JFEX Uli Schäfer 1. Constraints & Numerology Assumption: one crate, several modules. Each module covers full phi, limited eta range Data sharing with.

Slides:



Advertisements
Similar presentations
JFEX Uli Schäfer 1 Mainz. Jet processing Phase-0 jet system consisting of Pre-Processor Analogue signal conditioning Digitization Digital signal processing.
Advertisements

GOLD down the drain Uli Schäfer 1 What’s left after Heidelberg.
JFEX Uli Schäfer 1 Uli Intro / overview / issues Draft, will change !!!! Some questions flagged.
GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Phase-0 Topological Processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
Programmable logic devices / tools Programmable logic devices are digital logic devices, providing combinatorial logic (gates, look-up tables) and flip-flops.
High-speed optical links and processors for the ATLAS Level-1 Calorimeter Trigger upgrade B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz,
ATLAS L1 Calorimeter Trigger Upgrade - Uli Schäfer, MZ -
GOLD Status and Phase-1 Plans Andi E. & Uli S. Uli Schäfer 1.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Phase-1 with new JEP Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 S-L1Calo upstream links architecture -- interfaces -- technology.
Hardware status GOLD Update 02 Feb Uli Schäfer 1.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
Phase-1 with new JEP Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 Mainz L1Calo upgrade activities news – BLT hardware/firmware status.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
Uli Schäfer 1 (Not just) Backplane transmission options.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 (Not just) Backplane transmission options Uli, Sam, Yuri.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Uli Schäfer 1 CP/JEP backplane test module What’s the maximum data rate into the S-CMM for phase-1 upgrade ?
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Uli Schäfer 1 (Not just) Backplane transmission options.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
Uli Schäfer 1 FPGAs for high performance – high density applications Intro Requirements of future trigger systems Features of recent FPGA families 9U *
JFEX Uli Schäfer 1 Mainz. Jet processing Phase-0 jet system consisting of Pre-Processor Analogue signal conditioning Digitization Digital signal processing.
FEX Uli Schäfer, Mainz 1 L1Calo For more eFEX details see indico.cern.ch/getFile.py/access?contribId=73&sessionId=51&resId=0&materialId=slides&confId=
Uli Intro / overview / issues
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
JFEX Uli Schäfer 1 Mainz Logos ? jFEX (inc. specific software/firmware & Tilecal input signal, options) 30'
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
L1Topo Status & Plans Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, S.Krause, S.Moritz, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Hardware status GOLD Generic Opto Link Demonstrator Assess the use of optical backplane connectivity for use on L1Calo Uli Schäfer 1.
1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee.
L1Topo-phase0 Uli Schäfer 1. Topo GOLD successfully used to explore technologies and initially verify 6.4Gb/s link integrity over moderate length electrical.
JFEX baseline Uli Schäfer 1 Uli. Intro: L1Calo Phase-1 System / Jets Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM.
S. Rave, U. Schäfer For L1Calo Mainz
Uli Schäfer 1 From L1Calo to S-L1Calo algorithms – architecture - technologies.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
L1Topo post review Uli Schäfer 1 Observations, options, effort, plans Uli.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
Latency / Tilecal o/e converters VME extender Uli Schäfer 1.
Uli Schäfer 1 Mainz R&D activities. Uli Schäfer 2 MZ R&D BLT has been built and tested (backplane transmission only). A few minor issues were found. Possible.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
L1 Technical Proposal: Phase 2 ● Slow progress on writing TP phase 2 – Distractions with beam and calibration – Also some things are still unclear ● Hence.
L1Calo Upgrade Phase 2 ● Phase 2 Functional Blocks? – Thoughts on L1 “refinement” of L0 ● Simulation framework ● Phase 1 Online SW Murrough Landon 2 February.
Phase2 Level-0 Calo Trigger ● Phase 2 Overview: L0 and L1 ● L0Calo Functionality ● Interfaces to calo RODs ● Interfaces to L0Topo Murrough Landon 27 June.
Phase 2 L1Calo/Calo Interface ● Introduction ● Calo RODs ● Granularity and algorithms ● Calo-L1Calo links ● L1Calo design? ● Summary Murrough Landon 9.
ATLAS calorimeter and topological trigger upgrades for Phase 1
L1Calo Upgrade Phase 2 Introduction and timescales
L1Calo Requirements on the DPS
Weiming Qian On behalf of the ATLAS Collaboration
L1Calo Phase-1 architechure
L1Calo upgrade discussion
ATLAS L1Calo Phase2 Upgrade
Generic Opto Link Demonstrator
Run-2  Phase-1  Phase-2 Uli / Mainz
(Not just) Backplane transmission options
Presentation transcript:

jFEX Uli Schäfer 1

Constraints & Numerology Assumption: one crate, several modules. Each module covers full phi, limited eta range Data sharing with immediate neighbour only, for practical reasons sensible baseline is eta coverage of 0.8 per module for full eta coverage we need 8 modules maximum environment size of 0.9 in eta maximum environment requires 100% duplication ! Each module will carry several FPGAs assume 8 FPGAs, covering 0.8×0.8 (η×φ) each total of 64 FPGAs for jFEX processor compares to total of 32 jet FPGAs for current JEP Seems reasonable due to intended improvement on granularity go for high density optoelectrical components design for short electrical traces of high speed links Latency aware Uli Schäfer 2

Components for 2018 Conservative approach: plan for devices only that are in the pipeline already now Virtex-7 : baseline XC7VX415T Mid range Several foot print compatible, larger devices exist 48 GTH links (line rate dependent on speed grade/price tag) Nothing currently known about possible gaps in line rate range 12-channel opto devices at ~10Gb/s can reasonably expect that microPOD will be a viable option by then (fall-back to miniPOD) Expect to use ~48-fibre bundles Basically design jFEX along the lines of L1Topo, with higher FPGA count and board-level data paths optimised for sliding window algorithm Uli Schäfer 3

Data replication > No replication of any source into more than two sinks Forward duplication only Avoid any data retransmission Fan-out in eta handled at source only (DPS) Try to persuade DPS to do duplication at the parallel end (on-FPGA), using additional MGTs Possible fall-back: optical fibre splitting, if optical power budget permits (probably more expensive and bulky than parallel duplication) Fan-out in phi handled at destination only Consider passive electrical splitting of 10Gb/s signals Active signal fan-out would compromise design density Fall-back: retransmission on parallel links  latency penalty of more than 1 tick (SelectIO SerDes). Uli Schäfer 4

How to fit on a module ? ATCA 8 processors 2-4 microPODs each Passive fan-out Small amount of control logic Electrical backplane basically unused Uli Schäfer 5

Bandwidth vs. granularity Let’s do the math for the suggested scheme. Go for the extreme. Do a rough estimate: Environment 0.9×0.9 Each FPGA receives fully duplicated data in eta and phi: 1.6×1.6 worth of data required for a core of 0.8× ×0.1 in η×φ Maximum aggregate bandwidth 10Gb/s line rate) of chosen FPGA is 48*8Gb/s=384Gb/s per bin : 384/256 Gb/s = 1.5Gb/s, i.e. 37 bit That’s probably ~ 3 energies Scalable to some extent by choice of FPGA and line rate  We will be able to route large data volume into the jFEX processor chips, at large environment and at required granularity Uli Schäfer 6

fibre count / conclusion Due to full duplication in phi direction, exactly half the signals are routed into the modules on fibres 192 fibres 16 × 12-channel opto receivers 4 × 48-way fibre bundles / MTP connectors The 8-module jFEX seems possible with ~2013’s technology Allows for both sufficient granularity and large environment Can DPS handle the required duplication? How to arrive at sufficiently dense fibre contents for phase 2 (eta orientation of tile RODs ?) ? Is passive electrical splitting feasible ?  Start to explore technologies and feasibility soon Some further (last minute) remarks on next slide Uli Schäfer 7

And further… Some last minute remarks (triggered by Sam’s comments) Readout density into L1Topo would probably be low, leading to high fibre count into L1Topo (1 fibre per FPGA = 64 fibres total) Probably depends on determination to avoid upgrade of L1Topo for phase-1 Consider merger FPGA (comes at the expense of more than 1 tick of additional latency) Not sure about maximum fibre density on a MTP/MPO connector. People talking about 72 fibres per connector, though at higher optical losses compared to 48-fibre variant ! Readout into LVL-2 and DAQ will be included. Aiming at use of mini/microPOD at whatever data rate required by future RODs (or ROBins, in case on-board RODs are used) Towers.1×.1 with aggregate bandwidth of 37bits per tower available for total of e and h sections (no attempt made to sort out contents per fibre) Each module covering core of nominally.8 in η (different at FCAL) 8 FPGAs per module, each covering core of.8×.8, including environment: additional 4 bins each at +/-eta, +/- phi total data processed on one FPGA: 1.6×1.6 worth of data Uli Schäfer 8