Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.

Slides:



Advertisements
Similar presentations
Injection Session – Close-out Workshop on Accelerator R&D for USRs Working Group J.H. Chen (IHEP), O. Dressler (Helmholtz ZB), R. Hettel (SLAC), Y. Jiao.
Advertisements

Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
1 Experience at ATF To get a low emittance beam Junji Urakawa KEK Circumference: m Arc Cell Type: FOBO Number of Arc Cells: 36 Energy: GeV.
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Status of ATF Fast Kicker Experiment
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Injection/extraction R&D Summary S. Guiducci (INFN), Thomas Mattison (UBC) KEK - ILCDR07, Dec 207.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
Non-EC R&D KEK Junji Urakawa at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Wakefield effect in ATF2 Kiyoshi Kubo
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
ATF2 Status N.Terunuma, KEK
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Junji Urakawa (KEK) for ATF International Collaboration
Bunch Separation with RF Deflectors
Damping Ring Kicker Tests at AØ
Strip-line Kicker R&D at KEK-ATF
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
Junji Urakawa ( for collaborators ) March KEK at LNF
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Presentation transcript:

Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5

Beam Position Monitors 2/27

DR BPM Upgrade for 2 pm emittance The original read-out system designed for the single path position measurement has a 10  m resolution. Upgraded BPM readout system: FNAL Utilize analog down-conversion and digital signal processing techniques automatic gain-correction New functions for optics analysis Broadband turn-by-turn mode (< 10 µm resolution) Injection 1,000 turns Extraction 64 turns Narrowband mode with high resolution (~ 100 nm range) 160 ms, 500,000 turns after injection Further investigation for the system completion is continued. LO & CAN-bus Distribution New Timing Module & Custom Digitizers New Downmix & Calibration 3/27

ATF2 Cavity BPM system IP BPM system (BPM + Ref) Cavity 1 unit Target : 2 nm Aperture: 6 mm(V) S-band BPM system BPM cavity: 4 units Ref. cavity: 1 unit Target : 100 nm Aperture:  40 mm C-band BPM system BPM cavity: 34 units Reference cavity: 4 units Target resolution: 100 nm Aperture:  20 mm KNU / PAL / KEK / RHUL / SLAC 4/27

Present Status of the ATF2 Cavity BPMs S-band BPM Resolution ~ 1  m Jitter subtracted calibrations Cavity frequency correction Amplifiers were not sufficient. IP-BPMs Just installed to assist the small beam size study. Not yet well calibrated! Further investigations are continued. BPM number C-band BPM 20 dB attenuation, most of C-band BPMs to widen the dynamic range Resolutions: with 20dB att. ~ 200 nm w/o 20dB att. ~ 50 nm (well centered beam w/o saturation  27 nm) By S. Boogert (RHUL) 5/27

Fast Kicker R&D at ATF The fast kicker R&D has been one of the missions at ATF for the ILC technology development. The bunch separation in the ILC damping ring is 6 ns for a nominal operation (RDR, SB2009), 3 ns for a possible luminosity upgrade. ILC fast kicker: should meet these requirements, 0.6 mrad ~20 units 1.5 MHz, +-10 kV, Stability <0.1%, Multi-units of strip-line kicker +10kV -10kV 6/27

Fast Kicker R&D at ATF 7 Pulser performance study (2005~2009) It has been done here by measuring the beam oscillation. Demonstration of a Beam Extraction (2009~) Swap the conventional pulse kicker with the fast kicker but only in this R&D period

Requirement for ATF beam extraction The fast kicker R&D for a beam extraction had been performed by exchanging the conventional pulse magnet. It was done only when the study was scheduled because its reliability for other R&Ds was not known well. The beam extraction system of ATF DR has to have a beam kick angle of 5 mrad. It is difficult to realize by a fast kicker itself under the limited space obtained by replacing the conventional pulse magnet. Therefore, we needed followings. pulsed orbit bump in DR as much as possible when a beam is extracted, aux. septum magnet before the present one, finally, optimize a gap between two electrodes but as large as possible. 8/27

2015/12/69 Beam Extraction Orbit using Strip-line Kicker, Aux. septum & Pulse bump To existing septum magnets Bump orbit Stored beam Local Bump Extracted beam 9/27

(FID Co. Ltd) 10/27

Kicker pulse (10kV) Kicker field Rise time 1.5 ns Rise time 5 ns 11/27

12/27

Fine delay control window of the kicker pulse Trigger system for fast kicker Beam extraction signal

Single-bunch beam extraction by a fast kicker 14

15 1 st Beam Extraction from DR to ATF Oct. 22. Beam profile at MS1X screen monitor, which is located at the downstream of the septum magnets. 15/27

16 Jitter 1.05e-6/3e-3=3.5e-4Jitter 2.24e-6/3e-3=7.4e-4 Kick angle jitter of a fast kicker for single bunch Fast Kicker ATF2 Cavity BPMs Angle (urad) 2010/Oct 2010/Mar Stability of the fast kicker was evaluated by using R12 and beam positions measured with the 100 nm-resolution BPMs. 16/27

Multi-bunch beam extraction by a fast kicker 17

2015/12/618 Multi-bunch beam extraction by the Fast kicker in DR: 3 Trains, 9(max 10) bunches/train with 5.6 nsec spacing Extracted: 27(max 30) bunches with 308 ns spacing bunch-by-bunch profile follows that in the DR. bunches were extracted from the last bunch to the first bunch. 3 trains in DR Intensity of extracted bunches 18/27

MB-Orbit and jitter measurement Pulses Kick Angle variation for pulsesStability of each pulses The jitter ratio for the kick angle was distributed from 1x10 -3 to 4x10 -3 for each pulse. This value is larger than the single bunch jitter. 19/27

Profile of the kick field and the jitter Plot shows the beam position at MQM16FF BPM, when scanned the kicker pulse timing. There is no flattop of the kick field. The jitter increased at the both side of the peak. To make stable beam kick, careful timing adjustment of four pulses is needed. 200ps Trigger Timing (ns) Kick field scan BPM x-position (um) 20/27

1 st results of multi-bunch extraction, 2010/06/17 The intensity of each bunch was not flat and unstable. The x-position of extracted beam was clustered as bi-stable. Extracted beam position (x) Extracted beam intensity HV pulse arrival Pulse number Relative (ns) Very much complicated. Different behavior on each pulser! 21/27

22/27

Timing adjustment circuit was installed w/o delay with delay Use for beam extraction Not perfect but much better Pulse-train delay adjustment circuit; common trigger for each pulser is adjusted pulse-by-pulse. No inter-pulser adjustment. Pulse number Relative (ns) 23/27

2 nd results of multi-bunch extraction, 2010/10/26 Stable beam extraction was confirmed at the extraction line. The beam reach to the beam dump without any beam loss. 30 bunches of the beam are stored to the DR, stably. 24/27

Photos were taken just a day before earthquake! INFN stripline for the study at ATF Collaboration of KEK and INFN Low impedance stripline based on the design for DA  NE It was delivered to ATF in March We will install it in DR for the evaluation of impedance, but not for a beam extraction. 25/27

The stored current decreased gradually when the total current becomes higher. It was recovered after several minutes. We suspect the physical deformation of the strip-line electrode due to the heating by wake or SR. Challenging “small gap to enable the extraction at ATF” may leads this difficulty. This may be an issue “only at ATF”. Difficulty under the higher current “at ATF” single bunch 1 train 9 bunch 1 train Itot=2x bunch 3 train Itot=6x10 10 Blue: Stored current in DR 2hour 26/27

Conclusion The beam extraction by a fast kicker system has been successfully demonstrated at ATF. Further studies on the improvement of the pulser performance and its reliability for long term operation should be continued, but it will not request a beam. Honestly, we have a difficulty on the fast kicker operation under higher intensity beam. It is due to the design under the limited space for extraction in ATF. Further, we will proceed a beam test of the low impedance stripline designed and delivered by INFN, Italy in a near future. 27/27

28

29

30

31

32