Problem 4: Okeechobee Road Stopped Control Analysis.

Slides:



Advertisements
Similar presentations
PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri
Advertisements

NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
Hcm 2010: roundabouts praveen edara, ph.d., p.e., PTOE
Capacity, Level of Service, Intersection Design (1)
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
Chapter 14: Basic Freeway Segments and Multilane Highways
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
Chapter 2 (supplement): Capacity and Level-of-Service Analysis for Freeways and Multilane Highways Objectives of this presentation: By the end of this.
Capacity Analysis CE 453 Lecture #14.
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
At-Grade Intersection
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
CTC-340 Signals - Basics. Terms & Definitions (review) Cycle - Cycle Length - Interval -. change interval - clearance interval- change + clearance = Yi.
Chapter 5: Traffic Stream Characteristics
2/27/06Michael Dixon1 CE 578 Highway Traffic Operations Lecture 16: Freeways Basic Sections.
Unsignalized Intersections CTC-340. Hmwk At end of powerpoint.
Chapter 3. Highway Design for Performance
Traffic Signal Warrants
Highway Capacity Software (HCS) – Part II
Highway Capacity Software Based on the Highway Capacity Manual (HCM) Special Report 209 Transportation Research Board (TRB), National Research Council.
Lec 5: Capacity and LOS (Ch. 2, p.74-88)
Lec 14, Ch.8, pp : Intersection control and warrants (objectives) Know the purpose of traffic control Know what MUTCD is and what’s in it Know what.
Analyses of Unsignalized Intersections
Chapter 17: Basic principles of intersection signalization (objectives) Chapter objectives: By the end of this chapter the student will be able to: Explain.
Design Speed and Design Traffic Concepts
CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.
Level of Service Section 4.5. Level of Service: The Basics MMeasure performance by density. RRatio of operating capacity to speed. UUnits: passenger.
Signalized Intersections
Martha Moore, P.E. Ghyabi & Associates October 10, 2014
CEE 320 Fall 2008 Course Logistics HW7 due today (9 total) Midterm next Friday (Wednesday review) Signalized Intersections (Chapter 7 of text) Last material.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Roundabout Capacity Analysis Framework Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers.
Ramps & Weaving.
Lec 17, Ch.9, pp : Capacity of freeway sections (objectives) Understand capacity and level of service are the heart of transportation analyses Understand.
Center for Advanced Transportation Education and Research University of Nevada, Reno Presenter: Cui Zhou University of Nevada, Reno Center for Advanced.
Freeway Capacity Analysis
ROUNDABOUT CHARACTERISTICS TTE DEFINITIONS TRAFFIC CIRCLE: u Any intersection designed around a central island ROUNDABOUT: u A traffic circle with.
Detailed Intersection Modelling Based on Analysis of the Interaction of Conflicting Traffic Movements Edwin Hull, Billy Kwok September 2011.
Introduction to Transport
Freeways and Multilane Highways CTC-340. HMWK Ch 13 Read Section 13.7 Ch 13 # 2, 3 Ch 14# 1, 4, 5, 6, 8.
Chapter 13: Weaving, Merging, and Diverging Movements on Freeways and Multilane Highways Chapter objectives: By the end of these chapters the student will.
Traffic Signal Timing Design Part II. Slide 2 What to do?  Distribute volume among lanes to Identify lane utilization Determine need for lane adjustment.
Problem 1: Determination of Facility Types for Analysis.
Roundabout Feasibility: Analysis Framework and Design Considerations Presented By: Jason D. Pack, P.E. Fred Choa, P.E.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
Case Study 1 Problem 3 Styner/Lauder Intersection Moscow, Idaho.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
Chapter 191 Chapter 19: Elements of Intersection Design and Layout Make an initial sizing of the intersection Make an initial sizing of the intersection.
HCM 2010: FREEWAY FACILITIES PRAVEEN EDARA, PH.D., P.E., PTOE UNIVERSITY OF MISSOURI - COLUMBIA
INTERSECTION MODEL COMPONENTS TTE 6815 K. Courage.
Problem 6: Route 146 Arterial Study We’re going to look at 7 intersections simultaneously: the Shenendehowa Campus entrance, Moe Road, Maxwell Drive, Clifton.
1 Intersection Design CE 453 Lecture Intersections More complicated area for drivers Main function is to provide for change of direction Source.
The New 2010 Highway Capacity Manual An Overview.
NC-54 at Farrington as Offset Intersection
Multilane Highway Capacity Analysis
HCM 6th Edition: Roundabouts
2a. Fully actuated signal - Improved T intersection
Problem 2: Moe Rd/Route 146 Intersection
Freeway Capacity and Level of Service
Chapter 3. Highway Design for Performance
Unsignalized Intersections
Problem 5: Interstate 87 Interchange
CE 3500 Transportation Engineering Saturation flow and signal LOS
Problem 3: Shenendehowa Campus
Case Study 1 Problem 2 Styner/Lauder Intersection Moscow, Idaho
Presentation transcript:

Problem 4: Okeechobee Road Stopped Control Analysis

Location and Configuration N

T Intersection Very wide median Might operate as separate conflict points Right turns removed N Observations?

Peak Hour Volumes What’s missing and why? What’s critical? How Critical? What do we need to analyze? Left Thru Right NB EB---2, WB Observations?

Sub-problem 4a Examine the capacity of the critical minor street movement (the northbound left turn) using the graphical solution presented in the HCM, without going through the full procedure

Conflicting Flow = 2010 vph Volume (257) vph Capacity (< 100 vph) NBLT HCM Exhibit 17-7 Conclusion: Volume > Capacity

What to do next? Normally we would stop at this point and declare that TWSC is not a viable choice In this case, we will proceed with more problems to illustrate more features of the TWSC procedure Conclusion: Volume > Capacity

Sub-problem 4b Invoke the full HCM procedure, treating the operation as a conventional TWSC intersection and ignoring the unusual separation between the conflict points. Conventional T Intersection Conflict Points Then examine the results to determine if our treatment was appropriate.

LOS Thresholds for TWSC Intersections (HCM Exhibit 17-2) LOSAverage Control Delay (sec/veh) A≤ 10 B> 10–15 C> D> E> F>50

Assumptions Analysis period=15 min No pedestrians No upstream signals PHF = 0.93 for all movements Level Terrain

Input Data EBTWBTNBLWBLNBR Volume Number of lanes Median storage N/A 4 vehN/A Percent trucks

Results EBTWBTNBLWBLNBR Critical gap (sec)N/A Follow up time (sec)N/A Adjusted flow rate (vph) Adjusted capacity (vph) N/A v/c ratioN/A % queue length (veh) N/A Delay (sec/veh)N/A ???67464 LOSN/A FFF Observations? While the HCM equations do not limit the range of v/c ratios for which delay may be computed, some software products impose limitations as a practical consideration

Results EBTWBTNBLWBLNBR Critical gap (sec)N/A Follow up time (sec)N/A Adjusted flow rate (vph) Adjusted capacity (vph) N/A v/c ratioN/A % queue length (veh) N/A Delay (sec/veh)N/A ???67464 LOSN/A FFF Why does the WBL have a higher capacity than the NBL when both movements have to yield to same conflicting volume of EB through traffic?

Results EBTWBTNBLWBLNBR Critical gap (sec)N/A Follow up time (sec)N/A Adjusted flow rate (vph) Adjusted capacity (vph) N/A v/c ratioN/A % queue length (veh) N/A Delay (sec/veh)N/A ???67464 LOSN/A FFF Because the HCM tells us that the critical gap and follow up times are both lower for a left turn from the major street than from the minor street. In other words drivers on the major street are willing to accept smaller gaps, so more vehicles can get through the same volume of conflicting traffic

Because of the wide separation of conflicts at this intersection, it should occur to us that we probably shouldn’t treat this situation as a typical urban intersection. So, we will examine the separation of conflict points in the next subproblem. N

Sub-problem 4c  Separate the conflict points for TWSC control and treat each conflict point individually. Separated Conflict Points Then compare the results with the treatment of the previous sub-problem.

Why will the separation of conflict points usually give a more optimistic assessment of the operation than the aggregation of conflict points into a single intersection? Separated Conflict Points Conventional T Intersection Conflict Points Because there is no need to adjust the potential capacity of any movement because of impedance from other movements

When is it appropriate to separate the conflict points? Separated Conflict Points Conventional T Intersection Conflict Points Only when the queue from one conflict point does not back up into an upstream conflict point

Input Data EBTWBTNBLWBLNBR Volume Number of lanes22111 Percent trucks204110

NB Left vs EB Through Subproblem 4b Capacity69 Subproblem 4c Capacity99 95% queue length (veh)24 Queue storage (veh)N/A Is storage adequate?N/A v/c ratio2.6 Delay814 LOSF Observations?

NB Left vs WB Through and Left Subproblem 4b CapacityN/A Subproblem 4c Capacity559 95% queue length (veh)2.4 Queue storage (veh)4 Is storage adequate?Yes v/c ratio0.46 Delay17 LOSC Observations?

WB Left vs EB Through Subproblem 4b Capacity168 Subproblem 4c Capacity213 95% queue length (veh)2.07 Queue storage (veh)3.06 Is storage adequate?Yes v/c ratio0.56 Delay41.7 LOSE Observations?

NB Right vs EB Through Subproblem 4b Capacity226 Subproblem 4c Capacity283 95% queue length (veh)25 Queue storage (veh)N/A Is storage adequate?N/A v/c ratio1.53 Delay287 LOSF Observations?

NB Right vs EB Through Have we used the proper procedure for analyzing the operation of the NB right turn? Is this really a TWSC operation?

NB Right vs EB Through Would it be better to consider this operation in the context of freeway merging Is this really a TWSC operation?

Sub-problem 4d Further Consideration of the Northbound Right Turn Intersection Merge Area

The HCM does not prescribe an explicit procedure for at-grade intersections with merge area characteristics. We must view the TWSC procedure as pessimistic because of the design of the merge area.

The logical next step would be to treat this entrance as a freeway merge, using HCM Chapter 25, which prescribes a procedure for estimating freeway merge area performance in terms of the traffic density. Density is used in all HCM freeway-related chapters as an indicator of congestion level. The density thresholds for each LOS are given in HCM Exhibit 25-4.

LOS Thresholds for Merging (HCM Exhibit 25-4) LOSDensity (pc/mi/ln) A≤ 10 B> 10–20 C> 20–28 D> 28–35 E> 35 FV/C>1.0

Assumptions and Parameters Right side entry, No other ramps present Driver pop. adjustment =1.0, PHF =1 10% Trucks and RVs Level terrain, 1200 foot acceleration lane Input DataEBTNBR Volume Number of lanes21 Free flow speed5535

Observations? EBTNBR Adjusted flow rate Merge area density17.7 pc/mile/lane LOSB Results

Problem 4 Conclusions HCM TWSC procedure applies to all movements except the channelized right turns, which may be eliminated from the analysis Conflict points may be separated because queues do not block upstream conflict points TWSC is not a viable control mode because it will not provide adequate capacity for all movements Problem 5 will therefore examine signalization of this intersection.

End of Presentation …