Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG.

Slides:



Advertisements
Similar presentations
A SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas. A SharePoint site is a tool.
Advertisements

1 EMBRAER VISION FOR IFE SYSTEMS Aristides Cintra
Dr. Barbara M. Wheeling Associate Professor College of Business Director of Accreditation and Assessment MSUB Coordinator of Institutional Assessment.
P09233 Flight Parameter Measurements Michael Skube & James Hunt P09233
COMMUNICATIONS GROUP SOUTH AFRICAN AIRWAYS, UNITED AIRLINES, EMIRATES, WEBER AIRCRAFT, LUFTHANSA, INFLIGHT PERIPHERALS, SICMA AERO SEAT, LABINAL AERO SYSTEMS,
What is a project? Project Management Institute definition
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
Communications / Design Process n Communications and Design Process Teams Combined – Many original team members absent – Many new team members – BAS, Teac,
Development plan and quality plan for your Project
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
SoNDa Sensor Network for Data Explore! 1. SoNDa Sensor Network for Data Explore! KEYWORDS Wireless Sensors Communication 2.
Auditor Responsibilities January 16, 2014 State Training Webinar 2014 CSP Contract Compliance Audit 1 AD14002.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Release & Deployment ITIL Version 3
Commerce, a.s., Bratislava
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Work Breakdown Structure
XML Working Group Joan Ugljesa NDIA PMSC January 31,
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Committees Working Party Executive Officer – Briefing Session April 2013.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
SIUE Injury Tracking System Project Plan. Team Members: Robbie Marsh Robbie Marsh –Project Manager/Webmaster Ken Metcalf Ken Metcalf –Lead Programmer.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
VENDOR MANAGED INVENTORY A Presentation to …. Copyright NetVMI, Inc.2 DISCUSSION POINTS How does it work How does it work How to get started How.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Module 18 | Slide 1 of 12 January 2006 GMP Inspection Process Preparation for the Inspection.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Module 12 Session 12.1 Visual 1 Module 12 Terminating the Project Session 12.1: Terminating the Project.
SATELLITE TV CONTENT Satellite Television Vendor Product/Service Quick Reference Guide Presenter: Carmen T. Arias-Knox SPAFAX Consulting.
Managing EERE Web Projects Presenter: Allison Casey January 30, 2008.
Objectives 4 Understand the importance of communication in projects 4 Understand the need and importance of project management.
WAEA Seat/IFE Integration Workshop February 17-18, 2000 AEEC AND ARINC 628 OVERVIEW AEEC ARINC ARINC Cabin Equipment Interface.
By Daniel O’Brien and Scott MacDougall. Daniel O'Brien and Scott MacDougall comprised the development team and shared an equal distribution of roles and.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
Comprehensive Everglades Restoration Plan Web evergladesplan.org.
3rd Party Update To RMS November 20, 2013 Bob Frazier Senior Director of Electric Technology CenterPoint Energy (representing SMT JDOA)
Final Presentation Prepared by: Arezoo Gazerzadeh Syed Ahmed Floyd J. Srubar Damian Ottley Ramakrishna Gudikandhula.
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 1 Software Engineering November 7, 2001 Project.
Standards Review Subcommittee Update August 17, 2010.
WAEA Single Focus Workshop – Atlanta, February 17/18, 2000 A/C manufacturer initiative for Seat/IFE Integration Improvement Page 1 AIRCRAFT MANUFACTURER.
Project Initiation at The Regence Group 12/19/2015John Garrigues1.
February 21, 2000 Kimberly Pastega February th WAEA Workshop Seat/IFE Integration Team Members: Steve Normington.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
The Comprehensive Project Plan
Condor Technology Solutions, Inc. Grace Performance Chemicals HRIS Intranet Project.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
7 November 2006Program Management Basics Purdue FIRST Programs Slide 1 Program Management Basics Purdue FIRST Programs Chris Fultz Rolls-Royce Corporation.
Developing National Capacity for Integrated Border Management (IBM) in Lebanon Border Management Equipment.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
XML Interoperability & Convergence ISO XML Working Group (WG 10) XML on Wall Street November 20th, 2001 John Goeller.
Project Management PTM721S
Module 4: Structuring the District Implementation Team for Success
Supporting quality devices
Welcome ! Capstone Design Lab is a new 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
<workgroup name>
Project Management Managing Project Execution
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
Project Title, date “Team Name: Team members, …”
Working Group Attendance, Documentation, Reflector Update
Executives & Management
Rollout Guide Day 1 to 10 Day 11 to 20 Day 21 to 30 Day 31 to 40
1. Process Hazards Checklists
The Survival Plan.
Presentation transcript:

Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG §Allen StewartMAS §Mike QuaryWeber Aircraft §Curtis ByrdBAS §Kevin LuscheiBCAG §Sam MovsesianBAS §Tom AliffiDelta Air Lines

Communication and Design Process Group §Mission Statement §To define a Process and Vehicle that will identify roles, responsibilities,activities and information required from all participants to support the total program from pre-kickoff to aircraft delivery

Communication and Design Process Group §Responsibility Matrix §A brainstorming session produced the basic requirements of each party to prepare for and participate in an ITCM for seat integration §The draft material produced will be formatted and updated individually via

Communication and Design Process Group Airline §Supplier Selections (adhere to selection dates) §Supplier notification §Inter-Supplier communication §Equipment definition finalized §Contractual agreement between customers and suppliers §LOPA §System requirements

Communication and Design Process Group §Airframer and/or System Integrator §Adhere to supplier select dates §Seat and equipment Installation specifications §Integration and Installation schedule §ITCM Checklist §(Boeing Cabin systems Seat/IFE integration procedure IV) Coordination meeting expectations §Notification of schedule and long lead requirements

Communication and Design Process Group IFE Supplier §NDAs §List of IFE equipment and part numbers §Seat equipment installation specification and requirements §Seat Equipment Interface control documents §ITCM Checklist §Functional Test Procedure §Seat equipment wiring block diagram and installation template §Seat supplier requirements list request: §Data requirements and schedule §Coordination meeting expectations §Notification of schedule and long lead requirements

Communication and Design Process Group Seat Supplier §List of fit and test equipment requirements §Preliminary Seat envelope drawings with electrical component layout: l IFE components, Seat power, PC power, monitor arms, console stowage, telephones, reading lights, seat and accessory control buttons and switches. l List of electrical components including supplier names l Notification of schedule and long lead requirements

Communication and Design Process Group §Resource Material §Boeing Cabin Systems Payloads Integration Team Interim Agreement §This document will be edited to be a general reference guideline for cabin systems/IFE/seat integration and provided to waea.org/workinggroups web site in January.

Communication and Design Process Group §Future Plans §The completed matrix will be published on the waea.org/workinggroups web site. §The draft material produced will be formatted and updated individually via