MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program.

Slides:



Advertisements
Similar presentations
September 26, 2001 Public Workshop Orange County MS4 Permit, Urban Storm Water Runoff Management Program Order No (NPDES No. CAS ) Mark Smythe.
Advertisements

Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
Los Angeles County MS4 Permit Reissuance: New Directions & Strategy Presented by LA Regional Water Quality Control Board Southern California Water Dialogue.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Santa Ana Region Stormwater Permit TMDL Requirements and Costs
June 1, 2001 Public Workshop Orange County MS4 Permit, Urban Storm Water Runoff Management Program Order No (NPDES No. CAS ) Mark Smythe Chief,
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Spokane River Forum Conference March 26,  About 1/3 of City  130 outfalls.
City of El Monte Draft Watershed Management Program (WMP) Ed Suher, P.G. CASC Engineering and Consulting October 9, 2014.
Where are the regulations going? Dan Cloak Environmental Consulting May 23, 2011.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
Environmental Reform: Stormwater Quality and Ventura County Anna Lantin, PE, CPESC, CPSWQ RBF Consulting.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
The purpose of the San Dieguito Union High School District’s stormwater management plan is to comply with applicable stormwater regulations, educate.
Low Impact Development Guidebook Kent Gylfe
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
Item #17: Board Workshop Alamitos Bay and Los Cerritos Channel Watershed Management Area Watershed Management Program Approach October 9, 2014.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Design Manual Update City of Tacoma Public Meeting April 10, 2014 Jim Parvey, P.E., LEED AP City of Tacoma Senior Principal Engineer.
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
New Boise Area MS4 Permit Boise City Council Budget Workshop August 15, 2012.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Santa Margarita Region MS4 Permit – Pyrethroids Evaluation Jason E. Uhley, P.E. Riverside County Flood Control & Water Conservation District.
What’s New in Stormwater Requirements for Development Projects? Jill Bicknell, P.E. EOA, Inc. New Development Workshop May 22, 2013.
Overview of Montana’s Stormwater Regulatory Program.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Countywide Model SUSMP July 17, Topics SUSMP Timeline Goals Approach to Compliance NPDES Permit Requirements NPDES Permit Requirements Model SUSMP.
City Council Meeting January 17, NPDES Permit Background 11/10/2010 – New Permit Adopted by RWQCB 12/10/2010 – Appeal to State Board (in Abeyance)
DRAFT PHASE II STORMWATER PERMIT New Requirements Terri Fashing - MCSTOPPP Manager Wendy Atkins – City of Sonoma Stormwater Coordinator With assistance.
Phase II National Storm Water Regulations What’s in it for you?
Stormwater Regulations and Impacts on Industry Integrated Regional Water Management Regional Advisory Committee (RAC) Meeting #45 Ed Othmer PE, CPESC,
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
Municipal Stormwater Permit Overview of Order R Issued by: California Regional Water Quality Control Board, San Diego Region NPDES No. CAS
Small MS4 General Permit Renewal 1 Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office.
picture Renee Purdy, Environmental Program Manager Los Angeles Regional Water Quality Control Board Renee Purdy, Environmental Program Manager Los Angeles.
October 9, 2014 Watershed Management Program for Santa Monica Bay Jurisdictional Group 7 within the City of Los Angeles.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
By Will Holoman. University of North Carolina – Wilmington - B.A. in Environmental Science – Marine Science Emphasis University of Utah - B.S. in Civil.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
Sustainable Vineyard Practices Replanting Strategies & Economics December 13, 2012 Conditional Waiver of Waste Discharge Requirements Vineyards in Napa.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Total Maximum Daily Load Program
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Sacramento County Stormwater Quality Program
Stormwater Control Transfer Program Overview January 31, 2018
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
Green Infrastructure Planning Update
MS4 OVERVIEW 2015.
Illicit Discharge Detection & Elimination (IDDE) Plan
Sacramento County Stormwater Quality Program
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Agenda Status on Permit Implementation Activities: WQIP Jurisdictional Runoff Management Plan BMP Design Manual Optional Watershed Area Management Analysis Timelines & Opportunities for Engagement WPO & ERP IGP

New Requirements WQIP WMAA BMP Manual JRMP Water Quality Improvement Plan Jurisdictional Runoff Management Plan Best Management Plan Manual Watershed Management Area Analysis

Engaging Stakeholders: Water Quality Improvement Plans (WQIP) Due June 2015 County Lead (8 total)

WQIP Goals & Strategies Example goal: Eliminate ‘x’ % of persistently flowing outfalls Example Strategy: Develop a residential outreach program to help reduce or eliminate flows attributed to over- irrigation

Jurisdiction Runoff Management Plan Programs & Strategies Reduce the discharge of pollutants from storm drains Examples: Street Sweeping Education & Outreach Municipal BMPs Residential Outreach

BMP Design Manual Requirements for standard projects & Priority Development Projects (PDPs) Replaces SUSMP Joint Effort - San Diego Copermittees Public Workshops June 10, Draft BMP Design Manual 10/24/2014 Co- Permittee comments due 11/18/2014 Draft Manual Public Review February 2015 Final Manual June 2015 Local Adoption Dec 2015

Optional Alternative Compliance Optional Watershed Management Area Analysis (WMAA) Regional Mapping Effort Mapping (Soils, Channels, Slopes) HMP Exemptions Opportunities for Alternative Compliance Projects Developed Template for Watersheds

To Use Offsite Alternative Compliance... Must have completed the WMAA Jurisdictional Alternative Compliance Program Determine greater water quality benefit Program(s) may allow implementation or funding via in-lieu fee Voluntary agreement between jurisdiction/developer Built within 4 years of first PDP occupancy Section E.3.c.(1)(b)., (1)(a). and (3).

Special Studies: Wet & Dry weather San Diego River Dry-Weather Bacteria Source Tracking: Determine Sources of Bacteria During dry weather Using Genetic Tracking Technology Pilot Surfer Wet Weather Epidemiology: Links Between Levels of Bacteria & Illness in Surfers in Winter Bacteria Reference Watershed: Determine Naturally-Occurring Levels of Bacteria in Undisturbed Watersheds & Beaches Year-Round

Deliverables Timeline *Reopener pending determination of RB EO Gibson 6/27/15 WQIPs due 6/27/15 JRMP update due 6/27/15 WP ordinance update due 12/27/15 BMP Design Manual due Implementation Bacteria TMDL Reopener* 2016 JanAprJulOctJanAprJulOctJanAprJulOctJanAprJulOctJanAprJulOctJanAprJulOct

Permit Engagement Opportunities Orange County enrollment Early 2015 Riverside County enrollment Early 2016 Bacteria TMDL reopener Late 2016

Watershed Protection Ordinance (WPO) Update Schedule WPO Workgroup meetings (4/7/14; 11/6/14) County Counsel is reviewing the WPO draft comments with WPP management. December Commence Stakeholder outreach. January 2015 – Revise WPO per stakeholder comments. February/March 2015 – File Public Notice with the Clerk of the Board for the Board Letter.

Watershed Protection Ordinance (WPO) Update Schedule April 2015 – First reading of the ordinance at the Board of Supervisors. May 2015 – Second reading and adoption of the WPO at the Board of Supervisors. June 2015 – WPO becomes effective.

Enforcement Response Plan (ERP) Required components from the NPDES permit: Illicit Discharge Detection and Elimination Enforcement Development Planning Enforcement Construction Management Enforcement Existing Development Enforcement

County Unincorporated Areas Industrial ConcentrationsBordering areas Fallbrook Vista Ramona Lakeside Alpine Rancho San Diego Spring Valley San Marcos Escondido El Cajon

Industrial Inventory Total: ~180 Facilities Filers (NOI on file): 55% (Notice of Intent) Non-filers: 12% NoNAs: 33% (Notice of Non-Applicability)

County Strategy Comply with MS4 Permit Ensure industrial operators are in compliance with MS4 Permit Assist operators, as feasible, to prepare for the implementation of the re-issued Industrial General Permit (July 2015) Provide resource contact information to operators

County of San Diego Watershed Protection Program

High Priority Water Quality Conditions

BMP Design Manual (previously SUSMP) Residential > 10 units 10,000 sf Retain Biofilter Flow through with offsite 1.More “Major” development projects 2.Retention hierarchy 3.Offsite Alternative Compliance option 4.Critical Course Sediment yield area protection 5.Other: Green Streets option for redevelopment Exemption of alleys, bike lanes, trails if designed with LID or hydraulically disconnected Pre-development instead of pre-project

Green Streets Bigger BMPs Green Streets guidelines allowed for redevelopment / retrofitting existing roads without hard sizing requirements 2013 MS4 Permit Green Street Features Street Trees Permeable Pavements Bioretention Swales Reduced Impervious Width Conventional StreetGreen Street

Green Streets Life Cycle Cost Analysis: Average 35% Less Over a 20-yr Life Cycle