Housing Service Review Plan for the coming period 24 November 2014.

Slides:



Advertisements
Similar presentations
AG BUILDING CONSTRUCTION. Unskilled / Semi-skilled Labor Skilled Trade / Craftsman Technicians Design & Management.
Advertisements

Housing solutions in Kyrgyzstan
AT – 201 Introduction to Architecture Dan Trent August 27,
Cathedral of the Immaculate Conception Project Information Session.
BUILDING PATHOLOGY AND DIAGNOSTIC case study: HOTEL ALBERI via lungo lario Isonzo –LECCO- STUDENTS: Janaina Gerde Muniz Gerardo Diosdado Espinosa Marco.
BY LUKE T. Minecraft.. Minecraft For my make project I am making houses in mine craft. I already made 4 houses.
Berwickshire High School Presentation compiled 15 th October 2009.
Chapter 6: Animal Housing Features © 2005 Thomson Delmar Learning. All rights reserved.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Birdcage Dome On A Mesa Chicken wire stretched over an interwoven hemispherical matrix of painted steel rebar forms a dome home. Between the chicken wire.
RENOVATION & RESTORATION. New 3 rd Floor Prosecutors Office Existing Attic Space.
MASTIGUM Polymer modified Bituminous Waterproofing Paste - Water Base.
 In Slovakia according to the climate, weather and geographic conditions, plus energy house cannot be built because the only source of energy can be used.
1 Presentation 25 CONSTRUCTION MATERIAL. 2 Learning Outcomes By the end of this meeting, students will be expected to be able to : Students can explain.
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
PASSIVE HOUSE SANTORSO (VI) ITALY. UNDERFLOOR TANKS In order to have an eco- building there are underfloor tanks to collect rainwater which is filtered.
MICHELANGELO.
By Emmi Miller and Jenny Sulouff
Bar joist over kitchen and band room. Setting bar joist over kitchen and electrical/mechanical rooms.
Identifying Information: Common Areas - 1 none LEVEL 2.
Project 3 DS 413: Design Studio 413 May 9, 2010.
Proposal For Fire Station No. 2 Presented to: Lawrence City Commission April 11, 2006.
7 Facility Systems Facility Systems chapter 7 chapter
The Evolution of the TERRA Crystal Galleries Mineral Showroom.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
M.A.P Case Study – Scott Howell In Partnership with.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
FRAMED STRUCTURE Members: *Daniela Rodriguez *Sofia Saturno
NOW, to what we have already achieved… We have a new roof on sanctuary and ground work to prevent prior water issues…..
Eurocode 1: Actions on structures – Part 1–2: General actions – Actions on structures exposed to fire Part of the One Stop Shop program Annex F (informative)
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
Local Government Management of GIS Data for a Water Utility
Werkok, Sudan Update 2008 Partners in Compassionate Care.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Green Concepts LEED Everything from the Motel was recycled.
Basic House Design.
Marieclaire Monasterio Aracelis Cedeño
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
AT – 201 Introduction to Architecture Dan Trent August 28,
IET 120 CONSTRUCTION PROJECT Name: Elizabeth McClain.
Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a.
Describe, in German, the following: I live in a house. On the ground floor I have a kitchen, bathroom and living room. On the first floor I have 3 bedrooms.
907 King Street Alexandria, Virginia. Basic Facts  Property Address: 907 King Street, Alexandria, Virginia  Property Type: 3-story walk-up office.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
FACTORS EFFECTING COST OF BUILDING ELEMENTS
SCX5 – Proposed New Intermediate floor over existing CMS Rack Room J.Osborne CEMESTE 20 Feb 2008.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
Housing Service Review Service Report 1 June 2015.
Module 4 - Buildings Building Footprints.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Faculty of Civil Engineering, Brno University of Technology, Karel STRUHALA, Zuzana STRÁNSKÁ IMPACT OF BUILDING'S LIFESPAN ON THE.
A HOUSE.
Bond Project Update September 2017
IMPACT OF BUILDING'S LIFESPAN ON THE LIFE CYCLE ASSESSMENT
Types of ground floors.
Chapter 10 Construction Basics.
Carl James Type of building use
International Building Materials and components
Housing Styles.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
There is no place like home
Concrete A structural material made by combining cement, sand, aggregate, and water.
KOMPLEX Investors Report – Q
Community Practice Asset Management.
Presentation transcript:

Housing Service Review Plan for the coming period 24 November 2014

Building 38 Building 38 was built in 1982, and is composed of a basement, a ground floor and 3 additional floors. It was modified in 1998, with the creation of two additional floors. The materials used for the structure of the building are concrete (from basement to third floor) and steel (4 th and 5 th floor). The roof is covered by a layer of gravel, which is incombustible. State of the building The decaying joints in the showers have caused water to infiltrate the walls, which are now soaked and form mildew. This phenomenon is generalised on floors 4 and 5 of the building. Urgent and considerable work must be undertaken in order that these rooms can be made available to future clients. 14 rooms are already out of order. But all the 70 rooms located on the 4 th and 5 th floor will have to be renovated.

Building 38 Planning of the renovation: 15 June 2015: 35 rooms available (4th floor) 30 August 2015 : 35 rooms available (5th floor)

Hotels: multi-year works planning

Preliminary multi-year planning of maintenance (room renovation, painting and flooring in common spaces, lighting, ventilation,…) Works are staged in order to maintain hotel capacity (and corresponding revenues) as high as possible. GS-SE support is needed for a more precise cost assessment.

Many thanks for your attention!