MWSS Diatomite 21S Weekly Update Chevron Reporting Period: 6/29/2015 – 7/5/2015.

Slides:



Advertisements
Similar presentations
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Advertisements

CONSTRUCTION DRILLING INC.
1 Beachcomber Bay Sewer Lift Station Homeowners believe a better solution is available for both the City and the Homeowners.
Site Grading Site Grading Civil Engineering and Architecture
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Management of future floods at Cockermouth LO: To be able to explain how a specific riverine area has been managed.
Click to continue…. Railroad Track wetland Image Date: December 2003.
TRENCH RESCUE No need to click to advance, the show will automatically advance.
Lecture 4 Excavating and Lifting
1 Excavations Best Practice Excavations. 2 Agenda - Introduction Statistics Excavations - Best Practices Question Period.
Risk Management Department
Solar Panels and HOAs – One Homeowner’s Experience Presented To: Solar Washington General Meeting By: Don Stimson Date: March 4, 2015.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
Provider Human Rights Coordinator Role Accessing HCSIS to Support Human Rights Committee Reviews September 11, 2013.
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
Property Appraiser and Tax Collector Office Space Update July 8, 2014.
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
MAKING PROGRESS POSSIBLE 11/20/09 Technology in the Dirt GIS Day – McAllen, TX.
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
MNM Fatal Falling/Sliding Material Falling/Sliding Material December 13, 2013 (Georgia) December 13, 2013 (Georgia) Industrial Sand Mine Industrial.
Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Fendering Update The following activities are anticipated over the next quarter: Review of alternate designs for fendering Meet key stakeholders and regulatory.
April 17, 2007 BCC Called Public Hearing on BZA #VA February 1, 2007 Applicant: Towanda Hannah.
MWSS Weekly Order 1067 Update Chevron 4/8/2015. Out of Reservoir Tilt Events in MWSS 21S O-1067 area from 4/1/2015 to 4/8/2015 Well symbol at TD 2013.
© 2015 EarthCon Consultants, Inc. All rights reserved. This material may not be reproduced, displayed, modified or distributed without the express prior.
ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban.
MWSS Diatomite 21S Weekly Update Chevron Reporting Period: 6/1/2015 – 6/7/2015.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Norberg Property 86 South La Senda – Back Yard Improvements Norberg top of bluff Staff top of bluff Vine covered fence Photograph from Mark Johnsson Memorandum.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
MWSS Weekly Order 1067 Update Chevron 4/15/2015. Out of Reservoir Tilt Events in MWSS 21S EO1067 area from 4/8/2015 to 4/15/2015 Map as per DOGGR’s letter.
View of well and location from the northern slope. According to a company representative, the location size has not been reduced because the well still.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES John Osborne GS/SE 16 May 2013.
COFFERDAMS.
Conservation Development and Planning Department Code Compliance Flow Chart for County Code (Zoning & Land Use) Violations COMPLAINT RESEARCH AND PRIORITIZE.
SOIL MECHANICS AND CLASSIFICATION. FACTORS WHICH HOLD SOIL TOGETHER o Cohesion  Internal Friction.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Conservation Area Impact Permit Gary and Karen Nelson and Dennis Hightower District 4 June 9, 2009 Environmental Protection Division Environmental Protection.
Applicant:Ann Blide / Calda Donna LLC Agent and potential purchaser:Ben Hanke Site Address:Part of Government Lots 1 and 2 Property #s: A Computer.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
GENERAL REQUIREMENTS CFR paragraphs (a) through (l) The Competent Person has responsibility to evaluate all hazards in the vicinity of the work.
California State Lands Commission Santa Barbara Channel Hazards Removal Program California State Lands Commission Meeting April 6, 2011 Curtis Fossum Executive.
SAL INSTITUTE OF TECHNOLOGY AND ENGEENIRING RESEARCH Ahmedabad B.E (3rd Semester)-Civil-Shift 2 December-2014 Shah Disha R.( ) Gosai Beran.( )
CISD Elementary School No. 5 Elevations Discuss the site plan elevation changes to the new CISD Elementary School located at 2520 and 2530 N. White Chapel.
July 4, 2017 AURORA UNITED CHURCH + SOUTHBOUND DEVELOPMENT LTD Yonge Street, 55&57/57A Temperance Street, 12&16 Tyler Street General Committee Meeting.
Stormwater Management
EPA Region 7 Lead Remediation Byrnes Mill Dam and Park
Substructure Groundworks - Hazards
City of Charlottesville
Excavation Hazards & Controls.
Faculty Of Civil engineering department BMCET,SURAT.
Site Grading Site Grading Civil Engineering and Architecture
{Graduation Project} An-Najah National University
Chapter 8 Civil Engineering Part 2: Geotechnical Engineering
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
4th Annual Construction Law Summit
Prepared By: Cutcher & Associates, Inc. Coastal Engineers
Retaining Walls 101 – July 25th 2018
PROJ. 566(17) LOR PID MAJOR WIDENING
Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa.
Construction Considerations
The Anschutz Health Sciences Building Construction Update 8 April 2019.
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Road Plans and Soil Retention 2019
Presentation transcript:

MWSS Diatomite 21S Weekly Update Chevron Reporting Period: 6/29/2015 – 7/5/2015

Above of Reservoir Tilt Events in MWSS Diatomite 21S area from 6/29/2015 to 7/5/2015 Map as per DOGGR’s letter Tilt event Activity Summary Offset Operator (TRC): No above reservoir tilt events in TRC property during the reporting period. There have been 6 tilt events in the same location (East of the lease line and North east of the chevron well 20 sump expression ) since April 1st and corresponding Chevron Well 20 sump increased flow events. Chevron: 1 above reservoir tilt event (#06/29A, depth at 255 ft, south west of the sump expression) in Chevron property during the reporting period. Chevron is not steaming within 800’ of the Well 20 Sump Expression at this time. Event # 06/29A

Well 20 Sump Volumes (1/1/2014 – 7/5/2015) 6/29/15– 7/5/15 Date 15 day Avg. Volume pulled (bbls) Daily Volume pulled (bbls) 6/29/ /30/ /1/ /2/ /3/ /4/ /5/ Start/End of EO1016 Phase 3 TRC steam injection test Estimated start of TRC steaming as per EO TRC steaming per area of investigation map TRC Steaming during Phase 3 – Emergency Order 1016 TRC Steaming – Emergency Order 1068 * Chevron is not steaming within 800’ of the Well 20 Sump Expression at this time.

Well 20 Sump area ( 7/1/2015) Visual Observations: No new seep locations on Chevron property. * Chevron is not steaming within 800’ of the Well 20 Sump Expression at this time. Chevron TRC

Chevron MWSS 21S Property Line and Well 20 Sump “21S Restricted Entry Area” Do not enter red outlined area without approved safety plan N Outline of restricted area 22S TRC 21S CVX Photo 2 March 2015 Red outlined area should not be entered without approval of the Chevron 21S Diatomite OS. Site specific safe work plans must be developed and approved prior to entry. Well 20 Sump Expression Area 21S Property Line (dashed line) & Unstable Bank Area Due to the instability of the embankment between Chevron and TRC properties, Chevron has extended the Do Not Enter Area (“21S Restricted Area”) to include the area from the embankment to the flow lines that run west of Chevron wells H225 and 204R. The K- rails no longer define the Do Not Enter Area and will be removed. This area is outlined in red on the aerial photo. Chevron requests that no one enters the red outlined area without contacting the Chevron Operations Supervisor and developing a written safe work plan prior to entry. The Chevron Supervisor can be contacted at Chevron will work with the DOGGR to safely obtain photos or other data in this area if access to this area is required.

The Embankment Can be Stabilized 6

Concern for TRC Recent and Future Stabilization Efforts No communication by TRC with Chevron regarding excavation plans April 12, 2015 TRC report has drawings of a sheet piling system to be built on Chevron property without seeking Chevron’s permission or consultation June 22-26, 2015 TRC backfilled the embankment, created a shear wall, undercut the embankment without regard for proper engineering, and without DOGGR approval 7

Concerns Over Recent TRC Embankment “Fill” Efforts June 20, 2015June 24, 2015 TRC conducted excavation work between June 23 and 26, 2015 at the TRC Bull 31R expression Removed wet soil, added a rock base Pushed dirt up the embankment and wheel rolled for compaction with a front end loader and excavator Expression on the south side of TRC’s embankment increased and there is new pooling Further illustration of TRC trespass and improper excavation creating unstable conditions and increasing the flow of surrounding expressions June 26,

TRC Embankment Work June 26, 2015 Note proximity of Well H225 to failing edge of the TRC embankment 9

TRC Embankment Work June 29, 2015 June 29, hrs June 29, 2015 Issues of Concern Excavated a vertical wall Created areas of undercut with respect to the top of the embankment Illustrates further destabilization of the embankment by TRC TRC’s make shift retaining wall anticipates further collapse 10

Impact on Chevron Impedes resolution of DOGGR emergency orders Cannot access 2 operating wells due to TRC created safety concerns TRC excavation trespassed onto Chevron property 11