TM0 components inventory and procurement schedule In LAB testing facility 25.07.2011A. Bartalesi.

Slides:



Advertisements
Similar presentations
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Advertisements

CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
TMM of the CLIC Two-Beam Module T0 in the LAB – Proceedings to structural FEA Riku Raatikainen
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior R. Raatikainen.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
1 Assembly and installation of TM0 Lab components Assembly and installation of TM0 Lab components F. Rossi.
CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
TBM Vacuum considerations Alex Vamvakas 15/07/2015.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
1 Assembly procedure for PETS and AS 11-July-2011 Assembly procedure of PETS and AS for T0 module Lab F.
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
Xx-xx-2010, tanks arrive from Snezhinsk to Novosibirsk A.Tribendis, July 19-21, 2010, Snezhinsk 1. Check cavity dimensions on a CMM 2. Assemble and measure.
TBTS Test Program & Schedule G. Riddone
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
1 [24-July-2013] [CMWG] «BE-RF-PM» CLIC TBM Prototypes Status EDMS №[Number] Dmitry Gudkov 1.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
CLIC activity of W. Zhou Feb 20121W. Zhou, BE-RF-PM Procurement Quality assurance.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
LCWS11 WG4 Fully featured accelerating structure engineering design
CLIC Parameter Working Group Two Beam Module Design
Update on the DB Girders FE Analyses
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Complementary ISTC Projects #3888, 3889p
Module roadmap to end of 2017
Thermal review of CLIC module
TBL, Status, Plans, Experiments
12 GHz High Power RF components requirements for CEA activities
List of changes and improvements for the next generation CLIC module
Installation plan for LAB modules
TM0s and TM1 components inventory and procurement schedule
Beam Wire Scanners (PS prototype and LIU series)
LARP Phase II Secondary Collimator RC-1
Undulator System Components Status Dean Walters
Crab – RFD prototype: Fabrication Status Update
Presentation transcript:

TM0 components inventory and procurement schedule In LAB testing facility A. Bartalesi

Procuring overview Priotity /11/2010 Floor interface plate Priority /12/2010 MB girders with V-shaped supports, cradles and actuators DB girders with V-shaped supports Cradles Actuators Priority /01/2011 Accelerating structures Damping material Cooling interfaces RF flanges Interconn. flanges Interconn. bellows PETS Damping material Cooling interfaces RF flanges Interconn. flanges DB QUADS BPM Vacuum chamber Support plate Interconn. bellows Priority /02/2011 Vacuum Supports Vacuum reservoir Interconn. bellows Priority /02/2011 RF distribution Waveguides RF components RF flanges RF loads Priority /03/2011 Vacuum network Priority /03/2011 Cooling system Priority /03/2011 Heating device Transport device Labels: 3D done 2D done Ordered Delivered A. Bartalesi

Accelerating structure overview A. Bartalesi MB Unit (Assembly) Flange (VS)Compact load (RS) Intermodule interconnection (VS) Cooling tubes (RS) Manifold (RS) Waveguides (RS)

A. Bartalesi

Accelerating structure 1/ A. Bartalesi NameType Drawing Design responsible Price inquiry launched Price inquiry deadline Order date Fabrication finish date Delivery dateLast updateQuantity Real or Mock up? StatusFirm Procurement responsible Comments WFM WG bodyPart CLIATLAS0031D.GUDKOV24/03/201122/07/201132MReceivedCOMEBA.French Quantity: Received 7 - MANIFOLD CELL (CLIC TEST) Part CLIATLAS0122D.GUDKOV24/03/201108/07/201121/07/20114MDeliveredCOMEB, BSA.French Quantity: Delivered 1 (COMEB), Delivered 1 (BS), Inventory:2 12WDSDVG1.8_R0 5_SIC CORNER SUPPORT_001 Part CLIAAS120080A.SOLODKO24/03/201121/07/ MDeliveredManyA.French Quantity: Delivered 6 (Philippe), Delivered 10 (COMEB) Inventory:10 ALIGNMENT INTERFACE CELL Part CLIATLAS0104D. GUDKOV24/03/201121/07/201116MReceived in partCOMEB, BSA. French Quantity: Delivered 4 (COMEB), Arrived 2 (at BS), Inventory:4 AS MANIFOLD EXTREMITY CELL Part CLIATLAS0113D.GUDKOV24/03/201121/07/201132MDeliveredCOMEB, BSA.French Quantity: Delivered 8 (COMEB), Delivered 4 (BS), Inventory:12 AS MOCK-UP - MANIFOLD COVER (TANK INT.) Part CLIATLAS0067D.GUDKOV24/03/201121/07/20118MDeliveredCOMEBA.French Quantity: Delivered 2, Inventory:2 AS MOCK-UP - MANIFOLD COVER SIMPLE Part CLIATLAS0070D.GUDKOV24/03/201121/07/201124MDeliveredCOMEBA.French Quantity: Delivered 6, Inventory:6 AS MOCK-UP COUPLER A TYPE 1 Part CLIATLAS0106D. GUDKOV24/03/201121/07/20117MReceived in partCOMEB, BSA.French Quantity: Delivered 2 (COMEB), Arrived 1 (at BS), Inventory:2 AS MOCK-UP COUPLER A TYPE 2 Part CLIATLAS0109D. GUDKOV24/03/201121/07/20111MReceived in partCOMEB, BSA.French Quantity: Delivered 1 (COMEB), Arrived 1 (at BS), Inventory:1

Accelerating structure 2/ A. Bartalesi NameType Drawing Design responsible Price inquiry launched Price inquiry deadline Order date Fabrication finish date Delivery dateLast updateQuantity Real or Mock up? StatusFirm Procurement responsible Comments AS MOCK-UP COUPLER B TYPE 1 Part CLIATLAS0107D. GUDKOV24/03/201121/07/20118MReceived in partCOMEB, BSA.French Quantity: Delivered 2 (COMEB), Arrived 1 (at BS), Inventory:2 AS MOCK-UP EXTREMITY CELL Part CLIATLAS0108D. GUDKOV24/03/201121/07/20117MDeliveredCOMEB, BSA.French Quantity: Delivered 2 (COMEB), Delivered 1 (BS), Inventory:3 AS MOCK-UP EXTREMITY CELL TYPE 3 Part CLIATLAS0116D. GUDKOV24/03/201121/07/20111MReceived in partCOMEB, BSA.French Quantity: Delivered 1 (COMEB), Arrived 1 (at BS), Inventory:1 AS MOCK-UP INPUT CELL Part CLIATLAS0105D. GUDKOV24/03/201121/07/20118MReceived in partCOMEB, BSA.French Quantity: Delivered 2 (COMEB), Arrived 1 (at BS), Inventory:2 AS MOCK-UP MANIFOLD DM INTERFACE Part CLIATLAS0110D.GUDKOV24/03/201121/07/201164MDeliveredCOMEB, BSA.French Quantity: Delivered 16 (COMEB), Delivered 8 (BS), Inventory:24 AS MOCK-UP MANIFOLD STANDARD CELL Part CLIATLAS0111D.GUDKOV24/03/201121/07/ MReceived in partCOMEB, BSA.French Quantity: Delivered 165 (COMEB), Arrived 8 (at BS), Inventory:165 AS MOCK-UP STANDARD CELL Part CLIATLAS0099D. GUDKOV24/03/201121/07/ MDeliveredCOMEB, BSA.French Quantity: Delivered 40 (COMEB), Delivered 20 (BS), Inventory:60

Accelerating structure 3/ A. Bartalesi NameType Drawing Design responsible Price inquiry launched Price inquiry deadline Order date Fabrication finish date Delivery dateLast updateQuantity Real or Mock up? StatusFirm Procurement responsible Comments AS-cooling fitting adapter Part CLIATLAS0053D.GUDKOV24/03/201121/07/ RDeliveredCOMEBA.French Quantity: Delivered 9 (Philippe), Delivered 16 (COMEB) Inventory:16 Connector (Swagelok) Part B-8M0-1-4RP21/07/20118RDeliveredSwagelokA.FrenchInventory: 28 COOLING INTERFACE CELL Part CLIATLAS0103D. GUDKOV24/03/201121/07/201116MReceived in partCOMEB, BSA.French Quantity: Delivered 4 (COMEB), Arrived 2 (at BS), Inventory:4 Cooling tube type 3Part CLIATLAS0082D.GUDKOV18/02/201111/04/201121/07/20114MDeliveredCERNA.French Reference person A.Said, Inventory: 5 (Quantity) Copper gasket (Swagelok) Part CU-4-RP-221/07/20118RDeliveredSwagelokA.FrenchInventory:28 Damping material 12Part CLIATLAS0072D.GUDKOV17/11/201021/07/ RDelivered Andalo Gianni A.FrenchInventory: 36 HOR MANIFOLD WG TYPE 1 Part CLIATLAS0097D.GUDKOV21/02/201121/07/20118MDeliveredCERNA.French HOR MANIFOLD WG TYPE 2 Part CLIATLAS0098D.GUDKOV21/02/201121/07/20118MDeliveredManyA.French Inventory: 32 (Quantity) Hor. Manifold WG type 1 (mirrored) Part CLIATLAS0120D.GUDKOV21/02/201121/07/20118MDeliveredCERNA.French Hor. Manifold WG type 2 (mirrored) Part CLIATLAS0121D.GUDKOV21/02/201121/07/20118MDeliveredCERNA.French Inventory: 9 (Quantity) Intermediate piecePart CLIATLAS0075D.GUDKOV24/03/201108/07/201121/07/20111MReceived in partCOMEB, BSA.French Quantity: Delivered 1 (COMEB), Inventory:1 Intermediate piece 2Part CLIATLAS0056D.GUDKOV24/03/201108/07/201121/07/20111MDeliveredCOMEB, BSA.French Quantity: Delivered 1 (COMEB), Inventory:1 Manifold small cover 2 Part CLIATLAS0065D.GUDKOV24/03/201121/07/201116MDeliveredCOMEBA.French Quantity: Delivered 8, Inventory:8 Manifold small cover 3 body Part CLIATLAS0060D.GUDKOV24/03/201121/07/201132MDeliveredCOMEBA.French Quantity: Delivered 8, Inventory:8

Accelerating structure 4/ A. Bartalesi NameType Drawing Design responsible Price inquiry launched Price inquiry deadline Order date Fabrication finish date Delivery dateLast updateQuantity Real or Mock up? StatusFirm Procurement responsible Comments Manifold small cover 3 insert Part CLIATLAS0090D.GUDKOV24/03/201121/07/201116MDeliveredCOMEBA. French Quantity: Delivered 4, Inventory:4 MANIFOLD WFM- CART INTERFACE Part CLIATLAS0112D.GUDKOV24/03/201121/07/201132MDeliveredCOMEB, BSA.French Quantity: Delivered 8 (COMEB), Delivered 4 (BS), Inventory:12 PINPart CLIATLAS0063D.GUDKOV24/03/201121/07/201116MDeliveredCOMEBA.French Quantity: Delivered 4, Inventory:4 VACUUM TUBE Assembly (welding) Assembly CLIATLAS0096D. GUDKOV21/07/20112MDeliveredCOMEBA.French WAVEGUIDE DAMPING INTERFACE H1 Part CLIATLAS0100D.GUDKOV24/03/201121/07/201132MDeliveredCOMEB, BSA. French Quantity: Delivered 8 (COMEB), Delivered 4 (BS), Inventory:43 WAVEGUIDE DAMPING INTERFACE H2 Part CLIATLAS0101D.GUDKOV24/03/201121/07/201132MReceived in partCOMEB, BSA.French Quantity: Delivered 8 (COMEB), Arrived 4 (at BS), Inventory:8 WFM WG coverPart CLIATLAS0030D.GUDKOV24/03/201121/07/201132MDeliveredCOMEBA.French Quantity: Delivered 8, Inventory:8 Cooling tube type 1Part CLIATLAS0080D.GUDKOV18/02/201111/04/201112/07/20114MDeliveredCERNA.French Reference person A.Said Cooling tube type 4Part CLIATLAS0081D.GUDKOV18/02/201111/04/201112/07/201116MDeliveredCERNA.French Reference person A.Said Copper tubing RF System Part (Drawing)12/07/20114MDeliveredCERNA.French Intermodule interconnection DM Part CLIATLAS0086D.GUDKOV30/11/201012/07/20112ROrderedM.P.A.French MB ACCELERATING STRUCTURE - COOLING TUBE U75 CLIATLAS0092D.GUDKOV18/02/201111/04/201112/07/20114MDeliveredCERNA.French Reference person A.Said

Accelerating structure 5/ A. Bartalesi NameType Drawing Design responsible Price inquiry launched Price inquiry deadline Order date Fabrication finish date Delivery dateLast updateQuantity Real or Mock up? StatusFirm Procurement responsible Comments Positionable (Swagelok) B-8M0-5-4PR12/07/ RDeliveredSwagelokA.French Positionable elbow (Swagelok) Part B-8M0-2-4RP12/07/201120MDeliveredSwagelokA.French Screw Vacom MC- 310 Part Commercial: MC /07/201148R?VacomA.French Quantity: Ordered 48 Screw Vacom MFA- 412 Part Commercial: MFA /07/20118R?VacomA.French Quantity: Ordered 8 VACUUM TUBE FLANGE Part CLIATLAS0095D. GUDKOV24/03/201112/07/20118MShippedCOMEBA.French Quantity: Shipped 2 VACUUM TUBE P1Part CLIATLAS0094D. GUDKOV24/03/201112/07/20118MShippedCOMEBA.French Quantity: Shipped 2 CLIC experimental flange Part CLIAVACU018 4 V.SOLDATO V 22/07/201125/07/ (+4 in PETS) RReceived in part Kvisgaard (man.) Cinel, VDL (p.inq.) C.Garion Ø 74 1 Protototype being manufactured by Kvisgaard 250 pieces received (CINEL) Price inquiry at VDL for 50 pieces

PETS structure overview A. Bartalesi DRIVE BEAM – PETS ASSEMBLY Interconnection Flanges (Fixed) PETS On-Off (Coupler) PETS Mock-Up Interconnection Flanges (Fixed) Cooling tubes Cooling fittings adapter Cooling adapter PETS Minitanks

A. Bartalesi

PETS structure A. Bartalesi NameTypeDrawing Design responsible Price inquiry launched Price inquiry deadline Order date Fabricatio n finish date Delivery date Last update Quan tity Real or Mock up? StatusFirm Procurement responsible Comments Holder platePartCLIATLPE0003V.SOLDATOV08/07/201112/07/201132M Delivered from Chatel Chatel, CostaA.French J.M.G. reference person, Quantity: Delivered 16 (Chatel) ON-OFF half 1PartCLIATLPE0033V.SOLDATOV20/01/201114/03/201111/07/201112/07/20114M Delivered from Lindenthal Lindenthal, CostaA.French A.Said reference person, Quantity: Delivered 2 (Lindenthal) ON-OFF half 2PartCLIATLPE0034V.SOLDATOV15/01/201114/03/201111/07/201112/07/20114M Delivered from Lindenthal Lindenthal, CostaA.French A.Said reference person, Quantity: Delivered 2 (Lindenthal) Parallel pin 5x20PartCLIATLPE0049V.SOLDATOV08/07/201112/07/201116R Delivered from Chatel Chatel, CostaA.French J.M.G. reference person, Quantity: Delivered 8 (Chatel) PETS Cooling adapter PartCLIATLPE0030V.SOLDATOV11/07/201112/07/20118R Delivered from Lindenthal Lindenthal, CostaA.French J.M.G. reference person, Quantity: Delivered 4 (Lindenthal) PinPartCLIATLPE0004V.SOLDATOV08/07/201112/07/201164M Delivered from Verejnoprospens e Verejnoprospense, Costa A.French Quantity: Delivered 32 (Verejnoprospense) Plug Ø14PartCLIATLPE0043V.SOLDATOV08/07/201112/07/20118R Delivered from Chatel Chatel, CostaA.French J.M.G. reference person, Quantity: Delivered 4 (Chatel) Swagelok brass tube fitting Part Commercial B- 10M0-1-4RP 12/07/20118RReceivedSwagelokA.French TubePartCLIATLPE0011V.SOLDATOV08/07/201112/07/20114R Delivered from Chatel Chatel, CostaA.French J.M.G. reference person, Quantity: Delivered 2 (Chatel) UHV CV fixed flange Ø202 PartCLIATLPE0017V.SOLDATOV08/07/201112/07/20112R Delivered from Chatel Chatel, CostaA.French J.M.G. reference person, Quantity: Delivered 1 (Chatel) CLIC experimental flange PartCLIAVACU0184V.SOLDATOV22/07/201125/07/2011 4(+36 in AS) RReceived in part Kvisgaard (man.) Cinel, VDL (p.inq.) C.Garion Ø 74 1 Protototype being manufactured by Kvisgaard 250 pieces received (CINEL) Price inquiry at VDL for 50 pieces

Vacuum system overview A. Bartalesi Type 1 Type 2 Central vacuum tank and pumps Vacuum network

A. Bartalesi

BI system overview A. Bartalesi Vacuum chamber Rotating flange BPM mockup

Vacuum system A. Bartalesi NameTypeDrawing Design responsible Price inquiry launched Price inquiry deadline Order date Fabrication finish date Delivery date Last update Quantity Real or Mock up? StatusFirm Procurement responsible Comments CLIC UHV RF gasketPartCLIATLVS0005L.FAISANDEL01/01/201022/07/201125/07/201140RReceivedGARLOCKC.Garion BI system NameTypeDrawing Design responsible Price inquiry launched Price inquiry deadline Order date Fabrication finish date Delivery date Last update Quantity Real or Mock up? StatusFirm Procurement responsible Comments BPM ALIGNMENT FRAMEPartCLIATLBI0008D.GUDKOV15/02/201122/07/201125/07/20112MProduction finished CERN (A.P.) L.Soby DB BPM Body Mock-upPartCLIATLBI0024D.GUDKOV15/02/201122/07/201125/07/20112MProduction finished CERN (A.P.) L.Soby DB BPM MOCK-UP DRIFT TUBE PartCLIATLBI0026D.GUDKOV15/02/201122/07/201125/07/20112MProduction finished CERN (A.P.) L.Soby DB BPM MOCK-UP INTERCONNECTION INTERFACE PartCLIATLBI0027D.GUDKOV15/02/201122/07/201125/07/20112MProduction finished CERN (A.P.) L.Soby DB BPM STRIPLINEPartCLIATLBI0025D.GUDKOV15/02/201122/07/201125/07/20112MProduction finished CERN (A.P.) L.Soby HEX SKT HD CAP Screw M4x8 Part Commercial (VIS CHC_M4x8) 15/02/201122/07/201125/07/20114MProduction finished CERN (A.P.) L.Soby PIN D4X10PartCLIATLBI0013D.GUDKOV15/02/201122/07/201125/07/20112MProduction finished CERN (A.P.) L.Soby UHV FLANGE RING 114/63PartSTDVFUHV0008ACROTECNA22/07/201125/07/20112RDoneCERNC.Garion UHV flange ring threaded 202/150 PartCLIATLVS0003D.GUDKOV22/07/201125/07/20112RDoneCERNC.Garion UHV ROTAT. FLANGE 114/63 Insert PartCLIATLVS0002D.GUDKOV01/12/201022/07/201125/07/20112RDoneCERNC.Garion UHV ROTAT. FLANGE 202/150 INSERT PartCLIATLVS0001D.GUDKOV01/12/201022/07/201125/07/20112RDoneCERNC.Garion

Test module type A. Bartalesi  We are still working on the TM1 inventory and database: it will be inserted from the next TM meeting