COMPLIANCE UPDATE ERCOT ROS Meeting April 9, 2002.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
TECHNICAL OPERATION SUBCOMMITTEE Report to Operating Committee June 10 – June Gary S. Tarplee - Chair.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Standards Development: Update to IMO Regulatory Standing Committee May 14, 2003.
Cyber Security 2005 ERCOT COMPLIANCE ROLLOUT Lane Robinson Reliability Analyst.
NERC and Regional Efforts to Ensure Reliability Dave Nevius, NERC Sr. VP David Cook, NERC VP & General Counsel Louise McCarren, WECC CEO Don Benjamin,
Reliability Standards Update
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
ERCOT’S COMPLIANCE ASSESSMENT and ENFORCEMENT PROGRAM March 23, 2005.
1 Texas Regional Entity Report December Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial.
Texas Regional Entity Compliance Report TAC July 9, 2009.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
NSRS deployment April John Adams ROS – May 12, 2005.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
April 23 rd OWG UFLS Survey & Power Factor Review.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Status Report for Critical Infrastructure Protection Advisory Group
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Texas Regional Entity Compliance Report Board of Directors May 19, 2009.
Reliability and Operations Subcommittee Report Presentation to the ERCOT Technical Advisory Committee January 6, 2005.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
June 17, Strategic Framework Business Definition and Strategic Issues Board of Director’s Meeting June 17, 2003 ERCOT Strategic Planning Task Force.
Business Practices Subcommittee Update Executive Committee Meeting October 20, 2015.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
NERC Compliance Enforcement Program 2002 C ompliance E nforcement P rogram ************************************************* Regional Seminars ERCOT 03/07/02.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
November 2, 2006 LESSONS FROM CIPAG 1 Lessons from Critical Infrastructure Group Bill Bojorquez November 2, 2006.
Texas Regional Entity Report Mark Henry June 6, 2008.
ERS Update – DSWG Presentation September 21, 2012.
Business Practices Subcommittee Update Executive Committee Meeting April 29, 2014.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
NERC STANDARDS ACTIVITIES 2/15-3/10. DATE NERC ANNOUCEMENT 03/07/07 Nuclear Plant Interface Coordination Standard Drafting Team Conference Call and WebEx.
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
Compliance Update Larry Grimm ERCOT Compliance To The ERCOT Board of Directors September 20, 2005.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
© CONSTELLATION ENERGY GROUP, INC. THE OFFERING DESCRIBED IN THIS PRESENTATION IS SOLD AND CONTRACTED BY CONSTELLATION NEWENERGY, INC., A SUBSIDIARY.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
= © Property of ERCOT 2001 ERCOT Response to the Nov. 5, 2002 Operational Audit Briefing to ERCOT Board of Directors November 19, 2002.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
PRS Workshop- NPRR755/NOGRR154 WAN communications of Critical Market Data and Agency-Only QSE Feb 29, 2016.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
ERCOT Technical Advisory Committee June 2, 2005
Compliance Report to ERCOT TAC February 2007
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Presentation transcript:

COMPLIANCE UPDATE ERCOT ROS Meeting April 9, 2002

NERC SAR’s Blackstart Abnormal Conditions Coordinating Interchange Coordinating Operations Disturbance Conditions Facility Ratings Operating within Limits Physical Connection Requirements Protection Systems Transmission Assessments

Support for SAR Process – NEED ROS APPROVAL ERCOT will draft response Forward to ROS and to relevant working groups Ask chairs to gather comments, or concur with ERCOT view TIME IS SHORT. Due early May to NERC

NERC Compliance Enforcement Program Background – Overall Program/Process  NERC CEP Is Beginning Its 4 th Year.  New Measurements Were Introduced for Field-testing During Each of the 1 st, 2 nd, and 3 rd Years.  New Measures for the 4 th Year Have Been Delayed  NO New Standards Will Be Introduced Unless They Have Been through the New Standards Process.  Current Operating Policies Do NOT Support Formal Compliance.

How Did We Do? Compliance Program Major Objectives  Field-tested 30 “New” Planning Measures and 1 “New” Operating Measure  Further Refine the Process  Conduct Audits – Both Reliability Authority (Formerly, Called Security Coordinator) and Control Area  Continue TLR Investigations  Initiated When TLR 5 (Firm Curtailments) Occur

2001 Compliance Program Preliminary Results

2001 Report to NERC Planning – evaluated 39 measures, 98% compliance, $14000 possible fines Operations – evaluated 13 measures, 91% compliance, $816,331 possible fines Other non-compliance exists – QSE’s not assessed; generator modelling not assessed; small TDSP’s not assessed

NERC TSOLV PENALTY MATRIX

REPORTED 2001 ERCOT TSOLV’S

2002 NERC Compliance Basically, repeat activities from 2002 Schedules and measure details will be posted on the website Generator information will be followed up, rather than re-certified. QSE reviews will continue

ERCOT Specific Issues 2002 (Protocol Compliance) Net dependable capability testing – use old RSS templates as a pilot Reactive testing – same as above QSE frequency control performance Execution of ERCOT dispatch instructions QSE qualification process

Frequency CONTROL Study Consultant hired Interviewed stakeholder representatives and ERCOT staff Initial data for analysis has been collected or is being collected Howard is staying on track to supply preliminary assessments at the end of May

Transmission Issues The annual underfrequency load shedding survey will be conducted on May 9. Security criteria violations – TO’s are sending log information, ERCOT Operations and Compliance reviewing. Planning issues. ERCOT expects compliance with the schedules and procedures of its working groups.

Other Issues from Operating Guides, Etc. Load as a resource Reactive standards Power system stabilizers

QSE/Generation Issues Modelling. Working with System Planning to first identify which are complete, will begin “discussions” with those who are not. 4 ½ QSE’s reviewed for energy emergency plans and real time. Compliance has asked for data from QSE’s to support the frequency study, disturbance analysis and explanation of “apparent Protocol violations”