Summary of the GDE Tohoku Meeting ILC-GDE Project Managers Akira Yamamoto, Marc Ross, Nick Walker Sendai, March 6, 2008.

Slides:



Advertisements
Similar presentations
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Advertisements

Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 1 Barry Barish 2 nd Asian ILC R&D Seminar 29-September-08 Progress toward the ILC ATF-2.
Accelerator activities Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - Orsay 11/13.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
4-June-08 GDE Meeting - Dubna Global Design Effort 1 GDE Status/Update Barry Barish GDE Meeting at Dubna 4-June-08.
14-Feb-08 HEPAP Global Design Effort 1 Navigating the Bumpy Road to the ILC Barry Barish GDE Workshop - Sendai 3-March-08.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Global Design Effort Project Management Report Marc Ross Nick Walker Akira Yamamoto TILC08 GDE Meeting – Tohoku University – Sendai, Japan 3 rd March 2008.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
EUROTeV and the ILC Global Context Nick Walker (DESY) EUROTeV Annual Meeting INFN Frascati 24 January 2008.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
AAP Review 横谷 LC 定例 Preparation of AAP Review General charge sets the frame Version of early November Rough structure of the meeting has been.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
M. Ross for PM - ILC Global Design Effort 1 Dubna GDE Workshop ОИЯИ, Дубна, Marc Ross, Akira Yamamoto, Nick Walker GDE Project.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
November 05, 2008CFS-GBL meeting 1 PM report Nov 5, 2008: 0) ILC08 plenaries 1) Summary of Pac review 2) Report on ttc and barc (india) 3) Summary of positron.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
March 3-6, 2008 Global Design Effort 1 BDS way forward summary for GDE-BDS Andrei Seryi, SLAC Thanks to all participants of GDE-BDS and ACFA-MDI sessions.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Technical Design Report preparation
CLIC/ILC Collaboration Meeting: Objectives & Organization
Presentation transcript:

Summary of the GDE Tohoku Meeting ILC-GDE Project Managers Akira Yamamoto, Marc Ross, Nick Walker Sendai, March 6, 2008

Outline Objective and Goal of the meeting: Progress: –WG1: Cost Reduction –WG2: Superconducting RF –WG3: BDS –WG4: Damping Ring Reports from AAP and PM./PMOs Summary

Objectives Discuss and Establish: –Directions of Technical Design –Re-plan the R&D Program Focus on Technical discussions for TDP: –Cost reduction (WG-1) –Superconducting RF R&D (WG-2) –Beam Delivery System (WG-3) –Damping Ring (WG-4)

WG1: Cost Reduction Studies Reported by J. Carwadine, T. Shidara, N. Walker We must reduce the cost (in view of construction and operation) Targets –Staging / Scope –Main Linac Technology –CFS -- Scope of halls, caverns, shafts, etc. –Two vs one tunnel, and Shallow vs deep sites Premise for WG-1 –Invite new ideas, provide a forum for open discussion. RDR is technically sound but not optimised for cost. –No changes in scientific scope without engaging the physics community. WG-1 is not a decision-making group. Began sessions with >100 suggestions –that came from a call for cost reduction ideas. –Small sub-groups selected their ‘top-10’s. Specific topics highlighted –Aim to have initial assessments on key items by the Dubna meeting

WG2: SCRF Reported by H. Hayano, N. Ohuchi, A. Yamamoto R&D Re-plan: High gradient “E” R&D (S0) –E = 35 MV/: 50 % and 90%, in TDP1 and inTDP2 Operational “E” to be achieved with “International Effort” –, at S1-Global, in TDP1 : Positively discussed Cavity/Cryomodule Design: “Plug-compatible” interface boundary condition: defined Quadrupole location at center: agreed Cryomodule design w/ or w/o 5K shield: progressed High-Pressure design condition: confirmed Maintainability and MTBF issues: pointed out

Global R&D Plan Calender Year EDRTDP1TDP-II S0: Cavity Gradient (MV/m) (> 50%) 35 (>90%) KEK-STF-0.5a: 1 Tesla-like/LL KEK-STF1: 4 cavities S1-Global (AS-US-EU) 1 CM (4+2+2 cavities) CM (4 AS +2 US +2 EU ) S1(2) -ILC-NML- Fermilab CM1- 4 with beam CM2 CM3CM4 S2:STF2/KEK: 1 RF-unit with beam Fabrication in industries STF2 (3 CMs) Assemble & test

SCRF Cavities to be plug-compatible

Many thanks for Don Mitchell and Lars Hagge for 3D-CAD and EDMS

WG3: BDS/MDI and ATF Reported by M. Ross, Andrei Seryi ‘Just wait’ in FY08 –Focus on critical areas, strategic items Strong return in 09 (hopefully) –Especially in US (SLAC) For CY 2008: –ATF2  First Beam, at Oct.2008! –Detector Integration: Critical Design Area –Working with CERN/CLIC: developing the link

ATF collaboration: >200 scientists, 20 institutions worldwide ATF2: Beam delivery model ATF2 beamline Built for ILC. Advanced accelerator study and beam handling applicable to any single path beamlines

WG4: Damping Ring Reported by M. Palmer and A. Wolski Lattice Design: “DCO” proposed by Univ. L., CI (A.W., M.K.) selected as baseline “FODO5” proposed by IHEP (Y.P.S et al.) as alternate

Damping Ring Lattice Selected

ILC-CLIC Cooperation launched in Nov Objectives: Develop common knowledge of both designs and technologies, –CF&S, BDS/MDI, Detectors, Cost estimates, Beam dynamics/simulations, etc. Common Preparation of the (unavoidable) evaluation of technology, in credible and common basis, Most efficient use of limited resources, ILC-CLIC special session held in GDE/Tohoku, Important CY 2008 initiative –Expectations for November

Start of CLIC-ILC design work discussed/reported at GDE-Tohoku, WG3 Reviewed physics driving CLIC BDS design –coherent pairs; short train; post-collision measurements… D.Schulte Started study SR size growth in realistic detector field using tools developed for ILC S.Seletskiy σ y / σ y_ideal Theoretical Simulations SiD field (5T max) θ [mrad]

QD0QF1 Detector An approach to CLIC IR stability discussed/reported from GDE-Tohoku, WG3 Intratrain feedback kicker & BPM 2m from IP IP Feedback electronics and its shielding QD0 QF1 interferometer network tunnel floor ~3nm stable stabilization supports Slower than 1/L* dependence of Lum =>  L* Reduced feedback latency – several iteration of intratrain feedback over 150ns train FD placed on tunnel floor, which is ~ten times more stable than detector – easier for stabilization Not limited by sizes of stabilization system or interferometer hardware Reduced risk and increased feasibility May still consider shortened L* for upgrade

Aceelerator Advaisary Panel (AAP): an “Experiment” for SCRF started 1)Hasan Padamsee are working with us as an adviser from Accelerator Advisary Panel (AAP), 2)Monitor the EDR work with getting report from PMs/GLs with participating general/individual technical meetings to be carried out during the EDR phase. -for examples: monthly technical group leader meetings, specifice are meeting (such as SCRF meeting in April), and individual communication, -Give us technical advices, and 3)Review the progress in the EDR work, -for example, two major technical review: -Interim review in the middle of EDR (TDP1, 2), -Main review prior to the completion of the EDR (TDP1.2).

EDMS to be a Head EMO (Engineering Management office) –go-ahead to ask TAGLs (Technical/Area Group Leaders) for the member lists to use for EDMS “Teams” ASAP. Teams Projects (Released Vault) view check-out check-inrelease, approve revise Members of GDE acting as readers. team environments contain material for daily business projects are global archival areas

Members and their Actions Teams Projects (Released Vault) view check-out check-inrelease, approve revise Members of GDE acting as readers. team environments contain material for daily business projects are global archival areas Members of various “Teams” that are formed inside GDE, acting as document authors:. Examples: TAGs PMO PM Special TFs others Projects are global archival areas which implement specific access policies; they are used for releasing and publishing items Team workspaces offer structured access to those items which team members need for their daily work

A message from EU RD UK Situation In Dec. UK announced that the UK will drop the ILC, The regional director, B.F., is working hard to rescue the UK-ILC situation The agreement (shortly to be made official) restores 1 M pounds/year of accelerator funding This will support –Group Leaders of “positrons” and “damping ring” –Key Work-package Managers for the “BDS” –With minimum engineering and M&S.

Further Meeting Plans April 7-8 DESY Zeuthen –Positron source meeting April FNAL –SRF Main Linac Technology Review June 4-6 JINR (Dubna) –GDE Meeting: ILC CFS Workshop July 7-11 Cornell –Damping Ring Workshop (CESR-TA) November Chicago –LCWS / GDE Workshop

GDE (Dubna) Meeting Goals: Examine the CFS requirements of both ILC and CLIC. –Develop models for cost scaling to various alternative sites and CFS configurations, in particular shallow sites and single-tunnel options. –Examine the conventional facilities of the machines with particular attention to the cost drivers (process cooling water etc.), and understand the impact on them with respect to the choice of site configuration Review in detail the JINR site proposal Accelerator design of the central injector complex, RTML and BDS.

GDE Dubna Meeting: WGs WGsSubjectsConvener 1 Shallow solutions: Explore features and develop reduced-cost, shallow tunnel solutions. Both CLIC and ILC. Includes single tunnel. Dubna+ILC- CFS(CERN) 2 Infrastructure: Review infrastructure requirements and develop cost-effective solutions for accelerator infrastructure – power, water, air etc. Both CLIC and ILC. Dubna+ILC- CFS (KEK) 3 Siting: Examine possible sites and evaluate possible design differences that accommodate features. Includes staging, design modifications and upgrade issues. AS+ Integration 4 Accelerator Systems: particular focus on the central injection complex, BDS and RTML, including beam dynamics. Two AS leaders

Summary Design and R&D works –extended Technical Design Phase (TDP) work GDE Tohoku meeting progressed in –WG1: Cost-reduction Subjects and directions discussed, –WG2: SCRF Gradient, Cryomodule R&D re-plan proressed –WG3: BDS/MDI and ATF –WG4: Damping Ring Lattice DesignSelected, Dubna meeting will focus on CF&S.