Requirements for the Interlock System of the Phase1 beam line Janet Schmidt on behalf of CP3.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

PAC June LHC Machine Protection Rüdiger Schmidt R.Assmann, E.Carlier, B.Dehning, R.Denz, B.Goddard, E.B.Holzer, V.Kain, B.Puccio, B.Todd, J.Uythoven,
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
Injection test? Mike Lamont For initial discussion.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Laser news AWAKE performance meeting Overview There was a meeting on with the supplier of the laser system (AMPLITUDE) No new information.
Budget Summary Linac-4 Instrumentation review CERN, Uli Raich BE/BI.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Laser Beam Transport and Integration. AWAKE Collaboration meeting. Mikhail Martyanov Christoph Hessler CERN, EN-STI-LP Valentin Fedosseev CERN
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
1 LHC vacuum Rossano Giachino Acknowledgments Jimenez,V.Baglin,J.C.Billy,I.Laugier Rossano Giachino November 2007.
The LHC injection systems located in points 2 and 8 are comprised of several elements common to the LHC ring and the downstream ends of the TI 2 and TI.
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Laser Status Update J. Moody, E. Oz, P. Muggli MPP Future Accelerators AWAKE Collaboration
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
V. Kain AB/OP1Sep 12, 2007 Summary of Discussion on Injection Protection Issues Injection Protection Issues – meeting 22 nd of June V. Kain, A. McPherson,
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
“Performance of BTVs during the CNGS commissioning” E. Bravin AB/BI NBI th International workshop on Neutrino Beams and Instrumentation 4-9 September.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
Update on the Laser Beam Line
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
LHC OP Tools - Applications (1) o2 new timing users, new dynamic destination oPower converters – settings (for base optics):  Parameters, optics, beam.
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Current NML Layout.  Overall length of building is 72M 3 cryomodules with feed and end cans ~40M Not enough room for both photoinjector and downstream.
AWAKE Technical Board, 19 August E. Gschwendtner, CERN.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Summary of the AWAKE Technical Board Meetings Edda Gschwendtner.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
CERN Marc Magrans de Abril MPP – RBI DCCT Incident Beam Lost in TI2 Event Analysis and Proposed Mitigations SPS and LHC MPP
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Status of AWAKE Laser Line Installtion For the EN-STI Management Board - 30 May 2016 Presented by Valentin Fedosseev.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
Primary Beam Lines for the Project at CERN
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
AWAKE proposals for BE/BI
2011/ 07/06 Jacqueline Yan IPBSM
Spectrometer Layout (Isometric View)
XFEL Vacuum System Commissioning
AWAKE status and readiness for phase #2
CNGS Proton Beam: Introduction
Machine Protection System Commissioning plans
PS-Booster Measurements for the LHC -BLM October 2002
Thursday 10:00 Fill 1986 in stable beams.
Presentation transcript:

Requirements for the Interlock System of the Phase1 beam line Janet Schmidt on behalf of CP3

2 Functional scheme of main laser lines 2 LSSP1, LSSP2, LSSE1, LSSE2 – Laser Safety Shutters for proton and electron beam lines LBDP1, LBDP2, LBDP3 – Laser Beam Dumps for proton beam line MP1- MP5 – Mirrors for proton beam lines (IN VACUUM) ME1- ME4 – Mirrors for electron beam line VP1 – VP5, VE1 – Vacuum vessels for proton and electron lines Photoinjector LSSE2 VE1 LSSE1 ME1ME2 ME3 ME4 THG Delay line CERN Naming of shutters and dumps LSSP1 = TOSWB – in air LSSP2 = TOSWA in vac LSSE1 = TOSWB – in air LSSE2 = TOSWB – in air LBDP1 = TODWA in vac LBDP2 = TODWB in vac LBDP3 = TODWC in vac

BTVs F LSSP2 LBDP1 LBDP2 B2 B1 B4 B3 F = Movable Filter with end switch Laser dumps LBDP3 Layout of Beam Lines

TRUTH Table For LASER LASER TO LINELSSP2OUT V LOW POWER (default)FIN DiagnosticsLBDP1INOUTINOUT LBDP2OUT IN B1IN/OUT B2IN/OUT B3IN/OUT B4IN/OUT FULL POWER (by request)FOUT DiagnosticsLBDP1INOUTINOUT LBDP2OUT IN B1IN/OUTOUTIN/OUTOUT B2IN/OUTOUTIN/OUT B3IN/OUTOUTIN/OUT B4IN/OUTOUTIN/OUT TypeName F Filter / Indicator for Laser Power (tbd) To be defined LSSP2Laser ShutterTOSWA LBDP1Laser Dump upstream plasmaTODWA LBDP2Laser Dump downstream plasmaTODWB LBDP3Laser Dump downstream plasmaTODWC VValves (CERN + MPP) VVGS , VVGS , VVGS , 6x MPP B12 Screens upstream plasmaBTV , BTV B21 Screen downstream plasmaBTV B3Diagnostic MPP B41 Screen (SMI diagnostic CERN)BTV Local System B2 LBDP2 B4 Plasma LBDP1 LSSP2 LBDP3

Commissioning and Operational Modes For LASER ModeLaser PowerLaser ShutterLaser DumpScreens Set up only laserLow/HighLSSP2 IN LBDP1, LBDP2, LBDP3 IN/OUTB1, B2, B3, B4IN/OUT Set up laser beam in TT41 LowLSSP2 OUT LBDP1, LBDP2 LBDP3 IN/OUT IN B1, B2, B3, B4 IN/OUT HighLSSP2 OUT LBDP1 LBDP2,LBDP3 IN IN/OUT B1, B2, B3, B4IN/OUT Set up protons and laser LowLSSP2 OUT LBDP1 LBDP2 LBDP3 OUT IN/OUT IN B1, B2 B3, B4 IN IN/OUT Operation Phase 1HighLSSP2 OUT LBDP1 LBDP2 LBDP3 OUT IN OUT B1, B2 B3, B4 OUT IN/OUT IN Operation Phase 2HighLSSP2 OUT LBDP1 LBDP2 LBDP3 OUT IN B1, B2 B3, B4 Electron spectrometer OUT IN Local System B2 LBDP2 B4 Plasma LBDP1 LSSP2 LBDP3

TRUTH Table For Protons Permit this SPS extraction statusname Valves (8)outCERN: VVGS , VVGS outMPP valves/plunger: 6 Laser dump LBDP1 (1)outTOSWA SPS BIC Permit next SPS extraction statusname BPMs around laser mergingOKBPM , BPM BPMs before plasma cellOKBPM , BPM BLM at laser mergingOKBLM BLM around plasma cellOKBLM , BLM x valve

Summary The laser interlock system should be a local system, checking the status of screens and valves according to the laser power and shutter status. The required interlocks for the proton line are defined, including BMPs, BLMs and valves. For the electron transfer line, only the valve needs to be interlocked. Requirements of the source will be defined on a later stage.