Chapter 15 Resource Requirements Planning: MRP and CRP.

Slides:



Advertisements
Similar presentations
Inventory Systems for Dependent Demand
Advertisements

Material Requirements Planning
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
Principles of Operations Management
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
Materials Requirements Planning (MRP) Chapter 16 in Schroeder.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP, MRP II, and ERP.
Material Requirements Planning
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 14 Materials and Resource Requirements Planning McGraw-Hill/Irwin.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
Material Requirements Planning (MRP)
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Resource Requirements Planning:
Chapter 12a Resource Requirements Planning: MRP and CRP.
Material Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Hierarchy of Production Decisions
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
Material Requirements Planning (MRP)
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
SISTEM INFORMASI ENTERPRISE
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Facility Inventory Old Facilities Modern Facilities Classroom Size
Lecture 34 MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
BUAD306 MRP/ERP.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16 Materials Requirements Planning
Chapter 15 Planning for Material and Resource Requirements
MRP and ERP.
CHAPTER 14 MRP and ERP.
Material Requirement Planning (MRP)
MRP and ERP.
14 MRP and ERP.
Material Requirement Planning (MRP)
Resource Planning Chapter 16
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Chapter 15 Resource Requirements Planning: MRP and CRP

Overview of MRP Master Production Schedule Bills of Material File Inventory Transactions Data Exception Reports MRP System Inventory Status File Changes to Planned Orders Planned Order Schedule Performance Reports Planning Reports Primary Outputs Secondary Outputs MRP Inputs MRP Outputs MRP Computer Program

Inventory Status File 1 record for each part number Each record may contain the following information –part number –description –supplier(s) –# units on hand –safety stock –order quantity –lead time –# units already allocated (reserved, ear-marked) –open orders –# units –receive date –other information

Product Structure Tree A 2B 3C D 3E2D H 4G 2F 2E 3J A1 B C D E F G H J 1. How many of each part are needed to make one end item A? 2. If the warehouse has 2000 E’s, 800 F’s, 220 H’s, and 2500 J’s, then how many units of A can be produced? (A product structure tree is one way to display the information from a bill of material.)

At 8:00 in the morning an important customer places an order for as many units of item A as you can deliver by 5:00 that afternoon, and offers to pay a 30% premium for the item since this is a rush job. Subcomponents can be assembled very quickly if all of the lower level components are on hand. The lowest level materials are ordered from suppliers and it is not possible to place and receive an order from the suppliers on such short notice. So any units shipped must be produced with inventory you have on hand. The indented bill of materials for item A is shown below. Inventory records show the quantity in the warehouse for all relevant items. How many units of item A can be shipped by 5:00?

Indented Bill of Materials Inventory on Hand Level: 0123 ItemQuantity A A 45 B(2) B 150 D(3) C 20 E(5) D 700 F(3) E 200 G F 1200 C(4) G 100 F(2) H 1100 D(2) H(3)

A 2B4C 2F2D3H3D5EG 3F OH1st2nd3rd4th A45 B150 C20 D700 E200 F1200 G100 H1100 Iterations (1 st page) Total # of A’s:

A 2B4C 2F2D3H3D5EG 3F OH1st2nd3rd4th A4500 B C20 0 D E200 F1200 G100 H1100 Iterations (2 nd page) Total # of A’s:

A 2B4C 2F2D3H3D5EG 3F OH1st2nd3rd4th A45000 B C20 00 D E200 F G100 H Iterations (3 rd page) Total # of A’s:

The product structure tree for end item A is shown below. The following quantity of each item is available in inventory: A—20, B—40, C—0, D—30, E—180, F—120. Assembly of an item can be done quickly if all necessary materials are available. If there is no time to order any additional materials, what is the maximum number of end item A’s that can be produced and shipped from materials on hand? A 4B3C D2E3E 2F Answer: 35 A’s

Order Quantity Restrictions (lot size rules) LFL – lot-for-lot Q – specified order quantity (multiples) 400+ – minimum order quantity

Gross Req. 10,0007,500 LT=2Scheduled Rec OH=5000Available SS=2500Net Req. Alloc=2000Pl. Or. Receipt Pl. Or. Release MRP Table

Evolution of MRP MRP – Material Requirements Planning MRP II – Manufacturing Resource Planning ERP – Enterprise Resource Planning ????