NIKHEF B-field monitors Paul Balm November 11 th, 1999.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

IMPLEMENTATION OF PCS FOR MONITORING THE GROUND INTEGRITY DEVICE Jennie Burns, College of Arts and Sciences, Creighton University, Omaha, NE
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
CM-18 June The Measurement and Monitoring of the Field from the MICE Magnets Michael A Green Lawrence Berkeley Laboratory, Berkeley, USA Frank Filthaut.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
Beam Position Monitors MICE CM Harbin January, 2009.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
MICE LH2 Absorber Instrumentation - What is necessary/ desirable? (physics calibration) Temperature inside the the absorber Temperature inside the absorber.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Feb Absorber/coil instrumentation and controls  Subsystems Absorbers RF Magnets  Monitoring/safety  Data acquisition: Information on system.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Solenoid Magnetic Field Mapping Paul S Miyagawa University of Manchester Objectives Mapper machine Mapper software Simulation Corrections Fitting Future.
Solenoid Magnetic Field Mapping Paul S Miyagawa University of Manchester Introduction Mapper machine Mapper software - Simulation - Corrections - Fitting.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
Angular orientation reconstruction of the Hall sensor calibration setup By Zdenko van Kesteren Supervisor: prof. dr. Frank Linde.
EMBEDDED WEB SERVER. CONTENT: 1.ABSTRACT 2.INTRODUCTION TO EMBEDDED SYSTEMS 3.INTRODUCTION TO EMBEDDED WEB SERVER 4.BLOCK DIAGRAM 5.POER SUPPLY 6.COMPONENT.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
A year of ATLAS preparation. Steve Snow New Year 2006 The resolution of tracks reconstructed in ATLAS ID should be: Good enough for some physics from the.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
ATLAS Inner Detector Magnetic Field I am responsible for providing the magnetic field map for the ATLAS Inner Detector.  6m long x 2m diameter cylindrical.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 28 Absorber Systems & MICE Magnets Session 6 October 2010 technical drawings by.
12 April 2006 Slide 1/16 MTM Seminar April 12th 2006 Giuseppe Peiro ( Presented by Remo Maccaferri )
COBRA Magnet Status W. Ootani June 27th, 2006 MEG Review W. Ootani June 27th, 2006 MEG Review.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
MICE Phase 1 Koji Yoshimura KEK June
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Mapping the Magnetic Field of the ATLAS Solenoid Paul S Miyagawa University of Manchester ATLAS experiment + solenoid Objectives Field mapping machine.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
JRA1 PCMAG field mapping Elements of the work: Hall sensors: improvements and production Calibration of Hall sensor cards Mechanical mapping device Installation.
Physics requirements  mapping spec’s Strategy: analyze measurements to get field Mapping plan: where/how to map Engineering design: sensor, fixtures,
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
PACMAN : technical objectives Hélène Mainaud Durand.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
ELENA installation progress F. Butin / ELENA collaboration.
Performance of B-sensor types EUDET NIKHEF VS F. Bergsma 12/9/2007.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Installation of the T600 at Fermilab
DAQ for ATLAS SCT macro-assembly
Renovation of the 45-year old PS magnets
LLRF and Beam-based Longitudinal Feedback Readiness
Pierluigi Paolucci - I.N.F.N. Naples
RPC Detector Control System
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
RPC Detector Control System
Presentation transcript:

NIKHEF B-field monitors Paul Balm November 11 th, 1999

Outline Introduction The system –Hall head, conditioner, etc. –Cabling & location of equipment Calibration Read-out Installation and schedule Conclusion

Introduction Hall probes providing actual 3D-measurement of B-field, complementing the solenoid current measurement and field map Located in the clearance between fiber tracker and solenoid location of probes

System overview Basic measurement device is a Hall head –contains three Hall ‘probes’ for each of the three directions and a temperature sensor Hall head read out by a conditioner, containing an ADC Conditioners read out from read-out PC –connection provided by CAN-bus network

The Hall head 0.59 inch 0.39 inch 0.16 inch

CAN-bus Noise pick-up: –No ground loops (opto-coupled) –Shielded housing of the nodes –Only active when read out; power may even be disconnected while taking data Support on longer term: –Used in automobile industry –ATLAS default bus

Location of equipment CFT/SMT conditioners CAN node C.C. Read-out PC Ethernet connecting to EPICS Strips with Hall heads Hall heads: –in clearance solenoid/CFT: held by locator strips, 6 locations in , 6 in z –on CC face: held by studs, locations to be finalized Conditioners on the face of CC CAN nodes on top of CC Read-out PC “far away”

Calibration Performed at CERN –Hall head will be rotated in magnetic field, range 0-2 Tesla –Procedure repeated at various temperatures –Provides calibration tables to be used by read- out software Comparison to field map –fringe field is a problem

Installation and schedule Already done:Design is fixed, prototypes assembled Ongoing:(Preparation for) Calibration at CERN Installation of strip-holders in solenoid Dec ~15:System test at NIKHEF January:Calibration ready System arrives at Fermilab Read-out software components put together February:Full (calibrated) system test in solenoid “Final” installation after installation of CFT

Conclusions Ready in February/March 2000 (personal estimate November 1999) Work to be done: –system test at NIKHEF in December –perform tests in solenoid field –work out comparison field map –details of read-out Sheets available at