An-Najah National University Faculty of Engineering Building Engineering Department Graduation Project – 2 Integrated Design for Hotel Prepared By: Ahmad.

Slides:



Advertisements
Similar presentations
Integrated Design for Hotel with Revolving Restaurant
Advertisements

An-Najah National University Faculty of Engineering
An-Najah National University
Architectural modifications Structural design Environmental design Internal system design Main tasks.
An Najah National University Building Engineering Department Potential Energy glazing Technologies For Highly Glazed Buildings in Palestine Prepared by.
Outlines:-Outlines:- Environmental Design. Architectural Design Modifications. Structural Design Quantity compare Lighting and Mechanical Design.
Al-Najah National University Building Engineering department Design Of Cancer Center Prepared by:- Asma Atout, Najah Zadah and Rana Johary Supervisor:
An-Najah National University Faculty of Engineering Civil Engineering Department Terra Santa School Structural Design and Analysis Prepared By: Bara Shawahna.
An-Najah National University Engineering college Building Engineering Department Health Center Prepared by: Sobhi Ibrahim Islam Ammar Mohammad Odeh Supervisor:
بســـــــــــم الله الرحمن الرحيم Graduation Project 2 Presentation New Design of a Multipurpose Building Prepared By : Amjad Zidan Osama Rashad Ashraf.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Chapters Project title : Hirbawi Center A building lies in the east side of Tulkarm, this building consists of five stories of ( m 2 ) A building lies.
An- Najah National University 12/29/20131Multisport hall.
Tulkarem Multipurpose Sport Hall Prepared by: Moatasem Ghanim Abdul-Rahman Alsaabneh Malek Salatneh Supervisor: Dr. Shaker Albitar.
7 Mini Mall Design. Connection Quick View Architectural view.
An-Najah National University Faculty of Engineering Civil Engineering Department.
1. Out line  Site description  Architectural Design.  Structural Design  Environmental Design.  Mechanical design  Safety design An-Najah National.
By : Bara Thaher Mohammad Sameer Osama Joma’a Supervisor : Dr Sameh Mona Climate Responsive Design For Administrative Building In different climate zones.
Project ASolar ExposureProject B Solar Exposure
GRADUATION PROJECT II BUS & TAXI STATION Prepared By: Abeer Hawash Afnan Foqha Haya Awad An-Najah National University Faculty of Engineering and information.
Graduation Project report- II
}السلام عليكم ورحمة الله وبركاته{
An-Najah National University Faculty Of Engineering
Eng. Abdulhakeem Juhari
Prepared By: Dana Heigeh Isra’ Atallah Manar Raddad
Mechanisms. Mechanisms Outline: Architecture design Environmental design Structural design Electrical design Mechanical design Quantity surveying.
Design of an integrated 5-Star Hotel
An-Najah National University
Integrated Design Of Beauty Center & Wedding Hall
Coverage of Hikmat-Almasri Stadium
Prepared by : Reham Asaa’d Supervisor : Arch. Moa’yad Salhab
An-Najah National University Secondary School Design
An-Najah National University Building Engineering Department
Integrated Redesign of Rehabilitation Center for Mentally Disabled
An-Najah Sport Center An-Najah National University
“Nablus Municipality”
An-Najah National University Faculty of Engineering
AQQABA SECONDRY SCHOOL Structural Design.
Towards Green Building
Kindergarten Amani Nasasrah , Enas Awad Shadia Yamin , Sondos Ghanim
Chamber of Commerce & Industry
جامعة النجاح الوطنية كلية الهندسة قسم هندسة البناء
Studying Geothermal Heat Pump in Palestine
Redesign Of Integrated Car showroom
Redesigning of a Primary school
An-Najah National University Building Engineering Department Graduation Project 2: Design Orthopedic Specialist Hospital Prepared By: Mohannad Iyad Al-Shak’a.
Integrated design Of Fuel Station
Eng. Abdelhakeem Al-jawhari
A comprehensive design of Dorms For Nursing College
Moutasem Awwad Supervisor: Eng. Fadi Fatayer
An Integrative Design Of Residential Building
Restaurant Design Graduation Project “2” Prepared by: Isra’ Hasan Ali
An-Najah National University Faculty Of Engineering Building Engineering Department Graduation Project – II People with special needs school Prepared.
Graduation Project 2 Redesigning a Villa
Ahmad Daraghmeh. Asem Mayyaleh. Mustafa Fashafsha Abdassalam Najim.
Integrative Design of a Secondary School
Stock Exchange building design
Mulit functional Building design Graduation Project “2” Prepared by:
Environmental Friendly Multi purpose–Hall Design
Simulation Analysis for Green Design of Building Envelope
Graduation Project – 2 Mini-Mall
An-Najah National University
Analysis and Redesign of Al – Tatbeqea Faculty
Prepared By : Supervisor : Eng. Abdulhakeem Al- Jawhari Hareth Jepara
Villa Graduation Project 2 Prepared By : Abdalla Naem Dwikat
The sport hall.
Analysis And Design Of AS-Shorooq Residential Building
An Najah National University
بسم الله الرحمن الرحيم.
Presentation transcript:

An-Najah National University Faculty of Engineering Building Engineering Department Graduation Project – 2 Integrated Design for Hotel Prepared By: Ahmad Khalid Shams Ammar Yaser Abu Hantash Murad wael odwan Yazan Ahmad AlKilani Project supervisor: Dr. Amr Toffaha

Outline :  Site of the project  Architectural Design.  Environmental Design.  Structural and seismic Design.  Mechanical Design.  Electrical Design.  Safety Design.

Site of the project: Location and site: Area=21000m2

Site of the project: Location and site:

Architectural Design

The Site Plan for the project:

Ground Floor plan(Area =4072 m2)

First Floor plan(Area =2840 m2)

second Floor plan(Area =2840 m2)

Third Floor plan(Area =2840 m2)

forth Floor plan(Area =2840 m2)

North elevation

South elevation

West elevation

East elevation

Section A-A

Section B-B

Section C-C 18

Environmental Design

The good orientation of the hotel which allows sunlight to enter the hotel in the winter The good orientation of the hotel which allows sunlight to enter the hotel in the winter from most areas to maximize heat gain in winter. In the other hand we use double glass for windows and cantilever in all elevations to reduce heat gain in summer. and internal vertical shutters on West and East walls

Orientation of the building:

Annual sun path for the hotel

Sun path in January month:

Sun path in July month:

layers for external walls (U = W/m 2.k.)

U-value for the windows

Acoustical Design (Walls): Bedroom to Bedroom: type of walls between bedrooms is hollow blocks 20 cm thickness. STC required between bedrooms = 52 db STC layers 48 8-in. Dense hollow block Plus 4 Add plaster to both sides 52 Total

Acoustical Design (Walls): Corridor to Bedroom: type of walls between bedrooms is hollow blocks 20 cm thickness. STC required between bedrooms = 52 db STC layers 488-in. Dense hollow block Plus 10 Add furring strips, lath and plaster to both sides 58Total

Hall meetings must be completely isolated on the outside as well as having sound absorbing materials inside the hall and to achieve this was to use Acoustic panels with the highest sound absorption. 29

Structural and Seismic Design

Design Codes  The American Concrete Institute code ACI  The seismic design according to UBC-97.  The analysis and design were done using SAP2000 program. Structural Design

General note: In seismic design we divide the hotel into 5 blocks to make regular shapes and a seismic joint between them. Then we distribute columns and shear walls as shown below.

1. Concrete compressive strength : f’c =28 MPa for slabs, footing, and beams. f’c =35MPa for columns, and shear walls. 2.Yielding strength of steel The yield strength of steel Fy= 420MPa 3. Bearing capacity of soil the bearing capacity of soil = 350 KN/m 2 * Design data :

Structural system for block(3): One way ribbed slab with hidden beams Thickness of slab: The longest span(one end continues) = 530 cm. The thickness of slab (h) = Ln/18.5 = 530/18.5 =28cm The thickness of slab (h) = 31 cm

Beams dimension columns dimension Footings dimension Dimension (mm) Type 650*310Main beams 400*310Secondary beams TypeDimension (mm) Internal Columns800*400 Edge Columns700*400 Circular Columns500 mm diameter TypeDimension (cm) Internal isolated Footing270*270*60 Edge isolated Footing240*240*50 Wall Footing230*600*50

The distribution of columns and shear walls in the building:

3D Modeling from SAP2000 Program:

Check Model: Compatibility check

Equilibrium checks: Error%SAPManual 1.84 % Dead load.92 % Live load

Seismic design using Response Spectrum – UBC 97: W = 64740KN Soil type S B I = 1 R = 4.5 C v = 0.20 C a = 0.20 T = sec. V = 6610 KN

Natural Period (T) for the building: T(sec) 0.462From SAP Manual

Structural System Design : 1. Slab design:

2. Main Beam Design:

3. Columns Design (Edge Square Column) :

3. Columns Design (Internal Square Column) :

4. Footings Design:

4. Footings Design (Internal Isolated Footing) :

4. Footings Design (Edge Isolated Footing) :

4. Footings Design (Wall Footing) :

5. Shear Walls Design:

5. Reinforcement details around openings:

MechanicalDesign

General Mechanical design of a building involves many aspects including : 1. Water Supply System. 2. Drainage System Design. 3. Vertical Transportation (Elevators). 4. HVAC System

Water Supply System ** Large-size Underground water tank : Capacity = 150 cubic meter. ** two water tanks on the roof for cold water : Capacity = 30 cubic meter for each. ** two water tanks on the roof for hot water : Capacity = 20 cubic meter for each. ** two Pump each one between the underground tank and the cold water tank on the roof.

1-Water Supply System: At the beginning of the design we've divided the building into four zones as shown in the following figure and we designed the zone A.

1-Water Supply System: (The first floor to the forth floor water supply layout):

1-Water Supply System: Calculations : Water demand (gpm) Number of F.U Type of supply control Main feeder 72232Flush Tank Zone A Flush Tank Zone B 62179Flush Tank Zone C 63180Flush Tank Zone D

1-Water Supply System: Calculations : ** Pipes diameters for zone A: Diameter for inch)) branches Diameter for M.H.F(inch) Diameter for M.V.F(inch) floor G.F 3/81.252first 3/41.252second

1-Water Supply System: Calculations : The design of the last two floors like the second floor in addition to the auxiliary pump for each floor works 24 hours which is called Joke and the powers for the pump as follows: The power of the pump for F 4 = 0.433*(1 floor * 10.5 ft.) = 4.55 psi.

1-Water Supply System: Hot Water supply: **We have two water tank for hot water on the roof. **each one connect with solar panels and a boiler to heating water. ** Hot water pipes diameters will be the same of the cold water pipes diameters used.

2- Drainage System Design Pipes diameters : ** The vertical stack pipe diameter = 4 inch. ** horizontal pipes from laundry, kitchen sink and bathtub up to the floor drain diameter = 2 ¼ inch per foot slope. ** Horizontal pipe from floor drain to the vertical stack diameter = 4 1/8 inch per foot slope.

2- Drainage System Design (Pipes diameters) : ** horizontal pipe from lavatory to the vertical stack diameter = 4 1/8 inch per foot slope. ** The main drain pipes (underground pipes) diameter = 6 1% slope.

3- Vertical transportation (Elevators): ** The required elevators for the hotel after making the calculations are:  Two motor driven elevators: Capacity = 2500 lb., and speed = 350 fpm.  One special elevator for hotel services. To increase well-being in the hotel and to facilitate the movement of customers we used four elevators and two for service.

4- HVAC System: A heating, ventilating and air conditioning (HVAC) system is designed to satisfy the environmental requirements of comfort in summer and winter. In this section we designed the first floor which shown in the figure.

4- HVAC System: U values and : U(W/m2.k)Material External wall 0.50ceiling 2.260Glass(Double glazed low emittance) 3.60Wood door

4- HVAC System: Heating Load : The heat loss of a building consists of : Heat loss through all exposed walls ceiling,floor, windows and doors. Heat loss from ventilation and infiltration. Domestic hot water load.

4- HVAC System: Heating Load Calculations : heat loss by conduction = W Heat loss by infiltration and ventilation= W Domestic hot water load = 8128 W Heat load for boiler =( W W W)1.1=68960 W

4- HVAC System: Heating Load Calculations : No. of section and radiators: Each room need one radiator. Corridors A,C need two radiators. Corridors B,D need one radiator. Corridors E need four radiators. Each W.C need one radiator. Each space from previous spaces need number of sections different from other spaces.

4- HVAC System: Cooling Load : The heat gain of a building consists of : Heat gain from all exposed walls, ceiling,floor, windows and doors. Heat gain from people. Heat gain from lighting.

4- HVAC System: Cooling Load Calculations : Total heat gain =69383 W Number of exact : Each room from (1-12) need two exacts. Each room from (13-18) need three exacts. Each room from (19-26) need two exacts. Corridors A,C need five exacts. Corridors B,D need two exacts. Corridors E need six exacts.

ElectricalDesign

Electrical Design The lighting design depends on two types of lighting :  Day light.  Artificial lighting. Artificial lighting design depend on several factors such as: Room dimension. The function of the room. Selection of the luminaries. Maintenance factor for lamps. Reflection factors for ceiling, walls, and floors.

Electrical Design Restaurant: E recommended for restaurant = 200 lux E avg from dialux = 300 lux

Electrical Design Bedroom: E recommended for bedroom = 200 lux E avg from dialux = 252 lux

Electrical Design Distribution of lighting and switches for bedrooms: 78

Electrical Design Distribution of lighting and sockets for bedrooms:

SafetyDesign

Safety Design Safety design in the hotel includes many points such as: 1- stairs and distribute it in the hotel, in our project we have distributed four stairs tow of them at the middle and tow stairs at the edges of the hotel 2- safety signs and distribute it in the hotel. these two points to help people to evacuate the hotel in any case of emergency quickly and easily.

Safety Signs used and distributed in the hotel:

Right ExitLeft ExitExit Output stairsDo not use elevators

Safety Signs used and distributed in the hotel: Fire Exit First aid Emergency Lights Manual fire alarm Smoke detectorsExtinguishers

Safety Design 3- The third point in the design of safety is put out the fire in case the incident occurred and for this case we have used automatic sprinkler. ***The hotels are classified as Medium hazard, so the max distance from sprinkler to another Should not be more than 4.6 m, and the area that covers by each sprinkler Should not be more than 12.1 m 2.

Safety Design calculation for sprinklers: Area for each room in F1,F2,F3,F4=46.75 m 2 Area for each sprinkler = 12.1 m NO. of sprinkler for each room=46.75/12.1=3.8 Use 4 sprinkler for each room Each room need for 4 sprinkler and 2 smoke detectors