Proposal in Detail – Part 1 Project Description, Timeframes and Risks.

Slides:



Advertisements
Similar presentations
1 Field Management: Roles & Responsibilities Partially Adapted from Multiple Indicator Cluster Surveys (MICS) Regional Training Workshop – Survey Techniques,
Advertisements

Gallup Q12 Definitions Notes to Managers
Introduction to Project Planning
Grantee Program Plan. Components of the Program Plan Goals  Objectives  Activities  Techniques & Tools  Outcomes/Change.
Bid Writing Basics Hannah McSherry Project Development Officer
Workplace Writing Planning an Appropriate Writing Strategy: The Rhetorical Situation.
2006 TEA Conference Terry Berends, PE Assistant State Design Engineer Washington State Department of Transportation Risk Based Estimating Tools at WSDOT.
Chapter 6 Review Questions
Supporting people with a learning disability Introduction to Project Management Presenter: Steve Raw FInstLM, FCMI.
What does it take!?. As you know, the employment market has changed dramatically in the past few years. We came a long way form the times where all that.
NUPAD Personal Development Planning Supporting your Success with Personal Development Planning What you need to know about NUPAD and MyPAD Andrea Duncan,
Improving Students’ understanding of Feedback
Analytical methods for Information Systems Professionals Week 13 Lecture 1 CONCLUSION.
© Careers Advisory ServicePage 1 Interview Skills Careers Advisory Service.
1 Lecture 6 The Systems Analyst (Role and activities) Systems Analysis & Design Academic Year 2008/9.
Training Needs Analysis
Proposal in Detail – Part 2
Choosing Your Primary Research Method What do you need to find out that your literature did not provide?
Westpac Banking Corporation ABN NEEOPA FORUM OCTOBER 2013 MAINSTREAMING FLEXIBILITY AT WESTPAC GROUP.
Copyright © 2005 Christopher Rath under the Creative Commons Attribution-NonCommercial-ShareAlike 2.5 License (see last page). Version 2.0, Salary.
Employee Engagement Survey
OSSE School Improvement Data Workshop Workshop #4 June 30, 2015 Office of the State Superintendent of Education.
McGraw-Hill © 2006 The McGraw-Hill Companies, Inc. All rights reserved. The Nature of Research Chapter One.
Software Project Management
Risk management in Software Engineering T erm Paper By By Praveenkumar Sammita Praveenkumar Sammita CSC532 CSC532.
How to Impress at Interview Jane Chanaa, Careers Adviser Download this PPT to open documents & read slide notes!
The Project Proposal.
Fundamentals of Evaluation for Public Health Programs ROBERT FOLEY, M.ED. NIHB TRIBAL PUBLIC HEALTH SUMMIT MARCH 31,
An Online Knowledge Base for Sustainable Military Facilities & Infrastructure Dr. Annie R. Pearce, Branch Head Sustainable Facilities & Infrastructure.
College of Science and Engineering Evaluation of the Learning and Teaching Strategy: The Way Forward? Velda McCune Centre for Teaching, Learning and Assessment.
Comm 101 Tutorial Section 101 Week 4. Agenda Case SkillsLieber CaseBusiness PlanQuestionsDiscussion (if time)
Chapter 12 Project Risk Management
Using employee feedback as a means to improve employee management.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
W RITING P OWERFUL E XECUTIVE S UMMARIES Presented By B EVERLEY S INCLAIR.
Project Management All projects need to be “managed” –Cost (people-effort, tools, education, etc.) –schedule –deliverables and “associated” characteristics.
Rethinking Research Deane Neubauer Professor Emeritus, University of Hawaii, Manoa Presented to the School of Social Science and Languages King Mongkut’s.
Monitoring and Evaluating in the PHEA Educational Technology Initiative Patrick Spaven.
Healthy Futures Performance Measures Session. Session Overview Combination of presentation and interactive components Time at the end of the session for.
Delegation Skills. Objective Explain What is Delegation Explain Why People Do Not Delegate Describe the Benefits of Delegating List What Tasks Should.
Clerical & Support Staff Introduction to Moving ON Audits & Clinical Indicators.
Education Performance Measures Session. Session Overview Combination of presentation and interactive components Time at the end of the session for Q&A.
Chap 8: Administering Security.  Security is a combination Technical – covered in chap 1 Administrative Physical controls SE571 Security in Computing.
The Project Proposal. Summary of Project No more that 350 words The abstract can consist of a one-line summary of each of the other sections of the proposal.
Monitoring Risk Factors General attitude of team members based on project pressures The degree to which the team is jelled Interpersonal relationships.
Gathering Information: Monitoring your Progress. What does it mean to monitor your progress? Monitoring your initiative can help you weigh your actions.
1 The Buddy Program: An initiative from the Office of the Dean of Students in the Division of Education, Arts & Social Sciences.
Conduct User Analysis Website Design With handout UseNeedsAnalysis.doc.
Your CV - your marketing tool Your CV must convince an employer that: You have the skills and experience they are looking for You have held responsibility.
A brief look at the components that make up the system life cycle.
INFO 3: Use of ICT In The Digital World Topic 7: Developing ICT Solutions Factors that contribute to the success and failure of ICT Systems.
© PeopleAdvantage 2013 All Rights Reserved We will Show You How to Easily Conduct Effective Performance Appraisals LCSA Conference 2013.
© 2015 ASPCA ®. All Rights Reserved. Succession Planning & People Development Practical Tools for Managers Cheryl Bucci - Vice President, Human Resources.
Investigate Plan Design Create Evaluate (Test it to objective evaluation at each stage of the design cycle) state – describe - explain the problem some.
Research Philosophies, Approaches and Strategies Levent Altinay.
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
Risk Mitigation Submitted By, S. Anitha Devi, M.E-CSE.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
The Project Proposal. Summary of Project No more that 350 words The abstract can consist of a one-line summary of each of the other sections of the proposal.
Interview Skills.
Exam Structure Exam (1 Hr 30 Minutes)
Multi-Sectoral Nutrition Action Planning Training Module
© 2012 The McGraw-Hill Companies, Inc.
Gathering Information: Monitoring your Progress
Assessing Risk Impact Factors affecting the consequences Nature Scope
Project Management Process Groups
Gathering Information: Monitoring your Progress
Presentation transcript:

Proposal in Detail – Part 1 Project Description, Timeframes and Risks

Project Description Reminder

Project Description At least a page and a half to two pages The description needs to tell us two things, this is WHAT I’m going to do, and this is WHY I’m doing it.

Project Description

Include a few diagrams to show the architecture of:  The experiment  The artefact  The models

Project Description

So let’s do one!

Project Description Given me a sentence setting the scene for your project, in the broadest terms, what’s the issue?

Project Description Given me a detailed sentence covering what this project is about.

Project Description Tell me in one or two sentences what the literature says about this area.

Project Description NEW PARAGRAPH

Project Description If there is an organisation involved in your research, can you give me one sentence on that organisation? If there is a particular person or group of people involved in your research, can you give me one sentence on them?

Project Description NEW PARAGRAPH

Project Description Tell me how you are going to find out about the current situation (before you do your experiment/intervention), what are you going to do to find out as much as you can, measuring, reading, interviews, surveys, etc. This should be two or three sentences. Explain why your approach to the investigation makes sense. OR What tools and techniques are you going explore in your research?

Project Description Describe what kind of measures you have undertaken, are they Quantitative or Qualitative, and what how they tied into your research question. OR How will you compare the benefits and shortcomings of these tools and techniques?

Project Description Tell me how these outcomes be used, will they be just to measure change after the experiment/intervention, or will this process help shape the experiment in a deeper way? OR How will the benefits and shortcomings of the tools and techniques inform your exploration of the data?

Project Description NEW PARAGRAPH

Project Description Tell me what will the experiment/intervention will be in one sentence.

Project Description Tell me what the technologies, techniques, people, and processes will be.

Project Description Tell me how you will measure the use of the technologies, techniques, people, and processes.

Project Description NEW PARAGRAPH

Project Description Give me a diagram of the experiment  A Flowchart  A Use Case  A Schematic  A Technical Architecture

Project Description NEW PARAGRAPH

Project Description Tell me what this will show, and how this ties back to your research question.

Project Description Tell me how you are going to evaluate the outcome of the results.

Project Description Tell me some of your references.

Project Description Tell me some of your references.

Timeframes Reminder

Timeframes

So let’s do one!

Timeframes For each sentence in the project description, put an approximate timeframe (in weeks) to each element. e.g.  Literature  People/Organisation  Measuring Current Situation  Experiment/Intervention  Evaluation

Risks Reminder

Risks You need create a Risk Mitigation, Monitoring and Management matrix. An effective strategy must consider three issues:  risk avoidance,  risk monitoring, and  risk management and contingency planning.

Risks Example:  Assume that high staff turnover is noted as a project risk

Risks Contingency Planning Assumes that mitigation efforts have failed and that the risk has become a reality Continuing the example, the project is well underway and a number of people announce that they will be leaving If the mitigation strategy has been followed, backup is available, information is documented and knowledge has been dispersed across the team

Risks A proactive approach to risk avoidance is the best strategy. Develop a plan for risk mitigation. For example: assume that high staff turnover is noted as a project risk r 1, some of the possible steps to be taken are these:  Meet with current staff to determine causes for turnover  Assume turnover will occur and develop techniques to ensure continuity when people leave.  Define a backup staff member for every critical technologies.  Double everyone’s salary

Risks As the project proceeds, the following factors can be monitored:  general attitude of team members based on project pressures,  the degree to which the team has jelled,  interpersonal relationship among team members,  availability of jobs within the company and outside it As the project proceeds, risk monitoring activities commence. In addition of these factors, the project manager should monitor the effectiveness of risk mitigation steps. Project manager monitors factors that may provide an indication of whether the risk is becoming more or less likely

Risks Discuss project-based risks only These are NOT risks;  I might get sick in the middle of my project  I might get a promotion and be too busy in my job  My girlfriend/boyfriend might run off with my best friend  My dog might run away  My supervisor might now give me a lot of feedback

Risks These are risks;  My test audience might not help me  The tool I use might not fully match the requirements  I might not get the technology/software I need  I might not get a lot of responses from my survey  Problems might take longer to solve than I predicted

Risks RiskLevel of RiskManagementMonitorMitigation 1Loss of any/all part or project ModerateDevelop a comprehensive back up strategy at the start of the project. Ensure backups are being completed. Check files dates and sizes. Keep daily, weekly and monthly backups on multiple devices. 2Insufficient responses to questionnaire CriticalKeep log of answered questionnaires Reference questionnaires completed against timeframe Ensure questionnaire available to enough people 3Lack of time for project due to settling in time in new work position LowFollow plan for completion of dissertation Continuously track dissertation progress Allow an occasional annual leave day if behind

Risks So let’s do one!

Risks Based on your project description, develop some risks (in pairs) for your proposals.