El Gallo Hydroelectricity Project PDD Analysis

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

The Concept of Incremental Costs Typical GEF Projects for Climate Change 1. Energy Efficiency (Operational Prog. 5) Industrial Boilers Agricultural Pump-Sets.
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions reduction George Mavrotas.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Results Based Financing : Private Sector experiences in Latam GDF SUEZ ENERGY LATIN AMERICA Philipp Hauser – VP Carbon Markets
A Lower-Cost Option for Substantial CO 2 Emission Reductions Ron Edelstein Gas Technology Institute NARUC Meeting Washington DC February 2008.
中 国 水力资源与开发概况 Overview of Hydropower Resources and Development in China Zhou Shangjie China Society for Hydropower Engineering.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Eng Rafik G. M. of Economic and Environment Studies NREA Baseline For Japanese Wind Power Plant Project in Zafarana (Arab Republic of Egypt)
Barriers to Greenhouse Gas Mitigation Options in Developing Economies like Sri Lanka and Strategies to Overcome them Professor Priyantha D.C. Wijayatunga.
Regional Emission-free Technology Implementation (RETI): Diversifying the U.S. Electricity Portfolio Marc Santos 2008 ASME WISE Intern University of Massachusetts.
FIRST CAPACITY BUILDING WORKSHOP ON CLEAN DEVELOPMENT MECHANISM (CDM) UNDER CD4CDM INITIATIVE Date: 8-9 April, 2008 Venue: LGED Bhaban, Dhaka Presented.
Energy Infrastructure in Latin America the View of the IDB May 6, 2011 Miami, Florida Sustainable Energy for all.
Meeting the Goal: Progress Report Washington, DC June 30, x’25 National Summit 2010: Mission Achievable.
IPCC Synthesis Report Part IV Costs of mitigation measures Jayant Sathaye.
STRATEGIES FOR PROMOTION OF ENERGY EFFICIENT AND CLEANER TECHNOLOGIES IN THE POWER SECTOR Synthesis Report Issue 1: Implications of Carbon & Energy Taxes.
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
NEW VISION OF ENGINEERING ECONOMY COURSE (VISION) MODULE 3 LECTURE 7 Cairo, 17 July 2005.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
Opportunities and Constraints on Possible Options for Transport Sector CDM Projects – Brazilian Case Studies Suzana Kahn Ribeiro Importance of Transport.
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
Case Study 5: Gemina rice husk project, Nicaragua Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event.
Hydro-Power Presentation sponsored by: Hydro-Solutions of New Hampshire Presenter: Jean-Philippe Dubois.
© OECD/IEA 2010 Cecilia Tam International Energy Agency Martin Taylor Nuclear Energy Agency The Role of Nuclear Energy in a Sustainable Energy Future Paris,
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
California’s Greenhouse Gas Emission Reduction Law and Nuclear Power California State Assemblyman Chuck DeVore January 26, 2009 Presented in the California.
1. Summit Implementation Review Group December 10, 2008 El Salvador Philippe Benoit Sector Manager, Energy Latin America and the Caribbean The World Bank.
CDM Methodologies and Project Design: Workshop for CDM Project Developers 12/5/2004. Buenos Aires. Analysis of the Additionality Tool (with project examples)
Case Study: Jepirachi Wind Power Project Northeastern Atlantic Coast Colombia Charles Cormier, PCF Team Tel:
Solar Water Heating for Climate Protection: The Role for Carbon Finance Presented At: COP11 MOP 1, Montreal Canada 30 November 2005 By: Steven Kaufman.
Environmental Challenges and Opportunities of the Evolving North American Electricity Market Presentation for UNFCCC Workshop on Cleaner GHG Emitting Energy.
Green Banking and MRV 17 November 2010 Takashi Hongo Special Advisor and Head of Environment Finance Engineering Department Japan Bank for International.
1 Status of and Outlook for Coal Supply and Demand in the U.S. Imagine West Virginia Spring 2010 Board of Governors Meeting April 13, 2010 Scott Sitzer.
Energy  Humans use varied energy resources  Most came from solar energy  Decomposition of plants, animals buried underground form fossil fuels Which.
ISF:RESEARCH AND CONSULTANCY THINK. CHANGE. DO INSTITUTE FOR SUSTAINABLE FUTURES South African Energy Sector Jobs to Report for Greenpeace Africa.
NW Regional -- Washington n n Washington’s residents, businesses and industries spend $10 billion on their energy costs each year. n n Washington’s long-term.
CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.
Energy & Resources.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
1 Macroeconomic Impacts of EU Climate Policy in AIECE November 5, 2008 Olavi Rantala - Paavo Suni The Research Institute of the Finnish Economy.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development.
Min Hydro-Egypt 1 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX EGYPT : Damietta Barrage Small Hydropower Project Eng.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Regional Energy Integration Commission CIER CIER Argentine Committee CACIER Executive Secretary, CACIER Ester Beatriz Fandiño.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
ENDA TM / CDM-PDD1 Analysis of a CDM-PDD illustrated by the El Gallo project Second Regional Workshop on CD4CDM August 2004 Maputo, Mozambique Dr.
© OECD/IEA Mtoe Other renewables Hydro Nuclear Biomass Gas.
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
Energy Efficiency Potential in the Wisconsin Industrial Sector A Discussion With the Wisconsin Industrial Energy Group November 6, 2008.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Challenges and Opportunities for Addressing Global Climate Change February 2006.
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
 Cap and Trade Application: Global Warming 6. 2.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
© OECD/IEA Do we have the technology to secure energy supply and CO 2 neutrality? Insights from Energy Technology Perspectives 2010 Copenhagen,
Kenya’s INDC: Actions in the Energy Sector
Global Energy Problems and Counter Policies and Measures of Korea
RENEWABLE ENERGY POTENTIAL OF INDIA A REVIEW
Presentation transcript:

El Gallo Hydroelectricity Project PDD Analysis

Project Description Objectives of the project Generate renewable electricity using hydroelectric sources Stimulate commercialisation of renewable energy Broaden private sector experience in development and operation of hydroelectric schemes Meet increasing energy demand for economic growth Project description and proposed activities 30 MW power plant at existing irrigation dam Sale of electricity to industrial users and municipalities Technologies to be employed 30 MW, 47 m head, 77 m3/s flow, 86% efficiency Francis type hydraulic turbines 12 km transmission line

Project Description Project Developer Impulsora Nacional de Electricidad (INELEC) Project Sponsors Prototype Carbon Fund (PCF); Scudder Latin American Power Fund Greenhouse gases targeted CO2 Location of the projects Mexico, State of Guerrero, Cutzamala River Expected Schedule Project start date Project lifetime 2005 25 years

Social and Environmental Benefits Estimate of Greenhouse Gases abated (tons of CO2 equivalent) Annual: 70 kT CO2e Over crediting period: 1480 kT CO2e over 21 years Calculation based on: 120 GWh annual electric output of project 0.584 t CO2e/MWh grid emission rate (replaced by project) (120x1000) MWh x 0.584 t CO2e/MWh = 70 kT CO2e Replacement of mix of coal (58%), fuel oil and gas power generation Baseline scenario Dam built in 1978 for irrigation and electricity production; electricity component never implemented for lack of funds Potential electricity consumers include municipalities with low creditworthiness Difficulties in securing financing

Social and Environmental Benefits Specific global & local environmental benefits greenhouse gas emission reductions no new dam construction, insignificant negative environmental impacts (the construction of the reservoir had already depleted fish stocks) clearing of vegetation for line construction Socio-economic aspects payment for right of way for construction of transmission lines to landowners impact on irrigation of downstream farmers limited by maximum water usage agreement by the dam the dam will ensure a minimum water flow

Finance Total project cost estimates US$ 45 million Sources of financing No public funding

Baseline Methodology Prohibitive barriers to securing financing: high interest rates of Mexican financial markets perceived technology risk (El Gallo is a small hydro by a private developer) transaction and development costs of small project Registration as a CDM project with World Bank backing would overcome those barriers (credibility and creditworthiness) Sale of CO2 is more secured than that of electricity to customers with low creditworthiness (US$ 270,000 per year out of US $7.7 million per year)

Baseline Emission Rates Displacement of electricity that would otherwise be provided by the expansion of the grid Emissions from a technology that represents an economically attractive course of action, taking into account investment barriers Baseline emissions are the average of the approximate operating margin and the build margin (as in the methodology defined for small-scale projects)

Baseline Emission Rates Baseline emissions are the average of the approximate operating margin and the build margin (as in the methodology defined for small-scale projects) operating margin is the weighted average emissions of all generating sources serving the system, excluding hydro, geothermal, wind, low-cost biomass, nuclear and solar build margin is the weighted average emissions of recent capacity additions to the system, defined as the lower of most recent 20% of plants built or the 5 most recent plants.

Project Boundary and Leakage Geographic and system boundary of electric grid: power projects that feed into the Mexican grid can be established almost anywhere in the country. Potential leakages mainly related to plant construction, fuel handling and land inundation are not considered by the baseline methodology.

Expert Reviewers Comments The methodology is valid as the project is a relatively minor addition to the grid. The PDD should consider undertaking an analysis showing that the project is not a least cost option and therefore not part of the baseline scenario. Some barriers identified in the PDD are debatable: perceived technology risk: risk is low as the technology is widely known in Latin America. Meth Panel Recommendation: approval with minor changes

Public Comments The PDD uses the small-scale baseline methodology, yet its capacity exceeds 15MW. Most developing countries face similar difficulties in securing financing for their hydropower projects. Approving the PDD would make any kind of hydropower project, including large ones in China and India, eligible for CDM.