AHPS support of the Interstate 131 S-Curve Project in Grand Rapids, Michigan Mark Walton Service Hydrologist WFO Grand Rapids, Michigan Mark Walton Service.

Slides:



Advertisements
Similar presentations
Emergency Response via the Web Two emergencies in August 2007 highlight the Internet as a dynamic communication tool.
Advertisements

Halliburton Makes Oil Exploration Safer Using MATLAB and Neural Networks MATLAB® and Neural Networks MathWorks Products Used: MATLAB Compiler MATLAB Neural.
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
From Flooding to Drought Barbara Watson Meteorologist-in-Charge National Weather Service Binghamton Forecast Office.
Project Scheduling for Load Testing Bridges for ENCE 667 Course Project Spring 2001 Justin Myers.
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Ernie Wells Hydrologic Services Division NOAA National Weather Service May.
Introduction way Construction and Work Safety  Highway Construction and Work Safety  Concern to many  Construction workers, contractors, highway and.
NDACo Conference County Needs for Long Term Highway and Bridge Funding Jason Benson Cass County Engineer.
Skyscraper Construction
“A driver initiated program” Lance Morgan Dave Conklin.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Here comes the big bad flood! Since the mid-1900s, scientists’ ability to predict the arrival of extremely wet or dry weather has improved for many reasons.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
1 Hazardous Materials Response on Arizona’s Highways Presentation by Travis Qualls HazMat Response Specialist.
Marcellus Shale – Managing Our Road System Marcellus Transportation Safety Day September 22, 2011 Deputy Secretary for Highway Administration Scott Christie,
The Ground Water Characterization Program Helping Secure Virginia’s Ground Water Resources For The Future The DEQ Office of Ground Water Characterization.
Flood Avoidance and Mitigation
Building Human Resource Management Skills National Food Service Management Institute 1 Strategies for an Effective Work Environment Objectives At the completion.
Risk Engineering 1 ACCIDENT INVESTIGATION5/2011 Accident Investigation- Purpose.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Better Defining the Flood Threat Flood Inundation Mapping from the National Weather Service 2009 Severe Storms and Hydrology Conference Shreveport, LA.
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Dr. Thomas Graziano Acting Chief, Hydrologic Services Division Office of.
Stop Work Policy at Daya Bay. Why stop work? The Stop Work Policy has been developed to ensure that personnel know that they can stop any work that presents.
Evaluation of Potential Performance Measures for the Advanced Hydrologic Prediction Service Gary A. Wick NOAA Environmental Technology Laboratory On Rotational.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
MAINTENANCE & TRAFFIC OPERATION INCIDENT MANAGEMENT.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Conflict over a resource At a local scale. UK conflicts tend to be over building work Second runway in Manchester Newbury bypass New container Terminal.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Other Construction Projects
Damien Barr, ARM-P, CRIS, CSE- Manager of Risk Management, Wisconsin Department of Transportation (608) Wisconsin Dept. Of Transportation 2010.
WHY WEIGH AXLES ? THE ANSWERS AND SOLUTIONS FROM.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Environmental Management Plan Application and Supervision Darejan Kapanadze Tbilisi, May 2013.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
1 Ch16 Safety and Middle Managers Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 17- Week 12 2 nd Semester 2008/2009.
National Weather Service - Southeast River Forecast Center Southeast River Forecast Center North Florida Visit July 17-20, 2006 Southeast River Forecast.
National Weather Service 1 Operational Hydrologic Forecasts Challenges at the North Central River Forecast Center 18 November 2013 First Vinogradov’s Conference.
Purpose of Work Shop Share Ohio’s experience with a full closure reconstruction: the rationale, challenges, implementation and benefit.
LESSONS FROM LOURDES FLOOD EXPERIENCE. Repeating the Past Major flooding occurred in April 2005 Major flooding occurred in April 2005 Lourdes remained.
By George Wetzel/Mark Walton/Randall Graham HMT – WarnGen Focal Point/Hydrologist/SOO WFO Grand Rapids, Michigan Dam Break WarnGen Templates.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
U.S. Department of the Interior U.S. Geological Survey Marie C. Peppler USGS FIM Program Liaison Flood Inundation Mapping Program Project needs overview.
New Mexico Department of Transportation Research Bureau Expanding the Use of Weigh-In-Motion Data.
Quick Clearance Michigan State Police 5 th District.
Transportation Finance Advisory Committee May 18, 2012.
RFC Climate Requirements 2 nd NOAA Climate NWS Dialogue Meeting January 4, 2006 Kevin Werner.
Flood Inundation Mapping Program
1 Designing and Implementing Controls The Control Process The management function concerned with monitoring activities to ensure that they are being accomplished.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Vehicle Safety and Driving Safety Company’s POLICY To ensure all Company’s vehicles are kept and maintained in good running conditions. To ensure the.
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Peter Gabrielsen Chief, Hydrologic Services Division Eastern Region NOAA’s.
NEW TANK REPAIR PRODUCTS INSPECTION COATING Global AST Solutions Provider Since Personal Safety Awareness Initiative.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
COFFERDAMS.
Houston Area: Baltimore (81) Baltimore (81) Boston (48) Boston (48) Pittsburgh (56) Pittsburgh (56) San Francisco (47) San Francisco (47) Denver (153)
Conaway Conference March 15-16, 2016 “A Bridge from Concept to Construction” A Contractor’s Perspective.
Work Place Transport. Members of the BPF Health & Safety Committee.
1 ODNR - Floodplain Management Program Ensure the wise management of Ohio’s floodplains Floodplain Management in Mahoning County August 16, 2016.
Being Ready for the Mayday
PUBLIC ASSISTANCE GRANTS
Substructure Groundworks - Hazards
Roles and responsibilities PM
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
Site Based Preconstruction – Enabling Work
HERO UNIT Training Module
Pad Reclamation and Operation
David Dennis, CSHO, SSH Director of Safety, OHL USA.
Ron Hancock, PE NCDOT State Construction Engineer
Presentation transcript:

AHPS support of the Interstate 131 S-Curve Project in Grand Rapids, Michigan Mark Walton Service Hydrologist WFO Grand Rapids, Michigan Mark Walton Service Hydrologist WFO Grand Rapids, Michigan

S-Curve Project involved Total reconstruction of 1.2 miles of Interstate 131 through downtown Grand Rapids and over the Grand River Six bridges reconstructed including one over the Grand River Cost in excess of $100 million Total reconstruction of 1.2 miles of Interstate 131 through downtown Grand Rapids and over the Grand River Six bridges reconstructed including one over the Grand River Cost in excess of $100 million

Birds-eye view of the S-Curve Project Project was managed by the Michigan Department of Transportation Project was scheduled with significant rewards for early completion ($50,000/Day) Project would have normally taken three years to complete, but was open to traffic in ten months Photo courtesy: Michigan Department of Transportation

S-Curve Project required Equipment and people to work in and around the stream, with an access road built into the river Photos courtesy: Michigan Department of Transportation

S-Curve Project had Over $2 million worth of equipment on the causeway in the Grand River Equipment such as trucks, drill rigs, cranes, pumps, and generators Photo courtesy: Michigan Department of Transportation

S-Curve Project required Partial removal of a flood wall protecting downtown Grand Rapids Photo courtesy: Michigan Department of Transportation

How were AHPS forecasts used? Probabilistic and historical data helped the contractor to plan and bid for work. Daily plots of AHPS 5-Day forecasts were posted on the wall in the construction site office. During high flows, data were accessed via the internet several times a day. The forecasts ensured worker safety in the floodplain. The forecasts were used to determine movement and placement of heavy equipment in the floodplain. Long-range forecasts were used to plan the construction schedule of the bridge in and over the Grand River. Probabilistic and historical data helped the contractor to plan and bid for work. Daily plots of AHPS 5-Day forecasts were posted on the wall in the construction site office. During high flows, data were accessed via the internet several times a day. The forecasts ensured worker safety in the floodplain. The forecasts were used to determine movement and placement of heavy equipment in the floodplain. Long-range forecasts were used to plan the construction schedule of the bridge in and over the Grand River.

Users comment about AHPS forecasts “The hydrologic forecasts were timely.” “The forecasts did insure worker safety.” “Worker safety as the river was approaching design was a major concern.” The hydrologic forecasts from AHPS were “surprisingly accurate.” AHPS “helped when we were flooded out and we did not know when we could get back in the river – forecasts let us schedule work in other places and efficiently manage our resources.” “The hydrologic forecasts were timely.” “The forecasts did insure worker safety.” “Worker safety as the river was approaching design was a major concern.” The hydrologic forecasts from AHPS were “surprisingly accurate.” AHPS “helped when we were flooded out and we did not know when we could get back in the river – forecasts let us schedule work in other places and efficiently manage our resources.”

More user comments about AHPS forecasts “Although we could monitor river elevation on the cofferdam, the ability to predict when we would need to suspend work and flood it (the cofferdams would have to be flooded when the river levels got high to prevent them from buckling), was a great management tool and 2 nd check.” “Every day was critical, we found the hydrologic forecasts accurate within one day and many times even less on predicting a certain elevation.” “Although we could monitor river elevation on the cofferdam, the ability to predict when we would need to suspend work and flood it (the cofferdams would have to be flooded when the river levels got high to prevent them from buckling), was a great management tool and 2 nd check.” “Every day was critical, we found the hydrologic forecasts accurate within one day and many times even less on predicting a certain elevation.”

More user comments about AHPS Equipment had to be moved up out of the river several times. “By use of the hydrographs we knew the causeways would be topped by several feet and it would do so within 8-12 hours. We built a temporary bridge that day to bring out the equipment…without an accurate forecast that day we could easily have had major equipment damage, release of oils into the river and the like. In fact I heard a contractor down stream had a loader flooded that day in the river.”

AHPS assisted project managers in their efforts to Avoid major equipment damage Prevent release of oils into the river Limit unnecessary project delays Mitigate unsafe working conditions Restrict cost overruns