Global Design Effort 会議報告 Cost Management Group Meeting at DESY 2008.05.05 – 08 設楽 哲夫 LC GDE 報告会 2008.05.12

Slides:



Advertisements
Similar presentations
Nick Walker – GDE meeting Frascati Discussion and Approval of the BCD Nick Walker ILC-GDE Frascati –
Advertisements

Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Development plan and quality plan for your Project
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Report from ILC GlobalGroup 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara · GDE December 8, 2005.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,
John Carwardine 1 TDR Editorial WG Summary Global Design Effort John Carwardine.
CLIC-ILC Cost & Schedule Agenda – 8feb08 John Carwardine = secretary & rapporteur this file: & Schedule Sub-Group.
Sendai, March 3, 2008 TILC08 · GDE Meeting Global Design Effort 1 TILC08 · GDE Meeting on International Linear Collider · Tohoku University Sendai · Japan.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
A. Yamamoto, N. Walker, and M. Ross, ILC-GDE Project Managers S. Stapnes, CERN LC Studies Leader LCWS12 - Opening Accelerator Plenary, , 18:00.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
EUROTeV and the ILC Global Context Nick Walker (DESY) EUROTeV Annual Meeting INFN Frascati 24 January 2008.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
AAP Review 横谷 LC 定例 Preparation of AAP Review General charge sets the frame Version of early November Rough structure of the meeting has been.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
1 ILC Internal Cost Review Major Points from External Reviewers T. Elioff, J. Marx, V. Soergel, M. Yoshioka, and A. Yamamoto, (C. Wyss, absent) To be presented.
M. Ross for PM - ILC Global Design Effort 1 Dubna GDE Workshop ОИЯИ, Дубна, Marc Ross, Akira Yamamoto, Nick Walker GDE Project.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
EM Report1 Report from Engineering Management Group to GDE EC 2007/12/12 Report by N.Toge.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group1 CLIC-ILC Collaboration - #2 Cost and Schedule working group John Carwardine, Katy Foraz,
Nick Walker for the Project Management ILC AD&I: Introduction and Overview.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Project Management: Nick Walker Akira Yamamoto Marc Ross ILC AD&I: Introduction and Overview 02/12/2009.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 Global Design Effort John Carwardine: [date] Cost Estimate data management John Carwardine Feb 8, 2008.
November 05, 2008CFS-GBL meeting 1 PM report Nov 5, 2008: 0) ILC08 plenaries 1) Summary of Pac review 2) Report on ttc and barc (india) 3) Summary of positron.
GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel
Global Design Effort WG-1: Cost Reduction Studies Nick Walker John Carwardine Tetsuo Shidara.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
John Carwardine, Ewan Paterson, Marc Ross 14/15 July 2009 Availability Task Force: Subgroup #2.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Global Design Effort Accelerator Systems EDR Kick-Off Meetings Preparation Nick Walker.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Global Design Effort RTML KOM Close-out Ross, Walker.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Minimum Machine Update Nick Walker Ewan Paterson AS TAG leaders meeting
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Oct 22 Group Leaders Planning meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
EDR Planning, Cost Review and Technical Risk Analysis
Technical Design Report preparation
Presentation transcript:

Global Design Effort 会議報告 Cost Management Group Meeting at DESY – 08 設楽 哲夫 LC GDE 報告会 Password Protected

Global Design Effort Challenges & Issues RDR – 1年を経過 – 過去の遺産か? – 日に日に忘れられて行く – 緊急課題 : VALUE estimate と RDR design document との traceability 2012 までのプログラムの遅れ –Accelerator physics design の役割は? RDR は今でも十分か ? –Limited resources: DR, BDS, sources significantly reduced But management still in place and on-board How best to use this group? Keep motivation?

Global Design Effort Challenges & Issues In a predominantly R&D phase, who is worrying about the collider design? –Despite above comments, AP&D is still critical during TD Phase I Cost Containment / Reduction –Need to demonstrate clear effort to re-evaluate the design and reduce the cost –“Minimal” GeV Collider Concept Strategic planning –Updated (new!) value estimate will be critically reviewed Internally in 2010 Publically in 2012

Global Design Effort Cost Management Group Small focus group to “manage the costs” Take top-level ownership Forward planning to critical cost review –Philosophy / Structure / implementation –Update review 2010 (internal) –New value estimate 2012 (external) Push-back on the design (cost awareness)

Global Design Effort Cost Management Group “Task Force-like” (prefer think-tank) Goals –Re-structure and consolidate existing cost information for “better access” New tool –Examine the cost data for inconsistencies, discrepancies, questionable entries, missing information –Re-establish traceability with RDR design requirements (together TAG leaders) Or identify missing information that needs to be supplied –Prepare for cost-reduction design scenarios Coordination with TAG leaders / technical groups essentially –Primarily via PM, APM, PMO

Global Design Effort Cost Management Group メンバー PMs: M. Ross, N. Walker, A. Yamamoto Cost Engineers: W. Bialowons, P. Garbincius, T. Shidara APMs: J. Carwardine, F. Lehner PMO: E. Elsen, E. Paterson Others: T. Himel, +++

Global Design Effort Defining our (CMG) Goals review: start here

Global Design Effort Elements: VALIDITY What documentation will we require for a critical cost review? How do we intend to present it?

Global Design Effort Elements: TRACEABILITY Critical link between design and cost- estimate documentation Understanding the formal link between the two: Maintaining integrity Role of change control (  Toge) Initial configuration (consolidating RDR)

Global Design Effort Elements: COMPLETENESS Definition of (i.e. level of detail) must be defined up-front Use RDR value estimate as a guideline (e.g. 1% level) Build ‘ideal’ CBS structure (based on above) Understand how current information maps to ideal structure Where is information missing What to do with too-detailed information

Global Design Effort Elements: RISK Maintaining a risk register Understanding (quantifying) value uncertainty Formally integrating methodology into scheme (tools)

Global Design Effort Cost Reduction “First step to containing / reducing cost is to keep good track of the existing ones” – anon.

Global Design Effort CMG responsibilities Define new documentation organisation for TD phase –ILC-EDMS design documentation Part Breakdown Structure = PBS –VALUE estimate (tool?) Cost Breakdown Structure = CBS Consolidate RDR data –Existing data into newly defined structures –Identify missing components Catalogue and prioritise Begin (continue) drill-down RDR data –Design modification catalogue Define minimum GeV machine? –Can coordinate but TAG leaders must clearly be involved

Global Design Effort Goals for this meeting Attempt to address all questions raised on previous slides –Identify lead person(s) for identified critical items Understand what we as a group can accomplish directly, and where we need to delegate –Generate action item lists for TAG leaders (or others) –Generate action items for us! Make plans (i.e. identify deliverables) for –Dubna (June) –ILC08 (November)

Global Design Effort CMG meeting schedule

Global Design Effort CMG meeting schedule

Global Design Effort Monday 05 May :00->12:00 Monday Morning 09:00 Introduction (1h00') Nicholas Walker (DESY) 10:00 RDR Cost Estimate website walk-through (1h00') Peter Garbincius (FNAL) 11:00 Cost Management discussions (1h00') 12:00 Lunch 13:30->17:00 Monday Afternoon 14:00 Process Cooling Water Cost Reduction Strategies (1h30') Wilhelm Bialowons (Deutsches Elektronen-Synchrotron DESY) 15:30 Main Linac Cooling Water (1h00') Marc Ross

Global Design Effort Tuesday 06 May :00->12:00 Tuesday Morning (Convener:Ewan Paterson) 09:00 Positron Source Cost Estimate drill-down Peter Garbincius (FNAL) 10:30 Positron Source design options (1h30') Ewan Paterson (SLAC) 12:00 Lunch 13:30->17:00 Tuesday Afternoon (Convener:J. Carwardine) 13:30 Requirements Traceability (1h00') John Carwardine (Argonne / ILC GDE) 14:30 Cost Analysis with spreadsheets (1h00') Thomas Himel (SLAC) 15:30 High Level RF cost estimate drill-down (1h00') Tetsuo Shidara (KEK)

Global Design Effort Wednesday 07 May :00->12:30 Wednesday Morning 09:00 Mid-week summary, task assignment N. Walker (DESY) 09:30 Staging, accelerator design (1h00') Ewan Paterson (SLAC) 10:30 Cost considerations for one vs two tunnelsThomas Himel 11:30 USTOS cost comparisons (30') Thomas Himel (SLAC) 12:00 Tesla cost comparisons (30') Nicholas Walker (DESY) 12:00 Lunch 13:30->19:00 Wednesday Afternoon 13:30 Underground Space: tunnels, shafts, caverns P. Garbincius 15:00 Cost Management consulting (1h00') Marc Ross (FNAL) 16:00 Magnets & Power Supplies cost estimate drill-down (1h00') John Carwardine (Argonne / ILC GDE) 17:00 Magnets & Power Supplies cost reduction options (1h00') Paul Bellomo (SLAC),Cherrill Spencer (SLAC)

Global Design Effort Thursday 08 May :00->11:00 Thursday Morning 09:00 Summary and wrap-up (15') Nicholas Walker (DESY) 10:00 Follow-up discussion with Lars Hagge on EDMS (1h00') Carwardine, Garbincius, Himel, Shidara

Global Design Effort Output of this Meeting Close-out summary of key issues, including: –Identify critical action items –Deliverables & dates –Decisions ! –Remaining (outstanding) issues Written summary report –For publication (to organisation) –Basis for presentation to EC

Global Design Effort