11 May. 2006S. Childress – AB Seminar1 The NuMI Beam : A First Year of Operation Sam Childress, Fermilab Successes & Challenges.

Slides:



Advertisements
Similar presentations
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
Advertisements

NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
NuMI DOE Review May 25, 2004 Commissioning Page 1 NuMI Commissioning Overview CD-4 Goals Planning Pre-commissioning activities Commissioning Summary.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Instrumentation Specifications July 26, 2001 S. Childress Page 1 NuMI Specifications for NuMI Primary Beam Instrumentation.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
1 Some Radiation Protection Challenges: Deep Underground vs. Shallow Beams Sam Childress - Fermilab 9 Nov. 2012CERN NBI
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
NuMI NBI2006 September 6, 2006 NuMI Target Experience Jim Hylen / FNAL Page 1 Experience with the NuMI Target Max. Proton/spill Max. Beam Power Integrated.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
F Overview of the SuperNuMI Plan A. Marchionni, Fermilab AD/MID Accelerator Advisory Committee, May 10-12, 2006.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Check lists to mouse clicks Automation Session : WAO The Fermi National Accelerator Laboratory is a U.S. Department of Energy (DOE) research laboratory,
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
NUMI NuMI Magnet Power Supply System WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
NuMI Primary BooNE / NuMI S. Childress (FNAL) Primary Beams for Mini-BooNE & NuMI 18 March, 2002 Mini-BooNE inputs from Craig Moore and Al Russell Includes.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
CNGS Operation Summary Edda Gschwendtner, CERN. Outline Introduction CNGS Performance Highlights since last NBI 2010 in Japan Issues Summary 2E. Gschwendtner,
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 1 NuMI Target Status, Testing, Support Module At NBI’02: Beam test results of Medium.
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
BooNE / NuMI Rad. Protection NBI 2002 S. Childress (FNAL) Radiation Protection for Mini-BooNE & NuMI 18 March, 2002 Mini-BooNE inputs from Peter Kasper.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
NuMI PS Specs June 2001 S. Childress Page 1 NuMI NuMI requirements are for a very large fraction of the available Main Injector intensity over a period.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
1 Sam Childress. 2 S. Childress NNN11 Existing Fermilab Neutrino Beams 120 GeV NuMI 8 GeV BNB 2 J. Strait.
Primary Design Parameters July 13,2001 S. Childress Page 1 NuMI Besides design specifications driven by physics and Main Injector beam parameters, significant.
Status of HESR 18th March Gießen Dieter Prasuhn.
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
News and brief overview of Beamline plans for the next few months
Presentation transcript:

11 May. 2006S. Childress – AB Seminar1 The NuMI Beam : A First Year of Operation Sam Childress, Fermilab Successes & Challenges

11 May. 2006S. Childress – AB Seminar2 Presentation Outline  NuMI / MINOS Overview  Beam System Components  Beam Commissioning & Transition to Operations  NuMI Beam Performance: Successes and Challenges  Summary A previous AB seminar at an earlier stage of NuMI beam operation was given 29 Sept. 2005

11 May. 2006S. Childress – AB Seminar3 at the Main Injector NuMI: Neutrinos at the Main Injector Fermilab to Soudan, Minnesota

11 May. 2006S. Childress – AB Seminar4 NuMI: ’s at the Main Injector (Focus of this talk) MINOS: Main Injector Neutrino Oscillation Search A neutrino beam from Fermilab to northern Minnesota  120 GeV protons from the Main Injector (400 kWatts)  Production of a high power neutrino beam  On-axis over 735 km to Soudan mine (MINOS experiment) A large near hall at ~ 1 km from the target  MINOS near detector (980 Tons) A deep underground hall at Soudan, Minnesota  MINOS far detector (5400 Tons)

11 May. 2006S. Childress – AB Seminar5 Key NuMI Project Dates  Initiated in late 1998  Facility construction completed in Fall 2003  Technical component installation from 2003 to early 2005 Extraction & primary beam components in Main Injector interlock area installed during scheduled machine shutdown times in 2003 & Extraction & primary beam components in Main Injector interlock area installed during scheduled machine shutdown times in 2003 &  Beam commissioning starts Dec  Completion of project goals Jan DOE Approval for Operation DOE Approval for Operation

11 May. 2006S. Childress – AB Seminar6 Elevation View of the NuMI/MINOS Project on Fermilab Site 675 Meter Decay Pipe

11 May. 2006S. Childress – AB Seminar7 Key NuMI Beam System Features

11 May. 2006S. Childress – AB Seminar8 Main Injector & NuMI Main Injector is a rapid cycling accelerator at 120 GeV  from 8 to 120 GeV/c in ~ 1.5 s up to 6 proton batches (~ 5  p/batch) are successively injected from Booster into Main Injector Main Injector in parallel provides protons for the Collider program (anti-proton stacking )and transfers to the Tevatron) and NuMI total beam intensity ~ 3  ppp, cycle length 2 s Mixed mode: NuMI & Pbar stacking  two single turn extractions within ~ 1 ms:  1 batch to the anti-proton target, 5 batches to NuMI  Normally the batch extracted to the Pbar target comes from the merging of two Booster batches (“slip-stacking”) (up to 0.8  ppp)  the default mode of operation is mixed-mode with slip-stacking NuMI only  up to 6 Booster batches extracted to NuMI in ~ 10  s

11 May. 2006S. Childress – AB Seminar9 Extraction from Main Injector Kickers & Septa

Primary Proton Line Total length ~ 350 m MI tunnel bringing the protons to the correct pitch of 58 mrad bending down by 156 mrad final focus trim magnets carrier tunnel ~70 m beam pipe 12” Ø Main Injector NuMI line Recycler

11 May. 2006S. Childress – AB Seminar11 Production for NuMI Production for NuMI

11 May. 2006S. Childress – AB Seminar12 Reasonable Variable Energy Beam by Moving Target distance from Horn 1 “Semi-beams” Full Beams Just moving LE target - remotely Move Horn 2

11 May. 2006S. Childress – AB Seminar13 Graphite Target Graphite Fin Core 2 interaction lengths Water cooling tube provides mechanical support Low Energy Target fits in horn without touching

11 May. 2006S. Childress – AB Seminar14 Horn System – 2 horns (shown in work cell, hanging from support module)

11 May. 2006S. Childress – AB Seminar15 Work Cell Mount/Dismount Components Railing Module Lead-glass window Horn Remote lifting table Concrete walls Connections are all done through the module by person on top of work cell 3 m

11 May. 2006S. Childress – AB Seminar16 Hadron Absorber Water cooled Aluminum core, followed by Steel Steel & concrete shielding

11 May. 2006S. Childress – AB Seminar17 Near Hall and Detectors MINER A MINOS Near DetectorHall Size: 46  9x9 m

11 May. 2006S. Childress – AB Seminar18 Beam Commissioning & Transition to Operations

11 May. 2006S. Childress – AB Seminar19 Pre-Beam Commissioning  We planned to – and did – establish readiness of systems for primary beam prior to first extracted beam pulses.  These include: Magnet function & connection polarities Magnet function & connection polarities Power supply function / ramp parameters Power supply function / ramp parameters Kicker & power supply function Kicker & power supply function Recycler shielding from EPB fringe fields Recycler shielding from EPB fringe fields Instrumentation function and readout polarities Instrumentation function and readout polarities Beam Permit System [ establish & test 1 st limits for all devices] Beam Permit System [ establish & test 1 st limits for all devices] Control timing Control timing Verify documentation capability – Beam profiles, positions, intensity, beam loss,etc. Verify documentation capability – Beam profiles, positions, intensity, beam loss,etc. Main Injector beam suitable for extraction Main Injector beam suitable for extraction

11 May. 2006S. Childress – AB Seminar20 NuMI Initial Beam Commissioning  December Commissioning the primary proton beam  target out, horns OFF  small number of low intensity (1 batch with 3  protons) pulses carefully planned  beam extracted out of Main Injector on the 1 st pulse  beam centered on the Hadron Absorber, 725 m away from the target, in 10 pulses  all instrumentation worked on the first pulse  January Commissioning of the neutrino beam  target at z=-1 m from nominal  pseudo-medium energy beam, horns ON  MI operating on a dedicated NuMI cycle, at 1 cycle/minute, with a single batch of 2.6  protons, few pulses up to 4  protons  final tuning of the proton line  neutrino interactions observed in Near Detector  NuMI project met DoE CD4 goal (project completion)  February High intensity beam in the NuMI line  MI operating on a dedicated NuMI cycle in multi-batch mode  with 6 batches, we achieved a maximum intensity of 2.5  p/cycle

11 May. 2006S. Childress – AB Seminar21 Beam Extraction in 10 Pulses achieved to hadron absorber at 1 km distance Profile monitor output along the beamline (few pulses later) (from the extraction up to the target - ~ 400 m distance) December 3-4, 2004

11 May. 2006S. Childress – AB Seminar22 Most Significant Commissioning Challenge  Interleaving beam commissioning schedule with delayed completion of target hall forced air chiller system.  Priority to understand NuMI proton beam function while Main Injector and Collider still in start-up mode after lengthy shutdown. Accomplish by discrete steps starting with very low intensity, and adding new capabilities as installation readiness completed. Accomplish by discrete steps starting with very low intensity, and adding new capabilities as installation readiness completed. 1 st commissioning weekend was only 1.2E13 protons total with target out1 st commissioning weekend was only 1.2E13 protons total with target out 3 rd commissioning period (10 weeks later) to 2.5E13 per pulse3 rd commissioning period (10 weeks later) to 2.5E13 per pulse Many thanks to Malika Meddahi for working with us during NuMI commissioning, and with our schedule uncertainties. Many thanks to Malika Meddahi for working with us during NuMI commissioning, and with our schedule uncertainties.

11 May. 2006S. Childress – AB Seminar23 Beam Commissioning & Start up for Data Taking December 3-4 First beam extracted Proton beam-line setup January First ever beam ! Observation of neutrino interactions in Near detector February High intensity beam in Main Injector. NuMI only cycle, March 16 Start of MINOS operation Steady mixed-mode running in Main Injector March 23 Target failure 2.5  ppp

11 May. 2006S. Childress – AB Seminar24 Transition to Operations  Transition to Operations – VERY smooth VERY smooth Restarted after target checkout in late AprilRestarted after target checkout in late April Main Control Room Operators take control of running NuMI beamMain Control Room Operators take control of running NuMI beam (12 May) (12 May) Initiate NuMI running during Recycler shot setup (18 May)Initiate NuMI running during Recycler shot setup (18 May) Initiate NuMI running during TeV shot setupInitiate NuMI running during TeV shot setup (22 June) (22 June) We needed to be a “low overhead” beam to Operators to have these running modes We needed to be a “low overhead” beam to Operators to have these running modes  Keys to NuMI Proton beam operation – Comprehensive beam permit system : ~ 250 parameters monitored Open extraction/primary beam apertures – capability of accepting range of extracted beam conditions Superb beam loss controlSuperb beam loss control Good beam transport stability Autotune beam position control No manual control of NuMI beam during operationNo manual control of NuMI beam during operation

11 May. 2006S. Childress – AB Seminar25 NuMI Beam Performance

11 May. 2006S. Childress – AB Seminar26 NuMI 120 GeV Primary Beam  Key specifications are: Very low beam loss <1E-5 fractional loss for large regions of transport. (unshielded intense beam passing thru ground water reservoir) Very low beam loss <1E-5 fractional loss for large regions of transport. (unshielded intense beam passing thru ground water reservoir) Maintain position on target to 0.25 mm rms & angle to < 60 µrad. Maintain position on target to 0.25 mm rms & angle to < 60 µrad. Intense 400 kWatt beam => tight control over residual activation Intense 400 kWatt beam => tight control over residual activation  Overall performance: A strong success. A strong success.

11 May. 2006S. Childress – AB Seminar27 Kicker System Requirements tightened specs during design process Early Requirement Final Requirement Integrated Field (120 GeV protons) 2.2 kG m (550 µrad) 3.6 kG m (900 µrad) Number of Magnets 23 Field Flatness ± 1% < ± 1 % (Best Effort) Repeatability (over 8 hours) ± 1% < ± 1/2% (Best Effort) Field Rise Time 1.52 µs Flat top length 9.68 µs for 6 Batches, 8.08 µs for 5 Batches Magnetic Aperture 1.98 m x 10.7 cm x 5.2 cm (each magnet) C.Jensen lead enginer

11 May. 2006S. Childress – AB Seminar28 Primary Beam Optics Specifications: fractional beam losses below (Groundwater protection, residual activation) Max. dispersion point  35 mm aperture 95% beam size  7 mm

11 May. 2006S. Childress – AB Seminar29

11 May. 2006S. Childress – AB Seminar30 NuMI Beam Permit System coordinated by R. Ducar  Dedicated hardware based on Tevatron fast abort system  Permit to fire NuMI extraction kicker is given prior to each beam pulse, based on good status from a comprehensive set of monitoring inputs ~ 250 inputs to NuMI BPS ~ 250 inputs to NuMI BPS  Inputs include Main Injector beam quality prior to extraction, NuMI power supply status, target station and absorber status, beam loss and position for previous pulse  NuMI BPS was prototyped with MiniBooNE, with excellent results  Very similar in function to LHC,CNGS beam interlock system With the very intense NuMI beam, perhaps our most important operational tool.

11 May. 2006S. Childress – AB Seminar31 Autotune Primary Beam Position Control  Automatic adjustment of correctors using BPM positions to maintain primary transport & targeting positions  Commissioned at initial turn on for correctors  Vernier control for targeting. Initiate tuning when positions microns from nominal at target  VERY robust for a given extraction mode. Refining for alternating (interleaved) extraction modes Autotune Beam Control Monitor

11 May. 2006S. Childress – AB Seminar32 Beam Performance plots (most plots provided by M. Bishai, BNL)  Kicker Stability  Shown in plots for full month of Jan.’06 2.0E19 POT this month 2.0E19 POT this month 0.98 E6 pulses 0.98 E6 pulses  Beam position stability NuMI only, mixed and interleaved modes NuMI only, mixed and interleaved modes  Pretarget beam widths  Beam loss vs extraction mode  Intensity, Beam Power & Downtimes for the 1 st NuMI Year

11 May. 2006S. Childress – AB Seminar33 Measurement of Kicker Stability with Beam  Measured Change in Position  BPM Accuracy of ~10 µm  Total Displacement of 43 mm

11 May. 2006S. Childress – AB Seminar34 Jan. ‘06 Beam Stability on Target NuMI Only HorVer Note greatly expanded scale. Horizontal sees kicker stability effects. Error on mean batch position < 60 microns for all batches (160 µ for batch 1)

11 May. 2006S. Childress – AB Seminar35 Jan. ‘06 Beam Stability on Target Mixed Mode  Note bimodal effect of Pbar kicker on 1 st NuMI batch [Either even or odd # turns between extractions]. Error on mean batch position increased to 90 µ. (Many batch 1 points > 250 µ spec.) Hor Ver

11 May. 2006S. Childress – AB Seminar36 Beam Stability on Target Interleaved Mode Jan 06 Nov.05 Some worsening of momentum difference between extraction modes. Are preparing separate Autotune corrector files for each.

11 May. 2006S. Childress – AB Seminar37 Jan ’06 Pretarget Beam Widths

11 May. 2006S. Childress – AB Seminar38 Jan ’06 Average per Pulse Primary Beam Loss – NuMI Only ~5E-6 loss ExtractionMax.DispersionProfile Monitor

11 May. 2006S. Childress – AB Seminar39 Jan ’06 Average per Pulse Primary Beam Loss – Mixed Mode ~5E-6 loss Significant improvements in earlier loss from Pbar slip stacked batch

11 May. 2006S. Childress – AB Seminar40 Progression to Increased Beam Power  Keys to improving beam power for NuMI have included: Continuing enhancement in accelerator intensity capability and control of beam loss – especially for pbar slip stacking process Continuing enhancement in accelerator intensity capability and control of beam loss – especially for pbar slip stacking process NuMi only operation has been very smooth from the beginning, but this is not the normal operational modeNuMi only operation has been very smooth from the beginning, but this is not the normal operational mode Steady improvement in number of beam cycles available for NuMI Steady improvement in number of beam cycles available for NuMI Running during Recycler and Tevatron shot transfersRunning during Recycler and Tevatron shot transfers Adapting operational modes to interleave extra NuMI cycles as pbar stacking cycle times increase (due to stacktail core cooling limitations as stack increases)Adapting operational modes to interleave extra NuMI cycles as pbar stacking cycle times increase (due to stacktail core cooling limitations as stack increases) Targeting highest possible intensity in NuMI only mode Targeting highest possible intensity in NuMI only mode Since 20 Sep.’05 when spare NuMI target was readySince 20 Sep.’05 when spare NuMI target was ready

11 May. 2006S. Childress – AB Seminar41 Special Test Normalized Neutrino Rates vs Time B. Rebel Plot Special Tests

11 May. 2006S. Childress – AB Seminar42 Near Detector CC Energy Spectra: Batch 1 vs Other Batches T. Osiecki Plot

11 May. 2006S. Childress – AB Seminar43 NuMI Beam Year Protons, Beam Power, Downtimes

11 May. 2006S. Childress – AB Seminar44 Target Hall Systems

11 May. 2006S. Childress – AB Seminar45 NuMI Target Hall Systems  Some VERY challenging one of a kind designs  Graphite Target Target integrity for intense fast spill beam Target integrity for intense fast spill beam Low energy beam design precludes rigid support structure Low energy beam design precludes rigid support structure  Horn & Reflector Design for > 10 million pulses at 200 kAmps Design for > 10 million pulses at 200 kAmps Low mass to minimize secondary beam absorption Low mass to minimize secondary beam absorption Intense radiation environment, moisture => corrosive effects Intense radiation environment, moisture => corrosive effects  Essential need for spares, with long lead times Very difficult to repair relatively minor problems due to radiation Very difficult to repair relatively minor problems due to radiation  240 kW forced air target chase cooling system Design constraints not as fundamental, but many challenges Design constraints not as fundamental, but many challenges

11 May. 2006S. Childress – AB Seminar46 System Problems and Repairs  Three significant component failures: Target cooling line leak - Mar.’05 Target cooling line leak - Mar.’05 Horn 2 (reflector) hard ground fault – Oct. ’05 Horn 2 (reflector) hard ground fault – Oct. ’05 Horn 2 cooling water flow return problem – Jan.-Feb.’06 Horn 2 cooling water flow return problem – Jan.-Feb.’06  System designs have looked toward hot component replacement, not repair.  Success here in addressing all three problems, and continue to use these components!! Significant motivation from spare readiness Significant motivation from spare readiness A VERY sustained effort by J. Hylen plus engineering teams A VERY sustained effort by J. Hylen plus engineering teams

11 May. 2006S. Childress – AB Seminar47 Target Scan using Hadron Monitor provides verification of major change – Mar. ‘05 Scan after water leak Normal target scan

11 May. 2006S. Childress – AB Seminar48 Target Diagnosis Period  No NuMI beam for ~ 1 month while work to diagnose target cooling water leak  Target removed from beam chase to hot cell Water leak has closed after moving target Water leak has closed after moving target Many diagnostic steps – no firm answer for cause of water leak Many diagnostic steps – no firm answer for cause of water leak Modifications made to fill target vacuum vessel with He gas (small overpressure) Modifications made to fill target vacuum vessel with He gas (small overpressure) Water removed by combination of He pressure and vacuum pumping Water removed by combination of He pressure and vacuum pumping  Replace target in beam chase in preparation for operation using He backpressure to hold water out.  Leak reopens after 1 st hours of beam again, but He backpressure technique has worked very well – for the duration of the run.

11 May. 2006S. Childress – AB Seminar49 Horn 2 Ground Fault - Oct.’05 loose support foot on horn Owl shift Sat. Oct. 1, hard ground fault of 1 ohm. -when Horn 2 moved to work cell ground fault cleared -foot left behind in chase, nut had vibrated off -scorch marks seen under foot Moved old foot, installed new foot Wed Oct. 12, horn reinstalled, Horn 2 before beam 4 cm clearance foot to floor

11 May. 2006S. Childress – AB Seminar50 Swage-lock fitting disconnect here Problem: hole in suction line at ceramic electrical insulator drawing in air, reducing water suction Repair: replace this section Cut 5 cm stainless pipe here Water collection tank Symptom: Suction of water back from Horn 2 could not keep up with water spray rate to the horn – water built up in the horn Horn 2 (Reflector) Repair Apr. ‘06

11 May. 2006S. Childress – AB Seminar51 Challenge for Repair was the Residual Radiation Field  0.3 – 0.5 Sv/hr I chase around horn before component removal  0.08 Sv/hr on contact after horn removal  Repair accomplished 18 Apr. Checks good with no air or water leak Checks good with no air or water leak Hi-Pot acceptable Hi-Pot acceptable Preparing for horn pulsing vibration test Preparing for horn pulsing vibration test  The ALARA radiation plan estimated about 2.8 mSv to the repair crew including 25% for contingencies. (~ 10 µ Sv per second )  The job was done with a total dose of 2.4 mSv. With an 8 person repair crew plus radiation safety supervision. Extensive prior rehearsal for all steps. Extensive prior rehearsal for all steps.

11 May. 2006S. Childress – AB Seminar52 Repaired Horn Returning to Target Chase Repaired line

11 May. 2006S. Childress – AB Seminar53 Summary  A very eventful first year for NuMI beam operation.  Strong successes in commissioning for all systems.  Excellent Main injector and NuMI proton beam performance. Significant ongoing efforts toward providing more POT Significant ongoing efforts toward providing more POT  A challenging and ultimately very successful first year with target hall systems Our most important success was accomplishing system repairs Our most important success was accomplishing system repairs After 7.8 Million pulses, we continue with all original components After 7.8 Million pulses, we continue with all original components  Beam startup again after 3 month shutdown in June ‘06

11 May. 2006S. Childress – AB Seminar54 Upcoming MINOS EP Seminar at CERN  5 Sept – M. Kordosky Report for the full MINOS data set currently collected Report for the full MINOS data set currently collected In conjunction with the NBI2006 Workshop In conjunction with the NBI2006 Workshop March 2006 result with 0.93E 20 POT