United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 11 Navigation Post-Processing for Ellipsoid-Referenced.

Slides:



Advertisements
Similar presentations
Scheduled for HYPACK 2011 Release
Advertisements

Tutorial 3 Refractor assignment, Analysis, Modeling and Statics
th Avenue, Suite 200 Honolulu, HI (808) Software Services Systems Oceanic Imaging Consultants, Inc. Professional.
Best Practices for Real-Time GNSS Network Administration Webinar July 31, pm ET RTK/RTN Precision vs. Accuracy & Occupation Time Mark L. Armstrong,
Procedure for GPS Height Transformation within a Small Local Area
T GPS Fundamentals Your location is: 37 o ’ N 122 o ’ W.
RTK Developments from NavCom Technology Inc. RTK GPS for Hydrographic Surveys and Seamless Vertical Datums Workshop NASA John C. Stennis Space Center 27.
A comparison of error budgets for vertical positioning using traditional and RTK GPS approaches USM GPS workshop March 16-18, 2004 R.M. Hare, P.Eng., C.L.S.
C-Nav GPS System & the Seamless Vertical Datum
GG450 April 22, 2008 Seismic Processing.
Application of Post-Processed Navigation, Motion and Tide Data to Multibeam Surveys using Applanix POS/MV Dushan Arumugam Doug Lockhart Carol Lockhart.
What is GPS?. The Global Positioning System The Global Positioning System (GPS) is a system of satellites maintained by the US Department of Defense for.
Geographic Datums Y X Z The National Imagery and Mapping Agency (NIMA) and the Defense Mapping School Reviewed by:____________ Date:_________ Objective:
Where we are going today… GPS GPS GIS GIS Hey, there are exams next week. Oct. 4 th and 6 th. Powerpoints now online. Hey, there.
GTECH 201 Session 08 GPS.
Lawrence H. Haselmaier, Jr. Computer Scientist Naval Oceanographic Office 7 August 2014.
HYPACK® Multibeam Training Seminar
Principles of Sea Level Measurement Long-term tide gauge records  What is a tide station?  How is sea level measured relative to the land?  What types.
SCC & Leica  Import total station survey, GPS, traverse, levelling and GIS data direct from all Leica instruments.  In built Grid Inquest for GPS reduction.
GPS for NOAA Hydrographic Surveying CDR Gerd F. Glang & Jack L. Riley National Ocean Service, NOAA NOAA GNSS Workshop 2007.
Session III GPS DEPTH-FINDER UNITS. F GPS positions are not error free –User and/or Satellite clock bias. –Satellite signal can be blocked. –Atmospheric.
13/06/13 H. Rho Slide 1 Geodetic Research Laboratory Department of Geodesy and Geomatics Engineering University of New Brunswick Evaluation of Precise.
Relating Data to a Seamless Vertical Reference Surface
Introduction In 2007 the Swedish Maritime Administration performed an investigation of a merchant vessel dynamic movements in Lake Mälaren, Sweden. The.
VDATUM: the Vertical Datum Transformation Tool
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 11 Regression.
Permanent GPS Stations and their Influence on the Geodetic Surveys in Israel Gershon Steinberg Survey of Israel 1 Lincoln St. Tel-Aviv 65220, Israel Gilad.
Mission Planning and SP1. Outline of Session n Standards n Errors n Planning n Network Design n Adjustment.
Modern Navigation Thomas Herring MW 10:30-12:00 Room
© 2012 MISTRAS GROUP, INC. ALL RIGHTS RESERVED. DISSEMINATION, UNAUTHORIZED USE AND/OR DUPLICATION NOT PERMITTED. TankReporter 2.0 A Step by Step Example.
Transition of the ORGN from NAD 83(CORS96) epoch to NAD 83(2011) epoch Ken Bays, PLS Lead Geodetic Surveyor Oregon DOT March 2013 ODOT.
Performance Testing What can you achieve with your MB System?
Expanding Our Global Opportunities Techniques for Mapping In-River Geomorphology, Sediment Transport and River Bank Structures Robert Feldpausch,
C-Nav GPS System GPS Services Group
Hydrographic Survey Software for Windows.  Eye4Software B.V., based in the Netherlands was founded in  More then 15 years of experience in Hydrography.
Karen Herter (HMG) Mike Langley (DGS) April 15, 2008 Portfolio Manager for California State Buildings Meeting the Requirements of Executive Order S
Hydrographic Survey Software for Windows.  Eye4Software B.V., based in the Netherlands was founded in  More then 15 years of experience in Hydrography.
USM GPS RESEARCH ACTIVITIES Presented by: Technical support from: Funding provided by:
Tide corrections from KGPS and a precise geoid John Brozena, Randy Herr, Vicki Childers.
30 July 2004USM 2004 Upper Pearl Survey1 Vertical Uncertainty Total Propagated Error –Error budget using Excel spreadsheets created for NAVOCEANO by Rob.
1 POS MV Vertical Positioning March Where we fit in! “Other sensors (notably modern heave-pitch-roll sensors) can contribute to achieving such.
Naval Oceanographic Office Charting Products Division (N43) Naval Oceanographic Office Hydrography Department upgrades to its Positioning Systems and Hopes.
Ostende GLOSS course 2006 Suggested Method for Datum Determination for the Radar Gauges provided for ODINAFRICA and GLOSS-Africa P.L.Woodworth.
GPS Workshop 2004 RTK-GPS Activity at the University of New Hampshire.
Tidal Constituent and Residual Interpolation Survey Planning and Weighting Function Computation.
U.S. HYDRO 2007 TIDES WORKSHOP May 17, 2006 UNCERTAINTY WORKSHOP SKGILL SLIDES.
University of Southern Mississippi Canadian Hydrographic Service
GPS Services Group C&C Technologies, Inc., C-Nav GcGPS System Background and Accuracy.
TESTING OF KGPS FOR TIDE APPLICATION TO HYDROGRAPHIC SURVEYS BY THE NAVAL OCEANOGRAPHIC OFFICE.
Session III GPS DEPTH-FINDER UNITS. F GPS positions are not error free –User and/or Satellite clock bias. –Satellite signal can be blocked. –Atmospheric.
Tide corrections from KGPS and a precise geoid
Hydrographic Survey Software for Windows
WATER LEVEL OPTIONS. Water Level Corrections Water Level Above Chart Datum = Negative Tide Correction! In Depth Mode:  Chart Sounding =  Measured Sounding.
ST236 Site Calibrations with Trimble GNSS
SINGLE BEAM EDITING HYPACK
TCARI Goes Operational: Improvements for Field Use and the Development of an Error Model Barry Gallagher LCDR Rick Brennan Monica Cisternelli Stephen Gill.
Processing Single Beam Data
ENC EDITOR.
RTK TIDES.
GPS Site Calibration Objectives  Explain the Co-ordinate systems used in GPS Surveying.  Explain what a calibration is.  Explain the 5 main process.
Patch Testing. HYSWEEP ® Calibration of a Multibeam System Patch Testing Single and Dual Head Multibeam Systems. Patch Testing Single and Dual Head Multibeam.
Nic Donnelly – Geodetic Data Analyst 5 March 2008 Vertical Datum Issues in New Zealand.
1 July 20, 2000 Geosat Follow-On An examination from an operational point of view Impact on operational products Overall system performance (from sensor.
Position 1 CPF09 v1.4 Copyright © BSAC 2010 Chartwork and Position Fixing Position Fixing Methods.
Datums and Tides Mean Low Tide versus Mean Lower Low Water And the winner is……….!
The Global Positioning System Rebecca C. Smyth April 17 - May 2, 2001.
WATER LEVEL OPTIONS. Water Level Corrections Water Level Corrections Water Level Above Chart Datum = Negative Tide Correction! In Depth Mode:  Chart.
Capability For Hydrographic Capacity Building: Industry Partnering
Fleet Survey Team, NAVOCEANO
Presentation transcript:

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 11 Navigation Post-Processing for Ellipsoid-Referenced Surveys Susan Sebastian Naval Oceanographic Office Navigation Department 28 April 2011 The inclusion of names of any specific commercial product, commodity or service in this presentation does not imply endorsement by the U. S. Navy or NAVOCEANO.

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 2 What is ERS? Alternative to conventional water level corrections (tide+draft+squat+etc…) Alternative to conventional water level corrections (tide+draft+squat+etc…) Vertical component of GPS (height from ellipsoid) for water level all inclusive of correctors. Vertical component of GPS (height from ellipsoid) for water level all inclusive of correctors. Upgraded navigation equipment and software allows use of GPS heights from ellipsoid for water level corrections. Upgraded navigation equipment and software allows use of GPS heights from ellipsoid for water level corrections. Termed Ellipsoidal Referenced Survey (ERS). Termed Ellipsoidal Referenced Survey (ERS). Why ERS? 1)Reduces the dependency on shore-based tide gauges. 2)Reduces dependency on difficult to measure parameters, such as dynamic draft, settlement, squat. 3)Provides a more seamless vertical datum than conventional tidal zoning.

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 3 ERS Components 1)GPS measurement of the vertical height of the survey vessel relative to the Ellipsoid 2)Two levels of GPS accuracy: a)NavCom RTG data available real-time; meets Order 1 minimally b)PPP (precise point positioning) can be generated after 24 hours through post-processing; will be required once process is in place. Requires re-merge of nav data prior to applying GPS water level correctors. 3)SEP (or separation) – distance from the Ellipsoid to chart datum 4)Water Level Correction – SEP minus GPS

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 4 h: Antenna height above ellipsoid RS: Raw sounding corrected for heave, re: master reference point (MRP) Za: Antenna Z offset on boat Zt: Transducer Z offset on boat T: Tide SEP: Chart datum to Ellipsoid separation CS: Corrected sounding, re: chart datum D: Draft (static, loading, and S&S) ERS Corrected Sounding Calculation From: RTK Tide Basics – Hydro International, December 2003, Pat Sanders Conventional Water Level Reduction: CS = RS + D – T ERS Water Level Reduction: CS = RS + SEP – h + Za Reference Ellipsoid Bottom Chart Datu m RS MRP D ZaZa Water Surface Heave Datum heav e CS ZtZt T h SE P

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 5 Data Types Needed for ERS 1) Raw GPS observables from a dual-frequency GPS receiver a) NAVCOM raw GPS 10Hz (primary GPS data source) b) POSMV raw GPS Hz (backup GPS data source) AND c) Heave at 100Hz 2) GPS buoy and/or GPS observations at tidal benchmark

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 6 GPS Observations at Tidal Benchmark SEP = X+Y+Z X obtained from 24-hour GPS observation over BM X obtained from 24-hour GPS observation over BM Y obtained by level line Y obtained by level line Z obtained from 30 days of tide data Z obtained from 30 days of tide data Provides SEP: Ellipsoid to Chart Datum Separation Ellipsoid Geodetic BM Tide Gauge Chart Datum Elev. BM to Gauge Ell. HT SEP Y Z X

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 7 Data Collection Recommendations 1) Verify the NAVCOM output settings using a laptop and the Starfire utility program at the beginning and end of the survey. 2) Verify the POSMV output settings (frequency and telegram groups) at the beginning, middle, and end of the survey, using the POSMV controller program.

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 8 Comparing GSP Tide vs. Tides To compare GPS WL correctors to conventional tide correctors, subtract WLZ from the GPS tide Example: |GPS Tide Corr.| - WLZ = |Tide Corr.| |-1.05| = |-0.23|, ~ |-0.22|

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited PR Tides vs. GPSz Correctors A B A B Residual Diff. Bathy X-section, GPSz corrected

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 10 Tide vs. GPSz Excellent vertical alignment desired for area- based editing. Predicted Tide Corrected GPSz Corrected

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 11 Tide vs. GPSz Excellent vertical alignment desired for area- based editing.

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 12 Area-Based Editing Tide vs. GPSz Predicted Tides GPSz, Smoother surface for automated processing.

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 13 DATA PROCESSING FOR ERS 1) Apply delayed heave 2) Apply GPS water level corrections 3) Review GPS water level correctors and ellipsoid heights in GSF file 4) Process and merge nav as needed Note: Nomenclature for GPS water level corrections varies in the applications and documentation. GPS water level corrections = GPS tides = GPSz

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 14 Navigation Processing Field processing navigation: Simple if no problems, complexity increases as degradations move upstream. Final dataset, apply all final PPP. Simple: RTG solution good Complex; need PPP

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 15 Apply GPS Tide correctors w/EGM2008 gravitational model Need 2 files: 1. EGM minute grid AND 2. Uncertainty for that surface RTTIDE DTC EGM Model and uncertainty

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 16 Inspect GPS Tides and Ellipsoid Heights with Profile Viewer

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 17 Use View Settings Menu to Configure Display GSF POSMV NAVCOM Example: GSF E-HT bad, POSMV and NAVCOM OK Note Ant. Height offset

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 18 Exammb Using the Cursor Information Menu on TSView, the time is shown to be around 08:18. This proves to be true as can be seen in the image below of exammb, showing that at 08:18:05, the ellipsoid heights jump from 28.68m to 3.49m.

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 19 Processing Strategy Note: GPS Tides must always be re- applied after correcting the ellipsoid heights Increasing Complexity A B C D E

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 20 Profile Interpretation A: GPS tides and ellipsoid heights in GSF file are good. No action needed. B: GPS tide data is corrupted, and ellipsoid heights in GSF file are good. After re-applying GPS Tides, the ellipsoid heights were corrected. Example A: All good.

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 21 Example B: UNCORRECTED Example B: CORRECTED by re-applying GPS Tides

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 22 Profile Interpretation C: GPS tide data AND ellipsoid heights in GSF file corrupted To correct this if POSMV ellipsoid heights OK, merge this data with the GSF file in SABER.

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 23 Profile Interpretation D: GPS tide data AND ellipsoid heights in GSF file AND POSMV ellipsoid heights corrupted To correct this if NAVCOM ellipsoid heights OK, merge this data with the GSF file in SABER. Remember NAVCOM needs the vessel file. GSF POSMV

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 24 Profile Interpretation E: GPS tide data AND ellipsoid heights in GSF file AND POSMV ellipsoid heights AND NAVCOM ellipsoid heights corrupted To correct this, post-process NAVCOM with GraphNav and merge PPP with the GSF file in SABER. Remember NAVCOM needs the vessel file. NAVCOM Data

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 25 Profile Interpretation Example E corrected by merge with PPP

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 26 MERGE NAV INTO MULTIBEAM NOTE: –POSMV is lever-arm corrected; no vessel file needed –NAVCOM is uncorrected; need a vessel file

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 27 MERGENAV Process->Navigation->Merge Navigation. Select the GSF file or a list of files. Select the corresponding POSMV, NAVCOM, or PPP. NAVCOM data: select the vessel file. POSMV data: do not apply vessel offsets.

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 28 Navigation Processing Log Fill out the Navigation Processing Log, a worksheet of the GSF Processing Log, Version 3.1. Use the orange section: RTG Blue Section: PPP

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 29 Navigation Processing Log Worksheet of the GSF Processing Log, Version 3.1

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 30 IHO Order 1 allowable vertical error from the tide component is 30cm or better at 2 SD IHO Order 1 allowable vertical error from the tide component is 30cm or better at 2 SD Data analysis to date has demonstrated that GPS PPP solution heights and a well defined SEP value give accuracies of cm or better Data analysis to date has demonstrated that GPS PPP solution heights and a well defined SEP value give accuracies of cm or better GPS RTG solution heights accuracies with a well defined SEP are generally 30-35cm accuracy; RTG solution heights are an acceptable field solution until automated procedures for field processing of PPP data can be developed GPS RTG solution heights accuracies with a well defined SEP are generally 30-35cm accuracy; RTG solution heights are an acceptable field solution until automated procedures for field processing of PPP data can be developed A well defined SEP requires the use of a GPS buoy or GPS observations over a tidal benchmark A well defined SEP requires the use of a GPS buoy or GPS observations over a tidal benchmark Accuracy Requirements

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 31 More on SEP Methods to define SEP: 1) GPS observations over a tidal benchmark 2) GPS Buoy 3) EGM 2008 Model – 1min x 1min model of geoid height relative to the WGS84 Ellipsoid; use of EGM 2008 will not meet IHO Order 1 accuracy requirements in shallow water Survey areas with large geoid undulations with respect to the Ellipsoid will require multiple SEP measurements and might require conventional tide data if IHO Order 1 is required

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 32 Example Area of Large Geoid Undulations Change in geoid-ellipse height of 2m across test area ERS data accuracy (using EGM 2008) was 50 cm as compared to tide corrected data

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 33 RTG v.s. PPP Uncertainty

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 34 Precise Point Positioning SOP Resource intensive; SOP executed in-house. More resources needed to accomplish in the field.

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 35 Nagging Offset in 2 Receivers “intuition suggests that there is a systematic offset that we should be able to correct, we need to keep the keep in mind that the observed difference between the two height solutions is well within the expected overall uncertainty value” Shannon Byrne, SAIC

United States Fleet Forces Ready Fleet … Global Reach Approved for public release; distribution is unlimited 36 Summary Each ship SURVOP is collecting data needed for ERS, even if we’re not completely there yet. For ERS water level corrections, Navigation data must be inspected and sometimes processed. The issue in the field is to get the best vertical alignment for area-based editing purposes, which is GPS Tides in most cases. GPS Tides does increase the vertical alignment of the data so for building PFMs, it is advantageous, regardless of depth. Need dedicated Nav Lead to accomplish PPP in field and the last few days will always be done in-house.