German Cancio – WP4 developments Partner Logo WP4 / ATF ATF meeting, 9/4/2002

Slides:



Advertisements
Similar presentations
EGEE-II INFSO-RI Enabling Grids for E-sciencE The gLite middleware distribution OSG Consortium Meeting Seattle,
Advertisements

FP7-INFRA Enabling Grids for E-sciencE EGEE Induction Grid training for users, Institute of Physics Belgrade, Serbia Sep. 19, 2008.
German Cancio – WP4 developments Partner Logo WP4-install plans WP6 meeting, Paris project conference
NIKHEF Testbed 1 Plans for the coming three months.
WP 1 Grid Workload Management Massimo Sgaravatto INFN Padova.
DataGrid is a project funded by the European Union 22 September 2003 – n° 1 EDG WP4 Fabric Management: Fabric Monitoring and Fault Tolerance
A conceptual model of grid resources and services Authors: Sergio Andreozzi Massimo Sgaravatto Cristina Vistoli Presenter: Sergio Andreozzi INFN-CNAF Bologna.
Cracow Grid Workshop, November 5-6, 2001 Towards the CrossGrid Architecture Marian Bubak, Marek Garbacz, Maciej Malawski, and Katarzyna Zając.
ASIS et le projet EU DataGrid (EDG) Germán Cancio IT/FIO.
The EU DataGrid - Introduction The European DataGrid Project Team
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
GRID Workload Management System Massimo Sgaravatto INFN Padova.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
The EU DataGrid Architecture The European DataGrid Project Team
LIGO-G E ITR 2003 DMT Sub-Project John G. Zweizig LIGO/Caltech Argonne, May 10, 2004.
EDG - WP1 (Grid Work Scheduling) Status and plans Massimo Sgaravatto - INFN Padova Francesco Prelz – INFN Milano.
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
9/16/2000Ian Bird/JLAB1 Planning for JLAB Computational Resources Ian Bird.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
Computational grids and grids projects DSS,
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
Partner Logo DataGRID WP4 - Fabric Management Status HEPiX 2002, Catania / IT, , Jan Iven Role and.
DataGrid WP1 Massimo Sgaravatto INFN Padova. WP1 (Grid Workload Management) Objective of the first DataGrid workpackage is (according to the project "Technical.
Olof Bärring – WP4 summary- 4/9/ n° 1 Partner Logo WP4 report Plans for testbed 2
CSF4 Meta-Scheduler Name: Zhaohui Ding, Xiaohui Wei
A monitoring tool for a GRID operation center Sergio Andreozzi (INFN CNAF), Sergio Fantinel (INFN Padova), David Rebatto (INFN Milano), Gennaro Tortone.
Grid Workload Management Massimo Sgaravatto INFN Padova.
The European DataGrid Project Team The EU DataGrid.
Laboratório de Instrumentação e Física Experimental de Partículas GRID Activities at LIP Jorge Gomes - (LIP Computer Centre)
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
WP8 Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid WP8 Meeting, 16th November 2000 Glenn Patrick (RAL)
German Cancio – WP4 developments Partner Logo System Management: Node Configuration & Software Package Management
Deployment work at CERN: installation and configuration tasks WP4 workshop Barcelona project conference 5/03 German Cancio CERN IT/FIO.
German Cancio/ WP4 -1 WP4 comments for the TestBed German Cancio / WP4
G. Cancio, L. Cons, Ph. Defert - n°1 October 2002 Software Packages Management System for the EU DataGrid G. Cancio Melia, L. Cons, Ph. Defert. CERN/IT.
CEOS WGISS-21 CNES GRID related R&D activities Anne JEAN-ANTOINE PICCOLO CEOS WGISS-21 – Budapest – 2006, 8-12 May.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
Installing, running, and maintaining large Linux Clusters at CERN Thorsten Kleinwort CERN-IT/FIO CHEP
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
Resource Management Task Report Thomas Röblitz 19th June 2002.
Olof Bärring – WP4 summary- 4/9/ n° 1 Partner Logo WP4 report Plans for testbed 2 [Including slides prepared by Lex Holt.]
Proposal for a IS schema Massimo Sgaravatto INFN Padova.
UK Grid Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid Prototype and Globus Technical Meeting QMW, 22nd November 2000 Glenn Patrick (RAL)
Glite. Architecture Applications have access both to Higher-level Grid Services and to Foundation Grid Middleware Higher-Level Grid Services are supposed.
INFSO-RI Enabling Grids for E-sciencE GridICE: Grid and Fabric Monitoring Integrated for gLite-based Sites Sergio Fantinel INFN.
LCG workshop on Operational Issues CERN November, EGEE CIC activities (SA1) Accounting: current status
Olof Bärring – EDG WP4 status&plans- 22/10/ n° 1 Partner Logo EDG WP4 (fabric mgmt): status&plans Large Cluster.
LCG LCG-1 Deployment and usage experience Lev Shamardin SINP MSU, Moscow
DataTAG is a project funded by the European Union DataTAG WP4 meeting, Bologna 29/07/2003 – n o 1 GLUE Schema - Status Report DataTAG WP4 meeting Bologna,
German Cancio – WP4 developments Partner Logo WP4-install progress CERN, 19/6/2002 for WP4-install.
Ariel Garcia DataGrid WP6, Heidelberg, 26 th September 2003 Ariel García CrossGrid testbed status Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft.
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
Grid Workload Management (WP 1) Massimo Sgaravatto INFN Padova.
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
DataTAG is a project funded by the European Union International School on Grid Computing, 23 Jul 2003 – n o 1 GridICE The eyes of the grid PART I. Introduction.
Quattor tutorial Introduction German Cancio, Rafael Garcia, Cal Loomis.
CERN Certification & Testing LCG Certification & Testing Team (C&T Team) Marco Serra - CERN / INFN Zdenek Sekera - CERN.
Bob Jones – Project Architecture - 1 March n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN.
DataTAG is a project funded by the European Union CERN, 8 May 2003 – n o 1 / 10 Grid Monitoring A conceptual introduction to GridICE Sergio Andreozzi
Partner Logo Olof Bärring, WP4 workshop 10/12/ n° 1 (My) Vision of where we are going WP4 workshop, 10/12/2002 Olof Bärring.
A System for Monitoring and Management of Computational Grids Warren Smith Computer Sciences Corporation NASA Ames Research Center.
WP4-install status update
Sergio Fantinel, INFN LNL/PD
EDT-WP4 monitoring group status report
Please find the definitions of the following terms
Wide Area Workload Management Work Package DATAGRID project
Presentation transcript:

German Cancio – WP4 developments Partner Logo WP4 / ATF ATF meeting, 9/4/2002

German Cancio – WP4 developments - n° 2 Outline Analysis of WP4 u Dependencies on external Software u Dependencies on SW provided by other WP’s u Vagueness of responsibilities/ holes in functionality between WP’s u Redundancy/duplication of WP’s

German Cancio – WP4 developments - n° 3 Analysis of WP’s: WP4 (I) (Runtime) Dependencies on external Software u LCFG u Globus: n gatekeeper/GRAM s No feedback from Authorization group on LCAS component n MDS-2 info provider specification n (what will be the impact of Globus3 and the OGSA?) u Operating system n RH Linux -> RH62, RH72. Support for 6.2? n Solaris…? u Batch systems n LSF, PBS n Condor from release 1.4 on u Future dependencies to come: n database and GUI for monitoring (TBD)

German Cancio – WP4 developments - n° 4 Analysis of WP’s: WP4 (II) Dependencies on SW provided by other WP’s u Packaging (SW packaged according to WP4 standards and rules) n vs. Globus GPT and others… n Wider question: what WP’s are mandatory to deploy?? u Service management: provide LCFG component [wrapper] for your services u In the future: R-GMA && WP4 information providers n Changes on the schema? n Changes on the invocation model (push/pull) and output format? n Again: impact of OGSA

German Cancio – WP4 developments - n° 5 Analysis of WP’s: WP4 (III) Vagueness of responsibilities/ holes in functionality between WP’s u Accounting (at global and local=fabric level). n What info is needed from the fabric? n For what purpose? (authorization, grid banking?) u MPI n Inside a fabric farm n Between fabric farms u Interactive jobs u (not related to WP4…) Management of storage capacity on cluster CPU nodes? n Use local disk space for (unreliable) replicas u Schema definition (GLUE work)

German Cancio – WP4 developments - n° 6 Analysis of WP’s: WP4 (IV) Redundancy/duplication of WP’s u Monitoring n Schemata and interface for sensors n Presentation of monitoring data