Paul Barclay SCT COOLING PRR 14-4-5 DESIGN PERAMETERS a)ACTIVE LENGTH TO MATCH Q.M.U.L PROTOTYPE b)GENERAL LAYOUT OF HEAT EXCHANGERS.

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
April 05 Jason Tarrant CCLRC1 PRR of SCT off-detector cooling system l Cooling System »Design - Off-cylinder & On-cylinder »Installation – Off-cylinder.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
A.Nichols CLRC1 SCT HEX PRR ( ) Layout & Installation of Barrel off-detector HEX circuits From barrel cooling loop to PPB1 l Barrel Hex is a plain.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Comparison of cooling services at barrel end Description SCT Barrel Upgrade ID barrel one end one end Total number of staves/rows 176 Staves/rows serviced.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
1 Production and QA of Barrel / Endcap Heat Exchangers ATLAS SCT PRR April 13 th & 14 th 2005John Morris – Queen Mary, University London Heat Exchanger.
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
13th April 2005R.Bates, QM Measurements of Barrel and EC HEX R. Bates, M. Olcese, B. Gorski, QM for prototype builds.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
HEP GROUP MEETING work on the ATLAS UPGRADE T.J.Fraser.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Barrel SCT Material Budget By Alessandro Tricoli RAL ATLAS Physics meeting, 18 th March 2008.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Design Project 1 Equalized Velocity for Automobile Climate Control Rodger Stowe Amber Russell Kevin Feeley Kreischer Davis Tom Filipucci.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Vacuum Fundamentals High-Vacuum Technology Course Week 7 Paul Nash HE Subject Leader (Engineering)
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
Service channels between Tracker and PP1 TK-PP1 Cable Channel Review 14 September 2007, Antti Onnela, CERN Installation order and Component status Mock-up.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
HEX Procurement Parts List Contains: qualification parts, Barrel & EndCap HEX Web site also contains a.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
V. Bobillier1 Cable installation status.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
The integration of 420 m detectors into the LHC
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
P.Barclay CLRC1 SCT HEX PRR ( ) Design and qualification of fittings and filters l Background comments: »Space and assembly constraints prevent us.
COOLING BY EVAPORATION OF PERFLUOROCARBONS Why evaporate? 1. To enhance the heat transfer per unit area The heat transfer coefficient increases significantly.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
ATLAS Internal ID Service Integration
Service channels between Tracker and PP1
End-cap Mechanics FDR Overview of the Project
Chamber Design and Integration RE3/1 and RE4/1
Cooling Update (27 March 2014)
Generic Cryo HX Options
HIE-LINAC status report
CO2 Cooling IPNL Nick Lumb, 28/01/09.
Tests of Endcap capillary & Heat exchangers at CERN
Cooling Update (27 March 2014)
Presentation transcript:

Paul Barclay SCT COOLING PRR DESIGN PERAMETERS a)ACTIVE LENGTH TO MATCH Q.M.U.L PROTOTYPE b)GENERAL LAYOUT OF HEAT EXCHANGERS IN TRAYS BASED ON DRAWING TB AT RAL c)44 HEAT EXCHANGERS REQUIRED COMPRISING OF A POSSIBLE 11 VARIATIONS IN TOTAL FROM THE FIRST ASSEMBLY TD d)DETAILS OF TRAY LAYOUT IN CRYOSTAT TAKEN FROM Pro-e MODEL TD AT RAL. TRAY ALL FITTED TO CRYOSTAT e)COMBINED CONNECTORS AND ELECTRICAL ISOLATORS (GROUNDING) DEVELOPED AT RAL TO SATIFY SPACE/THROUGH DIA AND MASS RESTRICTIONS. NO COMMERCIAL EQUIVALENT. f)FILTER- TO SCREEN OUT OBJECTS LARGE ENOUGH TO COMPROMISE THE INNER DIAMETER OF THE CAPILLARIES. REQUIRES MINIMAL FLOW RESISTANCE AND TRAY SPACE. NO CONECTIONS g)ASSEMBLY ---Q.M.U.LONDON…..TOOLING BY RAL & Q.M.U.L h)CLEAN—Q.M.U.L i)TEST - Q.M.U.L & CERN

Paul Barclay SCT COOLING PRR HEAT EXCHANGER LAYOUT SCREEN Bheat1 Electrical isolation Bex1 Indium seal Bcap1 Indium seal ELECTRICAL ISOLATOR CERAMIC HEAT EXCHANGER

Paul Barclay SCT COOLING PRR VIEWS IN CRYOSTAT OPTICAL PATCH PANELS TRAY FLATTENED PIPE (PIPE-5) TD BARREL FITTINGS BARREL FITTINGS

Paul Barclay 4.6 Dia 264 Holes 0.5mm Dia SCT COOLING PRR SCREEN ASSEMBLY FLOW

Paul Barclay SCT COOLING PRR Bheat1 Electrical Isolating Connector FEMALE PEEK MALE PEEK SPRING NUT

Paul Barclay SCT COOLING PRR Details of electrically isolating joint Bheat1 FEMALE 38 Deg taper MAIN AREA OF CONTACT MALE 42 Deg taper PEEK INSULATION SPRING WASHER PEEK SEAL

Paul Barclay SCT COOLING PRR HEAT EXCHANGER BODY 14 I/D X-SEC 140MM 14mm I/D X-SEC 140mm FLATTENED PIPE 6.5 X 12.5 X 0.7W X-SEC 43mm TOTAL EXCHANGER LENGTH 1515 CURRENT Q.M.U.L. PROTOTYPE 1450

Paul Barclay SCT COOLING PRR IDENTIFICATION OF HEAT EXCHANGERS..PROPOSAL PROPOSED IDENT THREE PARTS 1)DETECTOR END…A OR C 2)QUADRANT…..A1..A2..C3 3)HEAT EX NUMBER 1 THRO 22 EXAMPLE A2-11 = END A QUADRANT 2 HEAT EX No 11 A2-11 VIEW LOOKING AT Z=0

Paul Barclay SCT COOLING PRR IDENTIFICATION OF HEAT EXCHANGERS……PROPOSAL EXAMPLE END ………….C QUADRANT …3 HEAT EX No…12 C3-12 VIEW LOOKING AT Z=0

Paul Barclay SCT COOLING PRR CURRENT STATUS 1)ALL COMMON PARTS REQUIRED TO BUILD THE HEAT EXCHANGERS HAVE BEEN ORDERED. 2)TOOLING FOR PIPE 2 – 3- & 4 TD /3/4 CURRENTLY AT RAL 3)MAJORITY OF PARTS ARE DUE IN FIRST PART APRIL 4)ASSEMBLY DRAWING FOR THE FIRST HEAT EX TO BE ISSUED BY THE DATE OF THIS REVIEW TD ) REMAINING 10 ASSEMBLY DRAWINGS 2-3 WEEKS FROM THE FIRST 6)ASSEMBLY TOOLING DESIGN IS IN PARALLEL WITH ASSEMBLY DRAWINGS. ACTUAL DETAILING 1-2 WEEKS AFTER 10 ASSEMBLY DRAWINGS 7)DELAYS:- TESTING OF FIRST ARTICLE EXCHANGER CERN