Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 CDMS Status, Upgrades and Plans Summary of running at Soudan Cryogenic and.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
PANDAX Results and Outlook
Oil Pressure Problems What to look for.
30 Ge & Si Crystals Arranged in verticals stacks of 6 called “towers” Shielding composed of lead, poly, and a muon veto not described. 7.6 cm diameter.
W. RauSNOLAB workshop 2009 S u p e r C D M S Wolfgang Rau Queen’s University CDMS Technology Analysis and Results SuperCDMS Detector R&D Underground TF.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
CRYOGENICS AND POWERING
ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)
Dan Bauer Fermilab Users Meeting June 3, 2004 Status of Cold Dark Matter Searches Dan Bauer, Fermilab Introduction Scientific case compelling for cold.
Refrigeration Basics 101.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Relaxation Studies at UIUC Jacob Yoder February 7 th, 2008.
Dan Bauer CDMS Collaboration Meeting February 11, 2005 Soudan Overview Highlights of work since July 2004 meeting Ended R119 on Aug 9 and warmed up Cryogenics.
APS April meeting Jacksonville, 2007 WIMP Search With SNOLAB Chris Jillings SNOLAB Staff Scientist For the DEAP-1 Collaboration.
From CDMSII to SuperCDMS Nader Mirabolfathi UC Berkeley INPAC meeting, May 2007, Berkeley (Marina) CDMSII : Current Status CDMSII Perspective Motivation.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Dark Matter Search with SuperCDMS Results, Status and Future Wolfgang Rau Queen’s University.
SuperCDMS From Soudan to SNOLAB Wolfgang Rau Queen’s University.
To do for the next K0 beam time Department of Physics, Tohoku University H. Kanda.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
A Study of Background Particles for the Implementation of a Neutron Veto into SuperCDMS Johanna-Laina Fischer 1, Dr. Lauren Hsu 2 1 Physics and Space Sciences.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Dan Bauer - CDMS Project ManagerAll experimenters meeting - April 23, 2007 Cryogenic Dark Matter Search (CDMS) Progress at Soudan since last summer Successful.
CDMS Computing Project Don Holmgren Other FNAL project members (all PPD): Project Manager: Dan Bauer Electronics: Mike Crisler Analysis: Erik Ramberg Engineering:
Véronique SANGLARD Université de Lyon, UCBL1 CNRS/IN2P3/IPNLyon Status of EDELWEISS-II.
He3 dilution refrigerator
OLAV III Experience with the LHC Insulation Vacuum System S. Blanchard, P. Cruikshank, B. Jenninger, N. Kos, W. Maan, L. Mourier, N. Provot, J. Wallner.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
DARK MATTER SEARCH Carter Hall, University of Maryland.
Ray Bunker (UCSB) – APS – April 17 th, 2005 CDMS SUF Run 21 Low-Mass WIMP Search Ray Bunker Jan 17 th -DOE UCSB Review.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
SuperCDMS From Soudan to SNOLAB Wolfgang Rau Queen’s University 1W. Rau – IPA 2014.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Low Mass WIMP Search with the CDMS Low Ionization Threshold Experiment Wolfgang Rau Queen’s University Kingston.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
18-20 May 2015, Underground Science Conference, SDSM&T 1John Harton, Colorado State University Recent Results from the DRIFT Directional DM Experiment.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
Michael A. Green and Heng Pan
SuperCDMS and CUTE at SNOLAB
SuperCDMS and CUTE at SNOLAB Wolfgang Rau Queen’s University for the
Installation of the T600 at Fermilab
Xiangyi Cui Shanghai Jiao Tong U. On Behalf of the Collaboration
CRYOGENICS OPERATIONS 2008 Organized by CERN
SuperCDMS at SNOLAB Wolfgang Rau Queen’s University for the
Harry Nelson UCSB DUSEL Henderson at Stony Brook May 5, 2006
Test box for ProtoDUNE SP – Integration Test
The Refrigeration Cycle (Air Conditioners)
Cryogenic cavern in Asian site
Mathew C. Wright January 26, 2009
SNS Cryoplant Commissioning Past Experiences
Detecting WIMPs using Au-DNA Microarrays
Presentation transcript:

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 CDMS Status, Upgrades and Plans Summary of running at Soudan Cryogenic and Detector Upgrades The Future -

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 CDMS (2006) Current CDMS sensitivity Maximum livetime = 85% (limited by cryo servicing need for calibration data) >2 years of stable data taking at Soudan Average livetime ~ 75% Xenon 10 Gamma Calibration ~10% of livetime CDMS (Feb 2008) DAMA MSSM We now have >1700 kg-days of exposure, sufficient to have world’s best spin- independent WIMP sensitivity for all WIMP masses. Approaching 10 Zeptobarn cross section!

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 Cryogenic Upgrades - UPS Replaced UPS for cryogenics system –Underground diesel generator backs up entire cryogenics system –Aging UPS was used to ‘bridge’ cryogenics control systems –Installed new 30 kVA unit to carry whole cryogenics system –Remote control and monitoring of UPS from the surface Underground diesel generatorUPS remote monitoring

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 Cryogenic Upgrades - Replaced Ebox Have lived for 2 years with small leaks in vacuum bulkhead (Ebox) –Air freezes out on cold surfaces, can cause vacuum bursts – If Helium gets in, it can reach detectors and affect signals –Occasional ~1 week warming to 4-77K has been necessary Problem was due to custom-design of Ebox –Warping of rectangular box made large o-ring seals difficult Solution was to buy large commercial vacuum cross –Had vendor weld high-vacuum detector electrical connections into commercial vacuum plates Decided to warm to room temperature in October to install –Takes about 2 weeks to warm, another 2 weeks to cool down –Actual work at room temperature about 2 weeks

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 Cryogenics Upgrades - Ebox Old ebox (note the black sealant)Stripline detector connections extracted New Ebox being installedReinstalling the stripline connections

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 Cryogenic Upgrades - Serviced Cryocooler Cryocooler removes excess heat at 4K and 77K –We cannot run 30 detectors without this Servicing involves replacing cold head at room temperature Why did we want to do this now? –Had 150% of recommended hours on the cold head –Valves or piston could begin sticking at some point –No evidence of performance problems but want to run another 2- 3 years at Soudan, so this was a good time to do this –Fortunately, the vendor (Sumitomo) can replace the cryocooler head without disturbing the delicate connections to e-stem –Challenge was supporting these connections during the operation New head should last for length of CDMS operation at Soudan

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 Cryogenic Upgrades - Cryocooler Supporting the cryocooler and estem during the cold head replacementThe cryocooler cold head

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 An interesting incident during cooldown Dilution refrigerator uses 1K pot to condense 3He –1K pot is filled from He bath via needle valves –Pumping on 4He in pot lowers temperature to 1.4K At this temperature, liquid Helium is a superfluid –Superfluid Helium tends to creep –Distance it can travel depends on surface roughness Small amount of air was accidentally introduced in bath –Plated out in needle valves, allowing superfluid Helium connection between 1K pot and 4K bath Result was a 1K pot temperature >1.9K and very poor condensation of 3He Had to warm again above 77K and pump away air –Now understand earlier instability with pot temperatures

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 Additional work planned in 2009 Soudan underground power feed –Near maximum capacity and getting old –Study underway to determine whether upgrades needed –May be possible to run separate feed for water pumps CDMS would like to install He liquefiers at Soudan –He costs are skyrocketing and availability is an issue 36% increase in costs this summer Several recent instances where supply was very tight CDMS uses about 70l/day –Purchased 3 cryocooler-based liquefiers in FY2008 Plan phased installation during Sufficient capacity to reduce He consumption by x10 –Requires additional power (8 kw/liquefier)

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 Detector Issues Many detectors have failed in the oldest two towers –These towers are now 6 years old and have seen many thermal cycles –Will do postmortem on failures when towers replaced; most suspected to be cold electronics and wire bonds –Net loss of about 1 kg Ge for the next three months New issues with Si detectors in this run –Many of our Si detectors show signs of charge leakage through the crystal –Run at reduced charge bias to avoid heating of phonon sensors –Si detectors are no longer crucial for WIMP search

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 Larger detectors to be deployed in 2009 Remove two oldest towers lose 1.5 kg Ge, 0.6 kg Si (mostly not working anyway) New SuperCDMS detectors each 3” dia x 1” => 0.64 kg of Ge with new phonon sensor design to improve fiducial volume

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 Replace CDMS II detectors with SuperCDMS detectors –0.25 kg Ge/0.1 kg Si --> 0.64 kg Ge –Each new tower has 5 Ge detectors => ~3 kg mass –Each also has two Ge endcap veto detectors Improves ability to reject backgrounds from nearby materials First ‘Supertower’ due in March 2009 –Will bring Ge mass to 6 kg Remaining 4 supertowers in early 2010 –Total deployed Ge mass will be 15 kg Two year run will yield x3 sensitivity improvement over the best that CDMS II will produce (x10 better than currently published).

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 The Future: Science goals – Increase sensitivity by x50 (compared with current published) – Reach WIMP-nucleon cross section of cm 2 – Find WIMP signal and compare with LHC Technical goals – Increase detector mass in stages up to 100 kg by 2012 – Stay background free – Challenge to deal with existing backgrounds at Soudan – New setup needed at SNOLAB to reduce neutron background Current status – First Soudan stage funded by DOE/NSF; full 15 kg funding requested – SNOLAB experiment has CD-0 and Stage 1 approval from FNAL Director – DMSAG2 review of the field in 2009 will likely determine funding prospects

Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 CDMS is the only DM experiment with demonstrated control of backgrounds Expected Background: 0.6  0.5 surface events and < 0.2 neutrons Make sure any events here are WIMPS, not background!