Service Training 04.2003ka Folie 1 K-VK-36 Pump injector engine Dismantle and assemble engine Dism. And ass. Cylinder head Guided fault finding.

Slides:



Advertisements
Similar presentations
Modern Automotive Technology PowerPoint for by Russell Krick
Advertisements

Byron High School Auto Diagnostics V8 Engine Disassembly Mr. Hintz.
Color Printer Training
Replacing the Maintenance Kit HP Printers OIT lab services.
1 Stripe 400/600 Removing and Installing Printhead Printhead Resistance Calibration Toggle Position Adjustment.
My Picture is Upside Down! HELP!!. Check your Remote # 2 NEC # 1 Mitsubishi.
Servicing Welch DRYFAST ULTRA Pump Models 2032
Robot Quick Build Session Transmission Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
Waukesha Cherry-Burrell
Service Training PV Series 42 PVplus
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
Click on this image to open the full PDF document.
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Yamaha oil pump rebuild
Honda Recon TRX-250 Installation Manual. STEP 1: Remove rear tires and install axle spacers. Use blue thread locker and tighten lugs to ATV specification:
MyLock 644D Service Seminar.
Engine Removal and Disassembly
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
Corning Cabelcon 1. 2 To begin with – we need some tools… Cable cutter Cabelcon RG11 Rotary Stripper Mounting tools Compression tool Please read the instructions.
Diesel Engine 4 Stroke Cycle model
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
REASSEMBLY and INSTALLATION u Chapter 12 u Classroom Manual u Page 325 CBCAUTOMOTIVERKCBCAUTOMOTIVERK.
Service Seminar Model MB4.
General idea of a couple of check rod system and adjustments
DISASSEMBLE ENGINE Teknik Kendaraan Ringan Semester 3 th Class XI Kompetensi Kejuruan SK-KD 6 TH.
Cylinder Head Motorcycle Engineering (021) Overhaul Cylinder Head (SK-KD – 04)
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
Basic Engine Theory Construction and Assembly. Bare V-type Block.
CHAPTER 10 The Valve Train Classroom Manual Page 243 Lab Manual
Note location of different length bolts
LAB #9 Valve Head replacement. Insert the valve. Make sure that the cap goes on the intake valve. Insert the springs. Insert the keeper.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
PULLERS. Puller part names b Jaws 2, 3, 42, 3, 4 b Pulling block b Threaded pusher.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
11 Chapter Engine Fundamentals. 11 Chapter Engine Fundamentals.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
PILLOWCASE EMBROIDERY MACHINE. FOLD PILLOWCASE IN HALF & PIN Put a pin through the top layer only F old in half to find center of band/cuff.
13 Engine Top End Construction Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives After studying.
Pistons and piston rings
STEP 1: ASSEMBLE ANGLE PLATES
Copyright © 2016 by The S.E.A. Group
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Assembly Instructions:
ENGINE MODE CODES.
Small Engine Disassembly
Interference and Timing
Basic Engine Review Click to Begin
Chapter 26: Mechanical fasteners 1
STEP 1: ASSEMBLE ANGLE PLATES
Modern Automotive Technology PowerPoint for by Russell Krick
Assembly instructions for M-K all bolt together hoppercone kit.
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
Chapter 11 Lesson 3 Engine Top End.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
709DCDA 2½ ”-10”.
C400, C400N, C400Z 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
Modern Automotive Technology PowerPoint for by Russell Krick
709 2½ ”-10”.
Replace Timing Belt 300 Hours.
Presentation transcript:

Service Training ka Folie 1 K-VK-36 Pump injector engine Dismantle and assemble engine Dism. And ass. Cylinder head Guided fault finding

Service Training ka Folie 2 K-VK-36 Pump injector engine Lock hub with mandrel to do this slide mandrel through free elongated hole on left side and into hole in cylinder head. Lock toothed belt crankshaft sprocket using crankshaft stop T To do this, push crankshaft stop from the face side of the toothed belt sprocket into the sprocket's teeth.

Service Training ka Folie 3 K-VK-36 Pump injector engine Insert a hexagon key into the hexagon hole onto limit stop and press the tensioning roller anti-clockwise -direction of arrow- until the toothed belt tensioning device can be locked with locking plate T10008.

Service Training ka Folie 4 K-VK-36 Pump injector engine Loosen camshaft sprocket securing bolts -1-, until the camshaft sprocket can be moved within the elongated holes. ‒ Turn camshaft sprocket in elongated holes clockwise -direction of arrow- onto limit stop.

Service Training ka Folie 5 K-VK-36 Pump injector engine Now turn the eccentric clockwise carefully with pin wrench 3387 until the eccentric lug lies directly before limit stop -B-. ‒ Fit toothed belt onto camshaft sprocket, tensioning roller, crankshaft toothed belt sprocket and, finally, the coolant pump toothed belt sprocket. ‒ Install toothed belt tensioning device.

Service Training ka Folie 6 K-VK-36 Pump injector engine

Service Training ka Folie 7 K-VK-36 Pump injector engine

Service Training ka Folie 8 K-VK-36 Pump injector engine

Black screen