likely to be approved as CDM project  Contribution to sustainable development  Likelihood of being additional  Existence of baseline methodology The project proponent is capable to implement the project  Technical and management capability  Financial solidity of the company

14 The formalities ActionDate Announcement of call for proposals 27 July 2005 Closing for proposals Pre-assessment/selection 3 October October - 21 November 2005 Announcement of results22 November 2005 Signing of Letter of Intent22 November – 29 November 2005 Second call with tentative closing date: 1 February 2006

15 Possible next step in the waste- management sector A number of workshops will be organised giving more information on the Project Development Facility  A follow-up workshop to develop Project Idea Notes (PINs) in the waste-management sector. If you have a project already then contact the project secretariat to get a template for a PIN.  A one-on-one consultation on project development and writing of PIN is possible.

Contact Secretariat of Danish CDM Project Facility c/o Royal Danish Embassy Menara Rajawali 25th Floor Jl. Mega Kuningan Jakarta Telephone: ext 114 Fax: Website: Or ECON (in Jakarta) – – Hp: Pelangi - – Phone: