© 2006 Petrolink International WITSML Conference 19/10/06 WITSML Developments Steven Johnstone Data Management Starts At The Point Of Acquisition
© 2006 Petrolink International WITSML Conference 19/10/06 Wellsite Configuration – Integrated Real-Time Data Transmission Data Acquisition units Wellsite Communication System Wireline Logging LWD / MWD Mudlogging WITSML Data Solution (WDS) Wellsite Hub Direct Sensor Input
© 2006 Petrolink International WITSML Conference 19/10/06 Wellsite Hub to the Enterprise Service Bus RIG USER Wellsite Hub RIG USER Firewall WITS Mudlogging LWD / MWD Wireline WELLSITE Rig Sensors Local Backup 4096 bit Encryption Service Bus
© 2006 Petrolink International WITSML Conference 19/10/06 Single Session Multiple Well Time-Plot Monitoring
© 2006 Petrolink International WITSML Conference 19/10/06 Service WITSML Server WITSML Drilling Collaboration Framework : Link to Applications Pore Pressure Fracture Gradient Service Mechanical Properties Service Log Analysis Service GeoSteering Service Firewall Well Knowledge Warehouse 4096 bit Encryption Service Bus
© 2006 Petrolink International WITSML Conference 19/10/06 WITSML Drilling Collaboration Framework : Link to Applications
© 2006 Petrolink International WITSML Conference 19/10/06 Screenshots may be displayed from any Machine
© 2006 Petrolink International WITSML Conference 19/10/06 WITSML Development Status Complete subscription support for WITSML V1.2 Data Flows WITSML V1.3 Publisher/Subscriber capability Extended WITSML V 1.2/1.3 STORE capabilities Monitoring and Alarm System 2