Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.

Slides:



Advertisements
Similar presentations
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Advertisements

Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Final Review Meeting, September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
CERN Probably one of the most incredible experiments in the world!
Mid Term Review Meeting, 26 September 2012P. FARANTATOS1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
Mid Term Review Meeting, 26 September 2012E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE End of Project 15 TH SEPTEMBER 2012 This research project has been supported by a Marie.
ICE-DIP Mid-term review Data Transfer WP4a - ESR4: Aram Santogidis › 16/1/2015.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Highly skilled migrants and the development of the research & innovation sector of the Republic of Moldova: the need for a structured vision Author: Dr.
1 1. Some recent views ( ) 2 Linac tunnel
CATHI Project Administration Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI General Meeting CERN 14 November 2011.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Beam Instrumentation for the HIE-ISOLDE linac Francesca Zocca ISOLDE Workshop and Users Meeting December CERN Instituto de Estructura de la.
CERN Probably one of the most incredible experiments in the world!
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
HIE-ISOLDE Project Status Report
The HIE-ISOLDE Faraday Cup
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Slide 1 CATHI Training Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI kick-off meeting CERN 23 May 2011.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
REXTRAP plans for 2005 And future developments Pierre for the REX TEAM, REX’s day, 11/03/2005.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
Mid Term Review Meeting, 26 September 2012A. Shornikov 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
WP5 1 year activity report Niko Neufeld CERN/PH. WP5 (people)  6 ESRs working in ALICE, ATLAS, CMS and LHCb  Adriana Telesca  Luca Magnoni, Dan Octavian.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
Mid Term Review Meeting, 26 September * This research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
WU2 - Proton Source & LEBT Schedule 2013 L. Celona Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Mid-term review presentation 3rd August 2010 Spyridon.
WP1: Superconducting Cavity Developments and Tests Walter Venturini Delsolaro Mid Term Review Meeting, 26 September 2012 CATHI Marie Curie Initial Training.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Beam Dynamics Studies of the HIE-ISOLDE Superconducting LINAC at CERN
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
ELACCO mid-term Review
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Performance of BI systems at HIE-ISOLDE
REX operation and development in 2006
Mid-term review presentation 3rd August 2010
How to run ions in the future?
Update on Spanish Recruitment: Students, Staff, Fellows, Associates
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
HIE-LINAC status report
HIE-ISOLDE contribution packages
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Presentation transcript:

Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA CATHI) CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Davide Lanaia(BE - OP)* WP5, ESR 7 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012D. Lanaia2 Outline  Background;  Activity at CERN;  Project Status and Achievement;  Experience in the project;  Training;  Conclusions.

Mid Term Review Meeting, 26 September 2012D. Lanaia3 My Background  2007: Bachelor degree in telecommunication engineering from Catania University with thesis at INFN-LNS (Istituto Nazionale di Fisica Nucleare – Laboratori Nazionali del Sud) on ECR (Electron Cyclotron Resonance) Plasma Ion Source.  2010:Master degree in telecommunication engineering from Pisa University with thesis in collaboration with NURC (NATO Undersea Research Centre) on HF Radar and their use as a surveillance radar.  From 2010 to November 2011: Stage at INFN-LNS on plasma heating, Bernstein’s wave propagation in a plasma source, dissociation of toxic molecular by use of a plasma chamber.  From 2011 until now: Marie Currie CERN in BE - OP (Beams Department - Operation) for the HIE – ISOLDE Project.

Mid Term Review Meeting, 26 September 2012D. Lanaia4 My CERN  HEBT Layout;  REX-LINAC Operation;  Setting Converter Application;  Cavities Phasing up & Calibration Application;  Emittance Study;  Stripping Foils Study;

Mid Term Review Meeting, 26 September 2012D. Lanaia5 CERN Objectives The ESR training will be focused on the development of machine tune-up procedures that will later be implemented in the control software for the linac operation and active participation in the startup of the machine. Description of work 1.Draft the specification of the controls and of the beam monitoring tools specific to the HIE-REX Linac 2.Definition of tuning procedures and management of machine protection and alarm system 3.Draft console applications to be used by the operators for the Linac tuning and monitoring 4.Follow progress of the different aspects of the Linac design, construction and installation 5.Assist in the commissioning of the new machine Deliverables D19.Report on commissioning schedule, general tuning procedure, specifications for controls and beam diagnostics D20.Commissioning report. Final conference report and/or journal publication WP 5 All my CERN is related to the WP which I belong: SC - LINAC COMMISSIONING

Mid Term Review Meeting, 26 September 2012D. Lanaia6 CERN Experiments High energy driver beam protons REXEBIS REXTRAP MASS SEPARATOR 7-GAP MHz IH RFQ 9-GAP MHz 3.0 MeV/u 2.2 MeV/u 1.2 MeV/u 0.3 MeV/u ISOLDE beam 60 keV Rebuncher Primary target ISOLDE Actual Layout of REX – ISOLDE  Courtesy E. Piselli

Mid Term Review Meeting, 26 September 2012D. Lanaia7 CERN 3 MeV/u 5.5 MeV/u 10 MeV/u

Mid Term Review Meeting, 26 September 2012D. Lanaia8

Mid Term Review Meeting, 26 September 2012D. Lanaia9 Project Status and Achievement D19: Already achieved, document published. M17: Already achieved, trained by the other operators. M18: On going (Emittance, Stripping Foil test, ToF Measurement). TC7: Tests on my application were performed.

Mid Term Review Meeting, 26 September 2012D. Lanaia10 Project Status and Achievement  “Status of the HIE-ISOLDE Super Conducting Linac Design” article for IPAC 12  “HIE-ISOLDE SC Linac: Operational aspect and commissioning preparation” poster for IPAC12  “Beam Diagnostic Boxes for HIE-ISOLDE” EDMS Document;  “Stripping Foil Data Analysis” EDMS Document;  “Notes on the HIE ISOLDE Layout and Naming Convention” EDMS Document;

Mid Term Review Meeting, 26 September 2012D. Lanaia11 Experience in the project  HEBT Layout:  Weekly meeting

Mid Term Review Meeting, 26 September 2012D. Lanaia12 Experience in the project  REX – LINAC Operation  Trained by my supervisor & the other operators  Help colleagues to performs measurement (i.e. Faraday cup test, Silicon Detector study and TOF System)  Have contacts with ISOLDE users  Use and understanding of the existing operational tool (Farday cups, Eq array, Mass Scan, etc etc)

Mid Term Review Meeting, 26 September 2012D. Lanaia13 Experience in the project  Converter & Phasing up application  Application already up and under test in the ISOLDE Console Manager

Mid Term Review Meeting, 26 September 2012D. Lanaia14 Experience in the project  Emittance & Stripping foil study  Characterize the properties of the actual beam

Mid Term Review Meeting, 26 September 2012D. Lanaia15 Training & Secondment  Technical Training: Java, JUAS School, Radioprotection course;  Language Training: French CERN  School: First International School on Laser Applications at Accelerators  Secondment: INFN-LNL; TRIUMF  Visited: INFN-LNL; TRIUMF; all CERN

Mid Term Review Meeting, 26 September 2012D. Lanaia16 Conclusions  A lot of work was done during this 10 months and more needs to be done  Great working experience, huge possibility for our future.  Thanks to the CATHI Project.  Thanks for your attention.