PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IHDR 12/13 Nov 2003 PACS Instrument Overview1 Instrument Design/Development Overview and System Performance PACS Instrument Overview A.Poglitsch MPE.
HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
PACS SVR22/23 June 2006 PACS Thermal Behaviour1 PACS Thermal Behaviour Tests T. Müller, H. Feuchtgruber, A. Contursi, Cs. Kiss, Sz. Csizmadia.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
PACS SVR22/23 June 2006 FM IST1 PACS FM Tests at Integrated Satellite Level H. Feuchtgruber with inputs from the PACS Operations Team: D. Cesarsky, H.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IQR 13 Jan 2005 PACS OBSW1/33 PACS On-board Software & User Manual A. Belbachir (UVIE/TUVIE, SPU) H. Feuchtgruber (MPE, SE) A. Mazy (CSL, DMC) S.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR ESTEC, 13 Jan 2005 Documentation1 G. Wildgruber MPE Garching Introduction to Documentation - CQM/AVM EIDP and IQR-
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
Groningen, 1-2 February 2001 FPU Preliminary Design Review1 First Stage Cryogenic IF Amplifier Centro Astronómico de Yebes Observatorio Astronómico Nacional.
PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS SVR38/9 Nov 2007 System Testing1 Tests on Satellite Level H. Feuchtgruber.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
CME ZTE – SMARTFREN Phase 2.1 Identification Blocking Issue, Solution & Plan October 17, 2014 Prepared by : Despriman Saragih.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Double Star: Experiment Activities
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
First Stage Cryogenic IF Amplifier
Presentation transcript:

PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR

13 Jan 2005 Warm Electronics Qualification Status2 Warm Electronics Overview

PACS IQR13 Jan 2005 Warm Electronics Qualification Status3 Built Standard of WE Items I

PACS IQR13 Jan 2005 Warm Electronics Qualification Status4 Built Standard of WE Items II PACS AVM WE integrated on SVM Panel Simulator at Astrium (QM1 BOLC ext. PSU not shown) Status:

PACS IQR13 Jan 2005 Warm Electronics Qualification Status5 Thermal Qualification Status AVM / STM WE Unit testing - STM BOLC: TV test for design validation : OK - BOLC PSU sub-unit thermally tested : OK - As agreed, no tests were done with other units CQM / AVM ILT - No tests were foreseen and done QM / PFM WE Units - Simulations and Analysis done for all units - Full qualification programs are currently ongoing - First results for QM SPU available

PACS IQR13 Jan 2005 Warm Electronics Qualification Status6 Electrical Interface Qualification Status : AVM AVM WE Unit testing by sub-contractor - No qualification tests foreseen on sub-contractor level for delivered units - no VCD available as no test foreseen AVM WE Unit testing by MPE - Inrush current measurements for DPU, SPU : compliant - Spectrometer Groundings tested during ILT - ICC data analysis still missing for final decisions

PACS IQR13 Jan 2005 Warm Electronics Qualification Status7 Electrical Interface Qualification Status : QM / PFM QM WE Units testing - Full applicable testing on sub-unit level contractually agreed - First results for QM SPU available : NCRs for Bonding R and PROM contents - Nothing available yet for other units - Qualification Test Programs are ongoing - NA for WIH PFM WE Units testing - Full applicable testing on sub-unit level contractually agreed - All testing necessary and required prior to delivery to MPE - PFM WE Units should not be accepted without completed Test Reports

PACS IQR13 Jan 2005 Warm Electronics Qualification Status8 Electrical Interface Qualification Status : Power Power Budget Is DECMEC Power Consumption final? Possible changes due to Heater / Flasher Implementation. Slight Increase of SPU Power. CR released

PACS IQR13 Jan 2005 Warm Electronics Qualification Status9 EMC / ESD Qualification Status : AVM AVM WE Unit testing - No tests conducted on sub-contractor level for delivered units of DPU, SPU, DECMEC and BOLC, NA for WIH CQM / AVM ILT - Full applicable test program done, given in EMC test specification PACS- ME-PL-015, Issue As run Test procedure PACS-ME-PL-015, Issue 1.2 available via CR-0020v2 - EMC Draft Test Report available, ICC Data analysis still missing - Some NCRs, RfW raised or re-issued - ESD testing not done (high risk) - Test and Compliance Matrix : see next transparency (extract of available Draft Test Report, PACS-ME-TR-038, chapter 3)

PACS IQR13 Jan 2005 Warm Electronics Qualification Status10 EMC / ESD Qualification Status : AVM Matrix

PACS IQR13 Jan 2005 Warm Electronics Qualification Status11 EMC / ESD Qualification Status : EQM /QM EQM IST Testing - Only RS tests foreseen, acc. HP-2-ASED-PL ESD testing omission still under discussion and not agreed QM WE Units testing - ALL QM models are NOT deliverable items - Full applicable testing on sub-unit level contractually agreed and expected - First results for QM SPU available, NCRs for RE-E - Nothing available yet for other units - NA for WIH

PACS IQR13 Jan 2005 Warm Electronics Qualification Status12 EMC / ESD Qualification Status : PFM PFM WE Units testing - Full applicable testing on sub-unit level contractually agreed and expected PFM ILT EMC testing - full applicable testing acc. IID-A, as reflected in PACS-ME-PL-015 with exceptions for ESD and RE/RS-E/H-Field testing PFM IST EMC testing - Only CE tests foreseen, acc. HP-2-ASED-PL-0037

PACS IQR13 Jan 2005 Warm Electronics Qualification Status13 Electrical Design Status : Plans for FM DPU AVM to DPU CFM / PFM -Changed PL I/F Board, new design BOLC QM1 to BOLC QM2 / PFM - Changed Bandwidth (and other) of Read-out electronics - Several Changes in digital electronics - New PCB designs DECMEC AVM to DECMEC QM / PFM - Several changes during and after ILT necessary to provide functionality and performance SPU AVM to SPU QM / PFM - no changes (as far as reported)

PACS IQR13 Jan 2005 Warm Electronics Qualification Status14 Critical Qualification Items I WIMA MKS-2 capacitors (not part of WE, are in FPU) : not yet qualified for cryogenic use Distribution Board „Evaluation“(not part of WE, FPU) : visit at Board manufacturer „Waltron“ still pending Cryo Harness Verification and Compliance Matrix missing Agreement on full PFM WE Unit Qualification prior to delivery to MPE Risk that DECMEC functionality and performance could shorten the Qualification programme. Additionally the Heater / Flasher Electronics for Photoconductor curing has to be implemented in DECMEC. Solution for DPU 1553 Burst Mode Problem pending

PACS IQR13 Jan 2005 Warm Electronics Qualification Status15 Critical Qualification Items II Spectrometer Grounding Decision after Data Analysis : Warm-end or Cold-end-Grounding Agreement on ESD Testing at the end of EQM IST open RS-H of Photometer / Bolometer very high BOLC QM1 with external PS not EMC ILT tested BOLC uncontrolled switch-off could damage the bolometers (NCR existing)