M&V Reporting Lia Webster, Nexant. M&V Summit - Nov 2002 Current M&V Reporting - IDIQ Requirements (C.4.2): Post-Install M&V report –Contents to be specified.

Slides:



Advertisements
Similar presentations
Follow-up Reporting Expectations MSCHE Annual Conference 2009 Mary Ellen Petrisko.
Advertisements

E-shop Workshop Building an electronic storefront for your business.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Presentation to Potential ORC Changes Group: Background of FY 2013 Community Plan Development August 27, 2012 Community Plan SFY 2013.
1 | Energy Efficiency and Renewable Energyeere.energy.gov Alternative Finance & Mitigating Deferred Maintenance May 21, 2013 Kurmit Rockwell PE, CEM, LEED.
Negotiating Energy and Water Services Agreements.
M&V Decision Tool Sub-Committee Report Venkat Kumar Satish Kumar FEMP-ESCO Meeting 6 th June, 2002 Palm Springs, CA.
First Article Inspection Report
Renewals Review January Why are We Here Today ? During today’s web-conference, we’ll : Review the renewals “package” Discuss the process for.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.
Page 1 July 2014 Capacity Building of Banks/FIs For EE Project Financing Capacity Building of Banks and Financial Institutions for Energy Efficiency Project.
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
July 11 th, 2005 Software Engineering with Reusable Components RiSE’s Seminars Sametinger’s book :: Chapters 16, 17 and 18 Fred Durão.
Risk management. Berliner Energieagentur GmbH Risks of EPC Equipment transfered into the property of building owner at the moment of installation and/or.
Need for a Professional Approach in Building Energy Audit Pradeep Kumar Sr. Technical Specialist.
Using Uncertainty Modeling to Optimize M&V in ESPC Projects Discussion Document 10/31/02.
M&V Planning Working Group Update M&V Summit, New Orleans 5/5/03 Satish Kumar and Venkat Kumar.
Self-evaluation of project concepts for application in Horizon 2020
New Advanced Higher Subject Implementation Events
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Strand A In Depth Context and Introduction. Strand A: Instruction Demonstrates your competency in instruction based on your documentation of NM Teacher.
® IBM Software Group © 2009 IBM Corporation Rational Publishing Engine RQM Multi Level Report Tutorial David Rennie, IBM Rational Services A/NZ
UESC Project Identification The Utility Audit ä Preliminary issues ä Arranging the audit ä Kickoff meeting ä The audit ä The audit results Establish Terms.
Agenda Outline Mode Separating Show Into Sections Hyperlinking Adding Media Inserting Charts from Excel Common Mistakes Q&A.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
M&V Part 2: Risk Assessment & Responsibility Allocation.
Phoenix Convention Center Phoenix, Arizona M&V Contracting / Business Perspective Track 5: Project Financing Session 5: M&V: High- and Low-Level Perspectives.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
M&V Plan Development Working Group Update M&V Summit November 2003 Lia Webster, Chair.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
M&V Plan Template Lia Webster, Nexant New Orleans M&V Summit May 2003.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of:1 AF M&V Template K. Quinn Hart, P.E Air Force Facilities Energy.
INFO 424 Team Project Practicum Week 2 - Launch report, Project tracking, Review report Glenn Booker Notes largely from Prof. Hislop.
Technical Working Group Status Updates Federal ESPC Quality Assurance Steering Committee January 25th, 2004 Washington,
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
1 M&V Training M&V Summit 7 May 2003 N’Awlins, LA.
2 Breakout Session # 506 Daryl Berg, DOE Contacting Officer Julia Trautman, DOE Contract Specialist Date April 15, 2008 Time3:20 – 4:20 p.m. Energy Savings.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002.
Annual Reporting Working Group Update Lia Webster, Nexant New Orleans M&V Summit May 2003.
Report to the UBL TC Naming and Design Rules Subcommittee Eve Maler NDR SC chair 22 January
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
INFORMATION X INFO415: Systems Analysis Systems Analysis Project Deliverable 2: Gathering System Requirements Instructions.
SPPs Requirements and Use of Audited Financials July 18, 2013 Scott Smith ·
Integrate, check and share documents Module 3.3. Integrate, check and share documents Module 3.3.
1 M&V Cx Working Group Report New York City - M&V Summit Steve Dunnivant - Chair This presentation will probably involve audience discussion, which will.
Accessible Web Publishing Wizard For Microsoft® Office E-Series Webcasts Best Practices for Microsoft® PowerPoint.
Commission on Teacher Credentialing Ensuring Educator Excellence 1 Program Assessment Technical Assistance Meetings December 2009.
Management Considerations Sharon Chisholm
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
Middle Fork Project Existing Resource Information Reports July 18, 2006.
The Periodic Review Report and Middle States Accreditation PRR Workshop April 9, 2008.
Proposed Edits to the Air Source Heat Pump Specifications Regional Technical Forum August 20, 2013.
Dr. Thomas Tomasi Associate Dean, Graduate College
Energy Savings Performance Contracts & Energy Service Companies
Creating Reports Understanding various types of reports and writing persuasive Analytical Reports.
Complete Management of your Entire Backflow Program
Increased Efficiency and Effectiveness
Information Analysis, Organization, and Presentation
More to Learn Viewing file details
Leadership/ communication and commitment
Backward mapping – planning template
[replace this text] [replace this text]
Presentation transcript:

M&V Reporting Lia Webster, Nexant

M&V Summit - Nov 2002 Current M&V Reporting - IDIQ Requirements (C.4.2): Post-Install M&V report –Contents to be specified in M&V plan –Report on: ECM installation, inspection, & commissioning M&V reports –Annual is minimum frequency –Provide evidence that continued ECM performance achieves guaranteed cost savings –Contents: ECM performance measurements, Calculations, & Baseline adjustments

M&V Summit - Nov 2002 M&V Reporting working group Subcommittee formed in Palm Springs (Ron Araujo, Sylvia Berry-Lewis, Doug Dahle,Dan Flaig, Mark Halverson, Quinn Hart, Scott Judson, Venkat Kumar, Mike Parker, Julie Payne, Dan Sanders, Tatiana Strajnic, Tory Sweetser, Dave Underwood, Phil Voss) Objective: Develop a standard format for annual M&V reports Status: Template under development: –Detailed outline with mandatory and optional sections –Include current utility rates (optional)

M&V Summit - Nov 2002 Key issues in M&V reporting: M&V report should have enough context to make sense alone Background information is critical : –DO (ECM descriptions, M&V plan, cost schedules), acceptance documentation, commissioning materials, post-installation report, contract modifications –Making M&V report all-inclusive = MASSIVE report

M&V Summit - Nov 2002 Ideas ESCOs could issue CD ROM and/or binder with all relevant background info –With first year M&V report only –Shouldn’t be too hard for ESCO to assemble FEMP working on electronic filing system –documents would be available to Agency if needed; not currently in place –Note: Electronic documentation is NOT a current program requirement

M&V Summit - Nov 2002 Another idea from working group… FEMP needs to address question: “why don’t we see savings in the utility bills?” –SuperESPC could address issue separate from M&V reports, or –Standard language could be included as appendix to M&V reports