©Railinc 2010 All Rights Reserved Car Hire and DDCT Mark Aldenderfer, Business Analyst 1.

Slides:



Advertisements
Similar presentations
1 ACACSO Nov 2009 LCS Rule 15 Enhancements. 2 Rule 15 Definition Rule 15 is the transfer of car hire liability due to a road’s inability to accept railcars.
Advertisements

Presenter: Lisa Butts Watco Companies Modified from ASLRRA Car Hire Training Class A special thanks to Lance (my youngest son) for helping me with the.
1 Car Hire Rules 7 & 8 – After DDCTS Goes Live ACACSO – November 11, 2010 Tempe, AZ.
1 © 2013 Railinc Corp. All rights reserved. R ECLAIMS Presented By: Chauncey Fallen Manager-Transportation Services GATX Corporation- Rail.
©Railinc 2010 All Rights Reserved Weston Parkway, Suite 200, Cary, NC – Industry Initiatives: What is Railinc.
ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation.
ACACSO – New Orleans, LA May 11, 2012 Lynn Brown LB Rail Consultant, Inc. 1.
Transportation Codes & Transportation Conditions Codes ACACSO Meeting November 11, 2010 Presented by: Todd Poland, General Director Car Accounting Watco.
TOL’s All You Need to Know ACACSO, Austin TX Nov 10 – 12, 2014
Car Hire Rule 5 and Car Hire Rule 15 Transfer of Liability © 2007 Railinc. All rights reserved.
N Madison Yard Wiggins 2 Yard CSXT NS A L S UP BNSF Merchants Bridge MacArthur Bridge NS BNSF UP MRS Wiggins 5 Yard KCSUP NSBNSFKCSUP Gateway Arch CMR.
Car Hire Claims Workshop 101 November 13, AGENDA 8:30 to 8:45 Introductions & Attendance 8:45 to 9:00 AAR Certification on Car Hire Claims Discussion.
Union Pacific Railroad Future Car Accounting Process Linda Newell - Gen Dir ECommerce, Mike Carmichael - Sr Mgr Car Acctg, Lori Wies - Mgr Car Acctg May.
RAILINC I ACACSO
May EAC meeting Schedule 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks before the Business Services.
Railinc Vision of the Future of Car Hire Mark Aldenderfer, Business Analyst ACACSO November 12, 2010.
© Railinc 2009 All Rights Reserved 1 Railinc Corporation – 7001 Weston Parkway, Suite 200, Cary, NC – Report on Railinc’s.
©Railinc 2008 All Rights Reserved 1 Railinc Corporation – 7001 Weston Parkway, Suite 200, Cary, NC – Update on Umler/EMIS.
Damaged and Defective Car Tracking ACACSO May 12, 2010 © 2010 Railinc. All rights reserved.
EAC Update ACACSO November, EAC meeting schedule for 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks.
November  Cary, NC Oct. 4, 2011  Next meeting is in January via Conference Call.
Umler Project Status for ACACSO May 14, 2009 Full speed ahead towards the July 25 th implementation Full speed ahead towards the July 25 th implementation.
EAC Update for ACACSO November 2012 George A. Jones – Dir. Car Accounting and Disbursements CSX Transportation.
RAILINC I ACACSO
UMLER ISSUES THAT AFFECT CAR HIRE ACACSO Meeting November, 2014 Patty Livingston Manager Fleet Administration Genesee & Wyoming Railroad Services.
EAC Update ACACSO May 12, 2010 George A. Jones Project Update Damaged & Defective Car Tracking (DDCTS) – Work has begun on the 2010 project to complete.
Rule 22 Automation Update ACACSO – Austin, TX November 2014.
EAC Update for ACACSO May 2012 George A. Jones – Dir. Car Accounting CSX.
RAILINC I ACACSO
©Railinc 2010 All Rights Reserved Car Accounting Self Service Project Mark Aldenderfer, Business Analyst II 1.
Damaged and Defective Car Tracking System - Update Dale Cassels - CSX ACACSO November 12, 2008.
RAILINC I ACACSO
RULE 4 UPDATE ACACSO Meeting Atlanta – November 14, 2013 Scott Churchill.
©Railinc 2010 All Rights Reserved Weston Parkway, Suite 200, Cary, NC – Damaged and Defective Car Tracking.
©Railinc 2010 All Rights Reserved Car Accounting Self Service (CASS) ACACSO New Orleans May 9-12, 2012 Mark Aldenderfer Railinc Business Analyst II 1.
EAC UPDATE FOR ACACSO George A. Jones – Dir. Car Accounting and Disbursements CSX Transportation May 2013.
RAILINC I ACACSO
Barbara Ward November 13, 2008 ACACSO Orlando, Florida Improving the LCS Process LCS UPDATE.
UMLER ACACSO Meeting May 10 th, 2012 Patty Oakley Manager Fleet Administration Genesee & Wyoming Inc.
RAILINC I ACACSO
LCS Report Card Mike Partica May 2008 Chicago, Il.
© 2010 Railinc. All rights reserved. Industry Projects & Vision May 9, 2012 New Orleans, LA Jim Pinson Railinc.
RAILINC I ACACSO
TRAIN II Event Reporting Association of Car Accounting & Car Service Officers May 11 – 13, 2011 Burlington, VT.
RAILINC I ACACSO
Defect Damaged Car Tracking System Robert Sanford Manager Car Accounting Norfolk Southern.
1 © 2013 Railinc Corp. All rights reserved. R ECAP OF THE C AR H IRE R ULES ACACSO Workshop/Breakout Session Albuquerque, NM November 11 & 12, 2015.
Railroad Switching – Car Hire Impact
DDCT Running Repairs Program Maintenance
Car Hire TOL’s ACACSO, Coeur d’Alene, ID May 11 – 13, 2013
Car accounting self service Overview
Centralized Car Hire Foundation User Support Project
Liability Continuity System (LCS) Update
DDCT and How it Affects Car Hire
Jackie Singer CN System Manager – Business Process Optimization
© 2015 Railinc. All rights reserved.
Event Repository Reporting
Car Hire Data Exchange (CHDX) Edits Project Update
Suppressed Interchanges & Haulage
Antwan Dozier ACACSO May , 2018
ACACSO May 10, 2018 Kellie Bates Norfolk Southern
DDCT/Car Hire Workshop
Serving Area Process ACACSO Conference May 10, 2018
Liability Continuity System (LCS)
Damage Defective Car Tracking (DDCT) System
Car Hire Rule 4 Jim Pinson ACACSO May 7, 2014.
ACACSO San Antonio, TX May 9 – 11, 2018
Equipment Quality Reporting System
TRAIN II Jim Pinson ACACSO May 9, 2014.
Interchange Presenter: Lisa Butts Watco Companies.
Presentation transcript:

©Railinc 2010 All Rights Reserved Car Hire and DDCT Mark Aldenderfer, Business Analyst 1

©Railinc 2010 All Rights Reserved Car Hire Rules 7 and 8 January 1, 2011 new Car Hire Rules 7 and 8 became active The updated rules eliminate the need to create reclaims for rules 7 and 8 The rules reference special road marks that will be used to show car hire with the equipment owner or that the equipment is to be dismantled –DSP7,DVR7,DSP8,SHP7,SHP8 and DEAD 2

©Railinc 2010 All Rights Reserved Special Road marks Car Hire Rule 7 (107 Incident ) o DSP7 -- Equipment owner’s account Equipment interchanged to an intermediate carrier after DV/Disposition has been provided o DVR7 -- Equipment owner’s account DV/Disposition requested but equipment owner has not responded within the 15 day time limit 3

©Railinc 2010 All Rights Reserved Special Road marks Cont. Car Hire Rule 7 (107 incident) o SHP7 -- Equipment owner’s account The equipment reported on-hand at a repair shop. This can occur by an interchange reported showing “SHOP” in the “to road” or the equipment is reported on-hand through DDCTS. o DEAD -- Equipment owner’s account The equipment owner decides to dismantle the equipment. All events after will be marked with LCS Code “X” for inactive. If the equipment was approved for dismantle, but the equipment was not dismantled and returned to service, please contact the Railinc Customer Support Center. 4

©Railinc 2010 All Rights Reserved Special Road marks Cont. Car Hire Rule 8 (Incident 108 or 1) o DSP8 -- Equipment owner’s account Disposition requested o SHP8 -- Equipment owner’s account Equipment reported on-hand at a repair shop. This can occur by an interchange reported showing “SHOP” in the “to road” or the equipment is reported on-hand through DDCTS. o DEAD -- Equipment owner’s account The equipment owner decides to dismantle the equipment. All events after will be marked with LCS Code “X” for inactive. If the equipment was approved for dismantle, but the equipment was not dismantled and returned to service, please contact the Railinc Customer Support Center. 5

©Railinc 2010 All Rights Reserved DDCT Interaction with LCS and ER When an incident is created in DDCT, a TRAIN10 message will be sent to the Event Repository (ER) The TRAIN10 message will flag the equipment to be evaluated by DDCT LCS and LCS will not be evaluating the equipment Once DDCT LCS is turned on, TRAIN10 messages sent to the ER from DDCT will be evaluated and GAP records will be created using the special road marks 6

©Railinc 2010 All Rights Reserved LCS Messaging TRAIN61, TRAIN62, TRAIN63 and TRAIN69 messages will be created to show car hire in either a railroad’s account or the equipment owner’s account The DDCT special road marks will be sent in the “To Road” or “From Road” fields in the TRAIN message There has been no change to the format of the TRAIN messages 7

©Railinc 2010 All Rights Reserved Key Events for 107 DescriptionFrom RoadTo Road Incident 107 createdN/A DV/Disposition requestedN/A 15 days hit since DV/Disposition requestedDamaging Carrier DVR7 DV/Disposition Provided after 15 daysDVR7Damaging Carrier Equipment interchanged after DV/Disposition Provided Intermediate Carrier DSP7 Offer acceptedDamaging Carrier DSP7 then to DEAD Equipment reported on hand at SHOPDamaging Carrier or DSP7 SHP7 8

©Railinc 2010 All Rights Reserved Key Events for 1/108 9 DescriptionFrom RoadTo Road Incident CreatedN/A Disposition requestedHandling Carrier DSP8 Disposition providedN/A Equipment interchanged after DV/Disposition Provided Intermediate Carrier DSP8 Equipment reported on-hand at SHOPIntermediate Carrier or DSP8 SHP8 Equipment released from SHOPSHP8DSP8 Equipment marked as repairedSHP8Handling Carrier

©Railinc 2010 All Rights Reserved Example: Incident 107 EVENT TSFROM MARKTO MARKLCS Code DESCRIPTION 20AUG2010:13:38: PAS V incident created 23AUG2010:11:30: PAS V DV_DIPSO requested 23AUG2010:12:30: PAS V DV_DISPO provided 23AUG2010:12:42: PASSTR interchange reported from DC 23AUG2010:12:43: STDSP7G Gap record created one min after reported interchange 23AUG2010:13:30: DSP7SHP7G Gap record created one min prior reported at Shop 23AUG2010:13:31: SHP7 V car reported on hand through DDCT 23AUG2010:14:31: SHP7 V Repairs are reported complete 10

©Railinc 2010 All Rights Reserved Example: Incident EVENT TSFROM MARKTO MARKLCS CODE DESCRIPTION 20AUG2010:11:56: MRL V incident created 23AUG2010:13:00: MRLDSP8G Gap created to place CH in owners account 23AUG2010:13:01: DSP8 V DV_DIPSO requested 23AUG2010:14:17: DSP8 V DV_DISPO provided 23AUG2010:15:09: DSP8MRLG Gap created 1 min prior to interchange 23AUG2010:15:10: MRLBNSFP interchange reported from HC 23AUG2010:15:11: BNSFDSP8G Gap created 1 min after Interchange 23AUG2010:15:16: DSP8SHP8G 23AUG2010:15:17: SHP8 V car reported on hand 23AUG2010:16:17: SHP8 V car reported repairs complete

©Railinc 2010 All Rights Reserved Shops and DDCT LCS For car moving under a DDCT Incident it can be reported at a Shop in multiple ways –Railroad can report an interchange event to SHOP –Repair Shop can mark the car on-hand through DDCT system The DDCT LCS system works on a first come first serve logic, unless both are reported with 120 hours If Both are reported with 120 hours the reporting from DDCT system will be used 12

©Railinc 2010 All Rights Reserved Interchange to SHOP Reported If a Railroad reports an interchange to SHOP with no on-hand reporting from DDCT system within 120 hours –The interchange to SHOP will be used for DDCT LCS and liability will be moved to SHP7 or SHP8 –If on-hand is reported through DDCT system it will be marked as “X” If a Railroad reports an interchange to SHOP and an on-hand reporting from DDCT system is reported with 120 hours –The interchange will be marked as “I” –The On-Hand reporting from DDCT system will be used for DDCT LCS and liability will be moved to SHP7 or SHP8 13

©Railinc 2010 All Rights Reserved Repair Shop marks Car On-Hand through DDCT On-Hand reporting's by the repair shop from DDCT system will always be used for DDCT LCS to move liability to SHP7 or SHP8 UNLESS: –An interchange to SHOP reported by a Railroad has been evaluated by DDCT LCS and liability has already been moved to SHP7 or SHP8 –If this occurs the On-Hand reporting will not be used by DDCT LCS 14

©Railinc 2010 All Rights Reserved System Enhancements For 2011 Currently once a car has been placed to DEAD the only way that the car can be evaluated by LCS is by a database update –The enhancement will look at load/empty status and if the status changes twice we will return the car to LCS processing This change was requested during the project, but due to time restrictions could not be completed in

©Railinc 2010 All Rights Reserved 16 Questions? 7001 Weston Parkway, Suite 200, Cary, NC –

©Railinc 2010 All Rights Reserved 17 Contact us: RAILINC 7001 Weston Parkway, Suite 200, Cary, NC –