Thermocouples Isolated Omega Type-E T/C as used on vessel, ~$30 ea In-house signal conditioning equipment Instrument one 3-coil set: Winding pack near.

Slides:



Advertisements
Similar presentations
Status of M50 Modular Coils Winding form models based on m50_256.z01 have been posted in Pro/INTRALINK Working on tee/clamps, wings, port openings, poloidal.
Advertisements

WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60.
Status of Modular Coil Design D. Williamson, 4/9/03 Prototype Winding Form - Interim model based on m50_e03 - PF/TF supports, poloidal break added - To.
INTERMEDIATE PROJECT PRESENTATION: Hidden cracks/defects detection in aircrafts Department of Civil Engineering North Dakota State University.
ARIES Meeting, UCSD L. M. Waganer, June 2006 An Approach for Low Cost Fabrication of the Coil Structure L. M. Waganer With Support from Kevin Slattery.
Designing High Power Single Frequency Fiber Lasers Dmitriy Churin Course OPTI
Boat Orientation Objectives: Identify parts of various boats List hull types and shapes List Vessel Classes Define Types of Motors Define Capacity Plate.
Advanced Materials Human Powered Aircraft Group. Advanced Materials Advanced materials are used in aircraft design to: -Reduce weight -Improve strength.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
Landslide Monitoring by Optical Fiber Sensor SUGIMOTO, Hiroyuki Erosion and Sediment Control Research Group Public Works Research Institute 1.Principle.
NCSX Metrology 1/7/04. Short term purchase recommendation Buy the Spatial Analyzer Software package –This software will be the user interface for operating.
Jeff LaDouce Director, NWS Pacific Region. Pacific Region AOR.
MC Type-B fit up review1 Review of MC Type B assembly clearances reviewing A-to-B and B-to-C interfaces 3/1/07 Summary: Wing interfaces look okay between.
Multiple Coil Lift Calculation. Purposes of the Study  To investigate the stress distribution in the MCWF and the lifting device.  To make sure mounting.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
Stycast Insertion Part 3 and preliminary glue picture on samples
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
May 19-20, 2004NCSX FDRLeonard Myatt 1 Linear Structural Analysis of the NCSX Modular Coil & Shell Leonard Myatt NCSX Final Design Review May 19-20, 2004.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
ProCal V4.6x New Edition Features Direct Adapter Control.
CatVTM Controled atmosphere Vibrating magnetometer.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
Initial Dip testing fiber optic gages in LN2 at MDL
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
912 sPHENIX Solenoid Test Mar STRAIN GAGES MICRO MEASUREMENTS WK BG-350: QTY 28, QTY 21 OPERATIONAL 1. TS01 STRAIN-GAGE RADIAL TIE.
NCSX M. Cole, P. Fogarty, K. Freudenberg, T. Hargrove, G. Jones, G. Lovett, B. Nelson, D. Williamson April 27, 2005 Modular Coil Type-C Final Design Review.
NCSX P. Fogarty, K. Freudenberg, T. Hargrove, G. Lovett, B. Nelson, P. Goranson, D. Williamson October 15, 2004 Twisted Racetrack Coil Final Design Review.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
Bushing Material The bushings are made of G11CR. However, it has been shown that deflections (and bolt stresses) due to shear loads not reacted by friction.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
Christopher Cowden Advisor: Mario Spezziga Project: CMS HF (Forward Calorimeter)
Twisted Racetrack Revisited Model Changes: Side A has 10 turns Clamps have been modified to as built geometry. Property Changes (linear results.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
NCSX 1 CTD Test Results Kalish 11/30/04. NCSX 2 The Issue The Winding Pack (WP) insulation (pre- impregnated S-2 glass with co-wound polyimide film) has.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
1 FPA Stage 2 MC Flange Assembly Issues and Design Proposals June 20, 2006 T. Brown.
1 First wall mods status NCSX SIT Meeting July 1, 2002 Points at 0, 30, 60 degrees from Art Points x in cross sections RF launchers bigger issue.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
1 MC B3 Inspection MTM data: dated 12/22/06 1/6/07 Pro/E model: b3_mtm_data_check.asm T. Brown / D. Williamson.
1 MC B1 Inspection MTM data: FIDUCIALS.IGS DATA.IGS 9/26/06 Pro/E model: b1_mtm_data_check.asm.
1 First wall mods status NCSX SIT Meeting Aug 12, 2002 Points at 0, 30, 60 degrees from Art Points x and 1.00 in cross sections First try at vessel.
Deck Equipment AGOR 27. Deck Crane: TK Deck aft Portable Crane: TK Deck fwd Per Design Specification (J-1) Cranes Shall be capable of:
REDA Production Systems
1 Testing of Twisted Racetrack Coil B. Nelson TRC FDR 15 Oct 2004.
TF Joint Testing Data Acquisition Special Test Equipment Hans Schneider with Robert Marsala (609) Engineering Operations April.
Hot-Spot Temperature Experiment Chats Workshop 10 th October 2013 Kamil Sedlak, Pierluigi Bruzzone EPFL-CRPP, Villigen, Switzerland.
Semiconductor Strain Gages
Optical Fiber Sensors for Cryogenic applications Presented by: Daniele Inaudi, CTO SMARTEC
Instrumentation for status monitoring of SST-1 superconducting magnets
Fiber optic sensors integration in magnets and in test facilities
Mechanics of Solids ZHCET ME 213
nSW Alignment Installation
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Wo charges of 15 pC and –40 pC are inside a cube with sides that are of 0.40-m length. Determine the net electric flux through the surface of the cube.
Stresses, Strains and Deflections of Steel Beams in Pure Bending
David Gunther Applied Optics 10 March 2005
Other ways to solve the math.
SNS PPU Cryomodule Instrumentation
Layout of passages between TT2 and TT2A
as a prototype for Super c-tau factory
APTM and GRID interface requirement PBIP and PBW
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Thermocouples Isolated Omega Type-E T/C as used on vessel, ~$30 ea In-house signal conditioning equipment Instrument one 3-coil set: Winding pack near cooling inlet/outlet 2 gages x 2 wp x 2 plcs x 3 coils = 24 Winding pack near leads 2 gages x 2 wp x 3 coils = 12 Winding forms 6 gage x 3 coils = 18 Total no. gages = 54 Instrument winding pack only for remaining coils: 36 gages x 15 coils = 540 Total no. gages = 594 Cost = $18k

Thermocouples (winding pack) cooling inlet cooling exit leads option-1 leads option-2

Thermocouples (winding form) Thermocouple holes Surface mounted

Thermocouples (winding form) interface a-b (attach to wing surface)

Thermocouples (winding form) interface b-c (attach to wing surface)

Thermocouples (mounting) Thermocouple holes Surface mounted MCWF Hole Feature Vessel-Typical

Fiber optic strain gages Hole No Hole No Hole No Hole No Hole No Instrument two 3-coil sets (one field period) Gages arranged on a winding law plane within high stress regions Additional gages on winding form outboard region (low stress) Type-A Type-B Type-C

Fiber optic strain gages (high stress region) Side of winding pack, glue-on (qty=2) Tee septum, glue-on (qty=1) Tee base, weldable (qty=2)

Fiber optic strain gages (low stress region) Near leads, weldable (qty=6) Total no. gages = glue-on 32 weldable Cost = $17.5k incl min signal cond

Fiber Bragg Grating Gages Six gages per fiber length of 25-ft Defer signal cond equip purchase Instrument one coil of each type during winding ops Both sides of winding pack Qty = 4 runs per coil Total = 12 runs, 72 gages Cost = $14k + $5k to checkout after install