Outline today’s session: - overview of the new forms

Slides:



Advertisements
Similar presentations
Contracts for Builders Ross Kinzler, Executive Director.
Advertisements

Organization of Primary Entities
Potential Second Access Currently we are working on approval access to 2 nd Avenue under CP tracks as shown in top left photo. Our entrance would be across.
Principal Life Insurance Company Disability Buy-Out Insurance
Lessons Learned: CM at Risk & Design Build
ISTISNA’.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
EPC & EPCM contracting.
MyFloridaMarketPlace Roundtable May 20, 2003 MyFloridaMarketPlace.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH.
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
Kyra Bell-Pasht April 16, 2013 Local Food Procurement: Trade Agreement Restrictions in Ontario Obstacles & Opportunities.
Structures for Investors Presented by: Kerrie-Anne Bailey KAS Tax & Business Solutions Phone: (07) April.
CMR Contract Documents Jon Walden Manager of Contracts & Compliance Ohio School Facilities Commission Lisa Conomy Construction Counsel The Ohio State University.
Center of Islamic Finance COMSATS Institute of Information Technology Lahore Campus 1 Adopted from open source lecture of Meezan Bank. Customized for best.
Construction Contracts and Project Delivery Methods
IDENTIFYING THE STRENGTHS & WEAKNESSES OF YOUR CONSTUCTION PROJECT McCune Construction Services Group, L.C.C.
Welcome to the OCR Academy. Overview of Rules & Law Craig Weise Construction Reform Program Director.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
Space Coast Communities Association Cocoa Beach, Florida September 19, 2015 COMMUNITY ASSOCIATION BUDGETING.
Mock State Aid Project County Highway Accountant’s Conference 2015.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
Financial Reporting (Overview & EFIS Users). 2 General Reporting Requirements  Reporting requirements are outlined in the 2011/12 Child Care Business.
1 Smart Schools Bond Act Completing the Smart Schools Investment Plan
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
Legal Issues for Project Managers Roy Nieuwenburg CW October 6, 2015 The Project Management Conference 2015 Program.
1 Agribusiness Library Lesson : Options. 2 Objectives 1.Describe the process of using options on futures contracts, and define terms associated.
Chapter 13 Estimates for Remodeling Work
Procurement Law – Latest developments in contract law / competitive bidding 18th Annual BC Institute PMAC Workshop Presented by Roy Nieuwenburg October.
Oracle Services Procurement
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
University of Calgary Continuing Education
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
Subcontractors and Suppliers Procedures for Receipt of Payment.
Accounting for Sales and Accounts Receivable Section 3: Special Topics in Merchandising Chapter 7 Section Objectives 7. Compute trade discounts.
CONSTRUCTION CHANGE DIRECTIVES UNDER THE NEW PUBLIC BID LAWS Speaker: STEVEN B. LOEB, Esq. BREAZEALE SACHSE & WILSON, LLP Tel: (225)
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Work shop on Procurement Key-performance indicators with selected implementing entities Public procurement and property administration agency August 2016.
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
University of Calgary Continuing Education
Class #1 Contract Delivery Systems
County Highway Accountant’s Conference 2015
Administration of a FIDIC Contract - Financial Management
PROJECT DELIVERY METHODS
SCC P2P – Collaboration Made Easy Contract Management training
Qualification Criteria and Available Tender Capacity
Grant Orientation Session
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Types of contract selection based upon following:
Designers’ Manual Overview and Chapter Contents
7 The System Learning Objectives Unit 7
Reporting and Interpreting Bonds
Grant Orientation Session
Presentation transcript:

Construction Management new CCDC 5A, CCDC 5B and CCDC 17 19th Annual BC Institute PMAC Workshop "Circle of Excellence" Construction Management new CCDC 5A, CCDC 5B and CCDC 17 September 28 – 30, 2011 Presented by Roy Nieuwenburg CW4649436

Outline today’s session: - overview of the new forms - discuss the changes - discuss how to work with these new templates Jump to Conclusion Slide – tell you want the conclusion will be …

first, any burning questions?

As of May 2011, the CCDC (Canadian Construction Documents Committee) and CCA (Canadian Construction Association) phased out the former construction management standard documents and replaced them with the new CCDC 5A and CCDC 5B Construction Management Contracts and the related CCDC 17 Trade Contractor Contract.

CCDC 5A – previously was “CCA 5 1988 - CANADIAN STANDARD CONSTRUCTION MANAGEMENT CONTRACT FORM BETWEEN OWNER AND CONSTRUCTION MANAGER” CCDC 5B – no previous equivalent. CCDC’s answer to “CM At Risk” or “CM converting to stip sum”. CCDC 17– previously was “CCA17 1996 STIPULATED PRICE CONTRACT FOR TRADE CONTRACTORS ON CONSTRUCTION MANAGEMENT PROJECTS”

Context – where does cm fit in the bigger picture? What is the best Project Delivery Method? What is the best Contracting Structure?

Construction Management Association of America “An Owner embarking on a construction project must make an important decision regarding the method by which the project is designed and constructed - the project delivery method.” Some further discussion – TAB F. See Tab 5 “At Risk” Construction Management – Construction Business, September / October 2006

Context – continued e.g. design – bid – build design - build etc.

“species” - stipulated price (e.g. CCDC2 2008) cost plus (e.g. CCDC3 1998) unit price (e.g. CCDC4 1982) construction management design build (e.g. CCA/CSC/RAIC 14 2000)

“species” continued: EPC– “engineer, procure, construct” or EPCM “engineer, procure, construction manage” etc.

“varieties” of e.g. stipulated price contract: - CCDC2 2008 - MMCD (Master Municipal) - Alberta Infrastructure prescribed forms - Civil Works Contract (CCDC18 – 2001) - Unit Price or lump sum stipulated price Province of BC Stip Price Contract (until 2002) many US examples (core of army engineers etc.) - many owners have their own forms – e.g. UBC PT, UBC, YVRAA, etc. Construction Owners Association of Alberta (COAA) published forms

back to construction management: variants of construction management: straight cm (CCDC suggests CCDC5A) cm converting to stip sum aka CM at risk (CCDC suggests CCDC5B) hybrids (next slide)

hybrids (can achieve similar result) variants of “cost plus” might be loosely considered to be akin to cm … stip sum contract with lots of cash allowances …

AIA [American Institute of Architects] equivalents Tab G – akin to CCDC5A: AIA Document C132–2009 – akin to CCDC5B: AIA Document A133–2009 [with a Guaranteed Maximum Price] AIA Document A134–2009 [without a Guarantee Maximum Price]

some advantages of cm transpancy to the trades fast tracking design assist direct control

disadvantages of cm pricing is “open ended” (more on this – see slide below) “will strive” “buck stops here” – with owner (see Hudson quote, below)

pricing is “open ended” Hudson’s on Building and Engineering Contracts: “Most of these management contract arrangements, when examined in detail …appear to be little more than thinly disguised collective cost-plus contracts in their ultimate final effect …”

“will strive” old CCA 5 said: “The Construction Manager, along with the Owner and the Consultant, … shall strive to achieve Substantial Performance of the Project by …[date]” as an assurance - underwhelming! - even this meager assurance was not included in new CCDC templates!

Supplementary Conditions for new CCDC: The Construction Manager, along with the Owner and the Consultant, shall strive to achieve Substantial Performance of the Project by the target date specified therefor by the Owner in the preliminary Project schedule approved by the Owner as it may be varied or amended from time to time with the approval of the Owner. [Substantial Performance of the Project – not even defined in new CCDC5A]

Another factor – Ministries and MASH entities AIT, TILMA (New West Partnership Trade Agreement), and Core Policy Manual, CAMF Capital Procurement Audit Checklist etc.: question - with cm, does each trade contractor have to be posted on BC Bid, tendered etc. {might prefer hybrid model}

Comparison – CCDC5A and CCDC5B CCDC 5A – for services CCDC 5B – for services and construction (i.e. “cm at risk” or “cm converting to stip sum”)

Comparison – CCDC5A and CCDC5B – cont’d Who do you want to enter into the contracts with the Trade Contractors? CCDC 5A – the Owner does … CCDC 5B – the Construction Manager does …

Comparison – CCDC5A and CCDC5B – cont’d Is the Construction Manager an agent or not? Must act in the best interests of the Owner? CCDC 5A – agent: See GC 2.1.4 CCDC 5B – not agent. see GC 1.5.2 See proposed SC 1.2” … shall carry out and perform the Services in a proficient and diligent manner and in accordance with any directions and instructions from time to time given by the Owner. … and at all times shall be candid and forthright with the Owner and act in the best interests of the Owner.

changes – new CCDC5A/5B versus old CCA5 old CCA5 – cm was agent (see above) “strive” – see above CCDC5B now contemplates converting to stip sum (old CCA5 did not)

changes – new CCDC5A/5B versus old CCA5 - continued Fees: time-based rates for personnel: Old CCA5: time-based rates for personnel employed by the Construction Manager was under of “Reimbursible Expenses” Now: – isolated as a separate heading – see paragraphs 5.2.3 and 5.3 on page 4 of CCDC5A.

changes – new CCDC5A/5B versus old CCA5 - continued chart listing services – must select and deselect services, and indicate – “how paid” [Roy – open CCDC5A – demonstrate Schedule A1]

changes – new CCDC5A/5B versus old CCA5 - continued Own Forces Work – formerly Article A-7 of CCA5 - deleted under new CCDC5A could include Own Forces Work as “ADDITIONAL SERVICES” under SCHEDULE B1 of CCDC5A – need to remember to do this, if you want the right to require this (e.g. temporary work, trailers, etc.)

changes – new CCDC5A/5B versus old CCA5 - continued Insurance Owner must maintain wrap policy for not less than $10mil.

changes – new CCDC5A/5B versus old CCA5 – cont’d GC 4.2.2 No deductions shall be made by the Owner from amounts payable to the Construction Manager other than those for which the Construction Manager is proven to be responsible …”.

Keep in mind PART 9 [INDEMNIFICATION AND WAIVER OF CLAIMS] - for colleges and institutes and universities not insured by CURIE, see requirements prescribed by Risk Management Branch.

Keep in mind - continued payment certifier – see paragraph 3.1.1.17 of the General Conditions. note, whatever it says in the cm document, the actual operative document, for this purpose, is the actual agreement with each individual Trade Contractor (i.e. the CCDC17).

Keep in mind - continued Unlike architects and engineers (who are exempted under Section 4(6) of the Builders Lien Act), Construction Managers are not exempted. Under the Builders Lien Act, must holdback 10% form construction manager. Also, unless an exempt entity, or if under the $100,000 threshold (applies to the improvement), must establish holdback savings account.

CCDC17 Basically, the new CCDC17 updates the old CCA17 1996 to bring it in line with changes brought in with CCDC2 2008

CCDC5B Appendix for conversion – looks very much like Supplementary Conditions. we’d be doing “Supplementary Conditions to the Supplementary Conditions”! My inclinations would be – if you want “cm converting to stip sum”, use simple format of CCDC5A and go from there. My inclinations would be – if you want cm converting to stip sum, use simple format of CCDC5A and go from there. WYSIWYG

Conclusion The base documents have changed. As before, can customize the base documents to get to where you need to be. Underlying issues are still the same. Need to update Supplementary Conditions for use with these forms.

THANK YOU ran@cwilson.com | 604.643.3112 www.cwilson.com Questions or Comments: Roy Nieuwenburg, Clark Wilson LLP ran@cwilson.com | 604.643.3112 www.cwilson.com Thank you option #2 Content on this page is flexible, i.e. if a lawyer wants it to read differently, fine … this is a starting point. Some may prefer to have the heading “Questions or Comments” followed simply with their contact info. Our website should always be included on the last slide. To print this presentation: Take the usual steps (i.e. file – print) … select the printer and format you want (i.e. slides, handouts, notes pages, etc.) … make sure the black & white option is NOT selected. Generally, people want the three slides per page option so they have space to take notes.