Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &

Slides:



Advertisements
Similar presentations
Status of the ATLAS MM project
Advertisements

UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
27 Oct. 2000TGC Simulation video meeting1 Trigger Simulation Hisaya Kurashige KOBE Univ.
20 Feb LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
Dec 11, 2001E. Hazen -- ATLAS Muon Electronics1 ATLAS MDT Electronics On-Chamber CSM Adapter Proposed Features: –Mounts on CSM Motherboard just like the.
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
© The Association of Independent Schools of NSW Preparing for the ASQA Audit.
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
US Organization 05 April 2013U.S. ATLAS Electronics Meeting at BNL1.
CPIS 357 Software Quality & Testing
RLT-MS HSE-MS Hydrocarbon MS Asset MS Administration MS RMS - GOVERNANCE Current Owners Willem Schoeber/OG Pieter Hoek SCITE Niels Sopnel GAME PSI Tim.
Industrial Engineering Roles In Industry
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Georgia Institute of Technology CS 4320 Fall 2003.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
System Implementation System Implementation - Mr. Ahmad Al-Ghoul System Analysis and Design.
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Process: A Generic View
Project Preparation StepWhoHowResult Analyze project scope (What is the point?) PM + teamStrategy meeting Project goals Select product (Scope of investigation.
MM detector construction One or several modules per sector considerations.
M. Bianco On behalf of the ATLAS Collaboration
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
ATLAS micromegas activities (MAMMA)
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Atlas Computing Planning Helge Meinhard / CERN-EP Atlas Software Workshop Berkeley, 11 May 2000.
Testing Maturity Model (TMM). Introduction For the past decade, the software industry has put substantial effort in improving the quality of its products.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Construction of Computational Segment at TSU HEPI Erekle Magradze Zurab Modebadze.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
Enrique Calvo Alamillo Ds DHCAL m 3 modular structure. 2. Basic modular distribution. 3. Guiding and repositioning system. 4. Detector.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
Realizing and Operating Enterprise Systems. Objectives  Outline the realization phase  Discuss transition approaches  Describe enterprise system operations.
Micromegas for SLHC A project to investigate the use and determine the working parameters of Micromegas for SLHC tracking – in conjunction with the ATLAS.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
NSW Electronics Preliminary Design Review Feb 2015 Introduction and Review Scope Feb 2015 NSW ELTX PDR S. Zimmermann 1 Stephanie Zimmermann.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
Padova, 10 Febbraio 2014 ALICE ITS Upgrade Visita Referee - Sezione di Padova.
ICT industry briefing Review of Procure IT v3.1 Customer Contract 16 February 2016.
NSW SG 10 Dec Nov 2014 S. Zimmermann, NSW SG 1.
Project definition and organization milestones & work-plan
WBS 1.03 Readout Systems Scope, Cost and Schedule
Concluding remarks E. Migneco
Optical data transmission for
nSW Alignment Installation
MicroMegas Mechanical Meeting --- Cern April 2014
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Quality management standards
ATLAS Muon Spectrometer and
Policy group on Statistical Cooperation , October 19-20, Skopje
E&P HSE Audit Process (Simplified)
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Plans for the 2004 CSC Beam Test
Presentation transcript:

Micromegas NSW issues Tasks list

Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader & project management  TDR (2012/13)  Layout & integration  Chamber design, industrialization, and work in institutes  Electronics production  Trigger/DAQ  Software issues  Simulation  Analysis

Chamber design  Layout & integration into ATLAS  Layout & contact to NSW design engineers  Chamber design & realization  Design of multilayer  Design of spacer & support structure  Alignment  MM design optimization  Board layout & production aspects  Connectivity

Industrialization  Production engineer  Organization of production in industry and institutes  Planning  Procurement  Follow-up  Quality assurance policy

Electronics & services  Trigger/DAQ system  Front-end electronics (on-chamber)  Design, system layout  Procurement  Testing  DCS  Services  HV system  LV/cooling  Test sites & procedures

Software & analysis issues  System simulation  Data preparations  Monitoring  Analysis s/w, integration into Athena framework ???

TDR & Module0 (2013?)  TDR  Expected in 2013 (?)  Editor ?  Module 0  Design  Planning & follow-up  Production  Assembly  Evaluation