RAMAGUNDAM- HYDERABAD-KURNOOL- GOOTY LINE HOW EARLY COMMISSIONING WOULD HELP.

Slides:



Advertisements
Similar presentations
NERC Footnote b / 12 – Load Loss
Advertisements

RES-E Impact on Transmission Grid and Power System Reserves
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
NORTHERN REGIONAL GRID SYSTEM CONTINGECY AND RESTORATION.
April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
Team BUSS Backup Storage Source. Team BUSS Idaho Power Company Backup Storage Source Project Title Extra High Voltage (EHV) Station Second DC Storage.
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
California Energy Commission Workshop Nuclear Power Plant Issues
Smart Substation Transport Services for the Distribution Grid Operator Josco C.P. Kester
The Technical &Economical Impacts of the Upgraded Rehab Power Plant in Jordan Eng. Mamoun Shehadeh Operational Planning Department National Electric Power.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
POWER GRID CORPORATION OF INDIA LTD
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Do now: An AC generator produces a peak voltage of 6V. It is connected to a heater which has 30Ω resistance. a)Calculate the peak current and RMS current.
Energy Storage Applications at AEP Emeka Okafor American Electric Power Presentation to SouthWest Electric Distribution Exchange May 7, 2009.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
POWER GRID CORPORATION OF INDIA LTD. SRLDC,BANGALORE.
Circuits with more than one resistor, then Watt happens? Series and Parallel are the 2 ways of connecting multiple resistors.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Discussion on Draft Restoration (Black Start)procedures.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Cheng-Ting Hsu Presenter: Cheng-Ting Hsu Cogeneration System Design for a High-Tech Science-Based Industrial Park Department of Electrical Engineering.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
SYSTEM OF SELF-SUFFICIENCY OF ELECTRICITY IN PEAK HOURS The generation system has a design capacity of 7.24 MW, to operate during peak hours and during.
Frankfurt (Germany), 6-9 June Astrid Petterteig, SINTEF Energy Research, Norway – Paper 0840 Presented by Dag Eirik Nordgård, SINTEF Energy Research.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
© ABB Power Technologies :\PTP\GF-CC\Arbetsmaterial Jan-16 HVDC Light – ABB’s technology for invisible transmission Per Haugland Head of ABB Power.
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
Aug, 2005 THE US BLACKOUT AUGUST 14, Aug, 2005 NORTH AMERICAN GRID INTER-CONNECTS THE INDIAN GRID AT PRESENT IS ALSO SIMILAR WITH THE SOUTHERN REGION.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
Transmission Tariff V.Balaji Chief Manager SRLDC.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
BANGALORE TRANSMISSION PLANNING
SEMINAR ON ISLANDING BY PAWAN. What is islanding? Normally all Power generators are interconnected to form a network called ‘GRID’. Some times it so happens.
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
UI SUMMARY BOTTLENECKS IN SR GRID RECENT GRID DISTURBANCES MERIT ORDER OCC PRESENTATION FGMO KAR DISTURBANCE REDUCING THE LOSSES IN GRID BUYING AND SELLING.
ENERGY CONSERVATION IN SR - A CASE STUDY
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
Grid Operations Update
HYBRID MICRO-GRID.
SSLB Running in Pump mode Transmission Loss optimisation
The National Grid Mains electricity is produced by ______________.
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
ISSUE OF CONCERN.
PRESENTATION COVERS Past/Present Power Scenario Issues involved
Circuits with more than one resistor, then Watt happens?
ECEN 460 Power System Operation and Control
Presentation transcript:

RAMAGUNDAM- HYDERABAD-KURNOOL- GOOTY LINE HOW EARLY COMMISSIONING WOULD HELP

RAMAGUNDAM-HYDERABAD- KURNOOL-GOOTY LINE IMPROVED NORTH-SOUTH CORRIDOR CONNECTIVITY IMPROVED NORTH-SOUTH CORRIDOR CONNECTIVITY ADDITIONAL ANCHORING OF SRISAILAM EVACUATION SCHEME ADDITIONAL ANCHORING OF SRISAILAM EVACUATION SCHEME LOSSES REDUCED BY 10.4 MW LOSSES REDUCED BY 10.4 MW KURNOOL SC LEVEL IMPROVED FROM 2394 TO 4568 MVA – LESS VOLTAGE EXCURSION KURNOOL SC LEVEL IMPROVED FROM 2394 TO 4568 MVA – LESS VOLTAGE EXCURSION GOOTY SC LEVEL IMPROVED FROM 3484 TO 4512 MVA GOOTY SC LEVEL IMPROVED FROM 3484 TO 4512 MVA ALL THIS WITHOUT CONSIDERING EXTRA 500 MW GENERATOR AT RGM!!! ALL THIS WITHOUT CONSIDERING EXTRA 500 MW GENERATOR AT RGM!!!

CLOSING DORMANT 220 KV INTERSTATE LINES WHAT STILL NEEDS TO BE DONE……………….

YERRANDAHALLI-HOSUR :- A SUCCESS STORY ORIGINALLY CONCIEVED AS 220 KV SINGARPET- PEENYA LINE – COMMISSIONED 24 TH NOV 1965 ORIGINALLY CONCIEVED AS 220 KV SINGARPET- PEENYA LINE – COMMISSIONED 24 TH NOV 1965 PEAK FLOW MW-66 MU FOR YEAR PEAK FLOW MW-66 MU FOR YEAR LILO’D AT SOMANAHALLI, YERRANDAHALLI IN KARNATAKA LILO’D AT SOMANAHALLI, YERRANDAHALLI IN KARNATAKA LILO’D AT HOSUR(OLD), HOSUR(NEW) IN TAMILNADU LILO’D AT HOSUR(OLD), HOSUR(NEW) IN TAMILNADU DORMANT FOR OVER A DECADE ( ) DORMANT FOR OVER A DECADE ( ) CHARGED IN RADIAL MODE 7 th SEPT 2002 CHARGED IN RADIAL MODE 7 th SEPT 2002 SYNCHRONISED TO THE GRID ON 7 th JAN 04 SYNCHRONISED TO THE GRID ON 7 th JAN 04 ADVANTAGES ADVANTAGES LOSS REDUCTION LOSS REDUCTION VOLTAGE IMPROVEMENT VOLTAGE IMPROVEMENT HELPED MITIGATE ICT FLOW AT SOMANAHALLI DURING DISTURBANCE HELPED MITIGATE ICT FLOW AT SOMANAHALLI DURING DISTURBANCE

CLOSING OF 220 KV KADKOLA-KANIAMPETTA LINE 220 KV KADKOLA-KANIAMPETA PARALLELD ON 220 KV KADKOLA-KANIAMPETA PARALLELD ON VOLTAGE IMPROVEMENT AROUND MYSORE AND KANIAMPETA (ABOUT KV) VOLTAGE IMPROVEMENT AROUND MYSORE AND KANIAMPETA (ABOUT KV) LOSSES REDUCED LOSSES REDUCED RELIABILITY OF SUPPLY AT KADKOLA AND KANIAMPETTA RELIABILITY OF SUPPLY AT KADKOLA AND KANIAMPETTA

CLOSING OF 220 KV SEDAM-TANDUR LINE ADVANTAGES ADVANTAGES LOSS REDUCTION BY 4 MW LOSS REDUCTION BY 4 MW ALTERNATE PATH FOR NSR-RCH ALTERNATE PATH FOR NSR-RCH FLOW WOULD BE IN EITHER DIRECTION FLOW WOULD BE IN EITHER DIRECTION 30% SENSITIVITY TO NSR-RCH TRIPPING 30% SENSITIVITY TO NSR-RCH TRIPPING CAN BE SYNCHRONISED ON TRIAL BASIS CAN BE SYNCHRONISED ON TRIAL BASIS PUT ON CLOSEWATCH FOR FEW DAYS PUT ON CLOSEWATCH FOR FEW DAYS