Fern Valley Interchange Project Development Team Meeting February 3, 2011 9:00 – 11:00 p.m.

Slides:



Advertisements
Similar presentations
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Advertisements

The presentation will follow this format:
September 18, 2008 I-35 South Environmental Assessment North End of I-35 SH 9W Interchange Ramps North to ½ Mile North of Main Street in Norman Public.
Fern Valley Interchange Public Hearing November 3, 2010.
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee October 3, 2007 Workshop.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
OR 22 – Greenwood Road to Doaks Ferry Road Expressway Management Plan.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Fountaingrove Parkway Summary of Recommendations November 27, 2007.
New I-65 Interchange at Worthsville Road Welcome!.
Port St. Lucie City of Crosstown Parkway Extension Project Development and Environment (PD&E) Study & Environmental Impact Statement (EIS) Substantial.
Environmental Assessment Public Meeting
Federal Aid Project No. STP 2603 (501) Environmental Assessment
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
Project Background STIP update - City requests cancellation of US101 at Logan Road EA and proposes new modernization project: US101 at 32nd Street.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.
Planning and Community Development Department Housing Element City Council February 03, 2014.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Public Scoping Meeting National Environmental Policy Act Portageville Bridge Project Tuesday, November 19, PM – 7 PM Genesee River Restaurant,
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
USA Parkway Project Welcome Public Information Meeting to the
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
Traditional Project Development Process ConstructionPlanningNEPA Design ROW CE, EIS, EA Location and Design Concept approval.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
INTEGRATING ASSESSMENT OF THE ECONOMIC BENEFITS OF TRANSPORTATION IMPROVEMENTS IN PROJECT-LEVEL ALTERNATIVES ANALYSIS Meiwu An, Pikes Peak Area Council.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
EAST BATON ROUGE PARISH PECUE LANE/I-10 INTERCHANGE EAST BATON ROUGE PARISH CITY/PARISH PROJECT NO. 09-CS-US-0041 STATE PROJECT NO. H FEDERAL AID.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
I-4 Express Lanes Project Development and Environment (PD&E) Study From east of 50 th Street to the Polk Parkway (SR 570) WPI Segment No: Polk.
Project Status & Right-of-Way Acquisition
US 181 Harbor Bridge Project
Facebook Campus Expansion Project EIR
Public Workshop #1 August 18, 2010.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
PROJ. 566(17) LOR PID MAJOR WIDENING
I Street Bridge Replacement Project
Presentation transcript:

Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.

Agenda Introductions, Review Agenda, Approve Minutes Nancy Reynolds IAMP UpdateMike Baker Public Hearing SummaryNancy Reynolds CAC Recommended Alternative to AdvanceNancy Reynolds Public Comment (Audience)Nancy Reynolds EA Public Comment OverviewNancy Reynolds PDT Recommendation of Alternative to AdvanceNancy Reynolds Next StepsNancy Reynolds Comfort CheckPat Foley Thank You for ParticipatingDick Leever Adjourn

IAMP Update Status of Interchange Area Management Plan

Public Hearing Summary Background About 30 alternatives evaluated in developing proposed project. Two alternatives evaluated in the Environmental Assessment (EA):  No-Build Alternative  Build Alternative EA published in October Public hearing/open house held in November Purpose:  Inform public of project status, contents of the EA, and next steps.  Receive public comments on the EA prior to a recommendation on the preferred alternative.

Public Hearing Summary (cont.) Attendance & Comments About 80 people attended the public hearing. 6 oral testimonies were received. 20 written comments were received.

Public Hearing Summary (cont.) Comment Preference 10 supported the Build Alternative 4 supported the No-Build or a different alternative

Public Hearing Summary (cont.) Build Alternative Support EA looks great. ODOT executed comprehensive NEPA process with extensive public outreach and testimony. Bicyclists, pedestrians, autos & trucks will benefit. Project would be very beneficial to Phoenix & other communities. Phoenix East Side Traffic Study group supports project.

Public Hearing Summary (cont.) Build Alternative Suggestions At Fern Valley Rd/S. Phoenix Rd. intersection, provide signal, right-turn lane, or 2- or 3-way stop signs. At Extended S. Phoenix Rd, provide 2 left-turn lanes for traffic turning south towards interchange. Minimize the cost of water line relocation for the City of Phoenix. Provide access to pedestrians & bicyclists during construction.

Public Hearing Summary (cont.) Other Key Issues Raised Need interchange or overcrossing at South Stage Road. Too many impacts to businesses during tough economic times. Realign Fern Valley Road to connect to OR 99 at Cheryl Lane rather than Ray’s Market due to pedestrian safety and traffic flow concerns. Need easier accessibility to the truck stop. EIS is required for this project due to potential substantive damage to water quality, farmland and air quality.

Public Hearing Summary (cont.) Other Key Issues Raised (cont.) EA should include more build alternatives. EA should include additional cumulative impact analysis due to urbanization. Negative impact of parking removal on individual property. Important to repair Bear Creek Bridge and I-5 structure. Remove the previous [interim] project on Fern Valley Road. Air quality impacts associated with truck traffic traveling additional distance. Should not solve regional traffic problems at the Fern Valley Interchange—only local problems.

CAC Recommended Alternative to Advance Summary of CAC Recommendation for the Fern Valley Interchange project.

Audience Public Comments Opportunity for public comments from members of the audience.

PDT Comment Overview PDT discussion of public comments.

PDT Recommendation of Alternative to Advance Identify preferred alternative to advance by written ballot: Build No-Build

Next Steps Following PDT recommendation on Build vs. No-Build Alternative: 1.FHWA decision on Build vs. No-Build Alternative 2.Publication of decision document

Comfort Check Thank you for participating