1 Day Ahead Auctions Making progress, Jour Fixe Day Ahead Auctions pilot 14 th of September 2007 Jour Fixe The Hague Conclusions and homework Chair DTe.

Slides:



Advertisements
Similar presentations
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Advertisements

Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Bente Danielsen, ERGEG Transparency Project Team leader Alain Taccoen, ENTSO-E WG Market Information and Transparency, convenor Florence Forum June 2010.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Early implementation of CAM : PRISMA initiative GRI South – SG Meeting Madrid, 30 April 2013.
Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure.
Gas Regional Initiative – North West Region The Hague 13 December 2007 Day Ahead On x-borders of 2008 Presentation to the RCC.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Gas Regional Initiative – North West Region Bonn 28 April 2009 Fiete Wulff Capacity Project C1 Short-Term Capacity (STC) Operators’ Group Update.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.
GRI NW Investment - From virtual to measurable support Update on project Common effort on making regional investment happen Hague 4 june 2010.
1 Brussels workshop: 26 and 27 February 2009 Conclusions and minutes Workshop 26 – 27 February 2009 GRI NW Investment I1- Virtual Test/Business Simulation.
Investment workstream 20 October 2008 Investment project (I1)‏ Update on Consultation Presentation at account and by project manager.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
6th RCC Meeting – Region South-South East 30th March 2007, Milano.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
1 Conclusions Stockholm workshop GRI NW Investment I1- Virtual Test/Business Simulation (“recorded and agreed at the workshop”)
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Working on investment climate in the NW-region Update By projectleader Investment I1 GRI North-West Investment workstream
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Madrid Forum, 17 October 2007 Gas Regional Initiative Coherence and Convergence.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
Walter Boltz, ERGEG Vice President 18 th Madrid Forum 28 th September 2010 Capacity allocation in natural gas transmission networks Pilot framework guideline.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Welcome to the Workshop on Interconnection Points: Welcome to the Workshop on Interconnection Points: Taisnières / Blarégnies / Quévy Oude Statenzijl /
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Gas Regional Initiative – North West Region Governmental Meeting 6 May 2010 – The Hague Secondary capacity markets Project update Betsy ANNEN – CRE Bernhard.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Gas Regional Initiative – North West Region London 13 and 14 November 2008 Project manager: Erik Rakhou Investment project – I1 (in co-operation with I2)
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project Project.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Conclusions workshop Dublin.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Gas Regional Initiative – North West Region Paris Workshop 11 May 2007 Workshop on Interconnections & Primary Capacity Market Kick-off Meeting on IP 14.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Day Ahead Auctions Making progress, Jour Fixe 3rd Jour Fixe 31st of May Chair DTe Slides for the day.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
Gas Regional Initiative – North West Region RCC meeting The Hague – 5 th July, 2010 Secondary capacity markets Project update.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Transparency Project GRI NW Region
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
2009 TSO Transparency Gas Regional Initiative North-West
Informal document GRPE-74-20
Gas Regional Investment Plan project
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
Structure of presentation
Presentation transcript:

1 Day Ahead Auctions Making progress, Jour Fixe Day Ahead Auctions pilot 14 th of September 2007 Jour Fixe The Hague Conclusions and homework Chair DTe

2 Day Ahead Auctions Making progress, Jour Fixe Conclusions of the Jour Fixe, 14/9/07 Secondary Firm (1) Legal framework –Legislation Legal paper (incl. latest update by BNetzA for JF ) to be forwarded to the RCC (by 25.09) and eventually to the Gas Forum. –Additional comments to be sent to Cecile Gommans, DTe prior to 19th sept. –Cecile will contact CREG about the status of and input by market players at the Fluxys contract Summary of letter from APX to the DG TREN and DG COMP will be distributed before Monday 17th sept. –Reaction to this summary to APX before the 20th of Sept. Aim is to have response from EC before 24th of October. EFET will send letter to Cecile on their view that a cross-border price-cap on bundled products is illegal –Contractual work EFET develops and publishes blueprint for standard (Dutch) agreement by 5th Oct –Meeting is to take place between EFET and GTS in the next two weeks. Meeting is to take place between EFET (platform operators) and TSOs on 15th or 19th of Oct. - hosted by Volker Schippers, EGT. –Key-aim is to answer if the EFET proposal (see 1 st bullet) fit the German and (Danish) framework of the pilot »Aim is also to identify the differences and similarities in the Transmission Conditions of the different TSOs.

3 Day Ahead Auctions Making progress, Jour Fixe Conclusions of the Jour Fixe, 14/9/07 Secondary Firm (2) Technical interface –Meeting on 11th Oct 2007 between platform operators and TSOs – hosted by BEB in Hannover. Aim is to initiate standardisation of protocols and interfaces. On the basis of meeting a tentative timeschedule for standardisation will be presented before 24th Oct Central Counterparty Party (CCP) vs. Blackboard? –Quick win for now: both solutions (with or without CCP) will remain optional. April 2008, based on results of the pilot and any new legal information, Day Ahead group to make a recommendation. Decision remains with the market. Way forward for secondary –We now try ‘to let the child walk by itself’ on secondary market. –To facilitate regulators summarise all conclusions and work done in consolidated paper before the 24th of October. –If required, in telco on 22 October and/or JF of in Hague update –An evaluation moment in April of 2008 (when the pilots are running).

4 Day Ahead Auctions Making progress, Jour Fixe Conclusions of the Jour Fixe, 14/9/07 Primary Interruptible (1) See slides of Operators attached and Information requirement by EFET. TSOs committed to presenting a description for alternative for full bundling of X-border interruptible products. –An interim update possible in telco on –To be distributed to the group by –To be presented in next JF , Hague DTe is to inform the lead-regulator of Transparency (and Primary market) on the discussions on interruption information today. –As input for the 19 th of Sept. workshop in London on transparency –The request of the group is ‘guidance on general requirements for transparency for interruptible products’ for the region All operators stated that they comply with EU legal requirements Best practice was presented by GTS. This presentation of information was deemed as ‘very good’ by EFET. –See See also on requirement the attached sheet by EFET.

5 Day Ahead Auctions Making progress, Jour Fixe Then after the 19 th of September, RCC (25.09) should take a decision which work on interruption information is taken on in Transparency and which work can be done in Day Ahead pilot or Primary markets (e.g. pilot- wise). An interim update possible in telco on If any work decided, then to be distributed to the group by and to be presented in next JF , Hague EFET and Enabler group to present their findings on relation between interruptible and firm products as concerning ‘paying double for the same capacity’ (this is postponed homework presentation from ) –An interim update possible in telco on –Then to be distributed to the group by and to be presented in next JF , Hague Conclusions of the Jour Fixe, 14/9/07 Primary Interruptible (2)

6 Day Ahead Auctions Making progress, Jour Fixe As next step to more information and bundling of X-border interruptible day ahead product: –TSO’s to update an overall plan for going forward on building a platform for interruptible product (so no investment asked, just a more detailed plan then we had in Bonn) To include condition precedent that such a platform is needed by market. An interim status on this request in telco on , subject to the progress made on this work. To be distributed to the group by To be presented in next JF , Hague Conclusions of the Jour Fixe, 14/9/07 Primary Interruptible (3)