Guarantees of Origin Scheme 30 th November 2011. 2 Guarantees of Origin – a brief history EU Directive 2001/77/EC - first mentioned GOs Replaced by the.

Slides:



Advertisements
Similar presentations
FUEL MIX DISCLOSURE 29 February Fuel Mix Disclosure - History Article 3(6) of the Internal Market Directive (Directive 2003/54/EC) Final customers.
Advertisements

The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session January 24, 2006.
Graduate Application Project Design Concept Walkthrough
1 COMPARISON OF OLD AND NEW APPLICATION (RETURN) Commercial Taxes Department Government Of Jharkhand.
How to Submit a Matching Gifts Application.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session September 22, 2005.
Guide to using the myNATE website
Smart Connect – Supplier Portal Training Module 2 – Creation of Service Confirmation.
Windsor Solutions, Inc. State and Local Emissions Inventory System (SLEIS) WV DEP Regulated Community Training Tuesday, December 4 th 2012.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
SRC Application Process Fall 2014 Version: November 12, 2014.
1 Association of Issuing Bodies Phil Moody (Secretary General) Ankara – 28 April 2006 The activities of the AIB.
Customer Service Module Course Contents Table of Contents Enter A Request Search A Request Create Invoice (Funeral home request) Search Invoice Manage.
Page 1 of 36 Respective of PNG Tenure Regulation Sections 19 to 23; when Crown land is leased without a producing well and is being drained by a freehold.
Validation of legal entities and financial capacity check
N. K. SHETH & COMPANY1 THE CHAMBER OF TAX CONSUTANTS Welcomes all Participants to Seminar on e-Filing of Service Tax Returns Subject : E-Filing of Service.
1. 2 ECRF survey - Electronic signature Mr Yves Gonner Luxembourg, June 12, 2009.
PROACTIS: Supplier User Guide Contract Management.
1 COMPARISON OF OLD AND NEW APPLICATION (RETURN) Commercial Taxes Department Government Of Jharkhand.
TCRS Concord Project Employer Training. Agenda 2 Topic Objectives Why Are You Here? Project Overview What’s New Your Resources Questions Demonstration.
Internet Banking Standard and Standard-Hybrid Registration Intuit Financial Services University Internet Banking Certification Training.
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
ETutorial - Online TAN Registration and Request for Consolidated TDS/TCS file from TIN November 18, Tax Information Network of Income Tax Department.
THE SECURE AND FAIR ENFORCEMENT FOR MORTGAGE LICENSING ACT OF 2008 REQUIRED REGISTRATION BY THE SAFE ACT.
ASAP (Assessment Submission and Processing) Submission Processing Overview for IRF-PAI IRF Conference May 2, 2012.
Employee Self Service (ESS) Version Employee Self Service  access from any computer  view their elected withholding, earnings summary, check.
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
Renewable Energy Credit (REC) Program ERCOT Retail 101.
PA AEPS Summit Harrisburg PA Thursday, June 17, 2010.
Board of Canadian Registered Safety Professionals Certification Maintenance Online Tool BCRSP introduces a new web-based tool to assist certificate holders.
Stella Bawden, Registration and Awards Manager Online Awarding Overview.
Online Reporting Guide
Lead Management Tool Partner User Guide March 15, 2013
Unit Registration Process Improvement SEMO 05/12/2012.
Computer Scoring Le Grand Concours 2011 and beyond.
Welcome to the SARS Tax Workshop The purpose of this presentation is merely to provide information in an easily understandable format and is intended to.
Click here to register TAN online Online TAN Registration.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.
Registered Administrators & Eurostat Requirements GERARD KEANE.
Scarlett Gibb NIH Office of Extramural Research Office of Electronic Research and Reports Management Interim Chief, eRA User Support, Training & Documentation.
FP6 IT System 1 ELECTRONIC PROPOSAL SUBMISSION SYSTEM.
This is a short presentation to explain how and why to login to the CIM website as a member. Benefits are: Access to myCIM (private member area, contains.
Supported by Excursus: How Competent Bodies could deal with the 12 months lifetime of RES-GO Christof Timpe Second Workshop “Making Guarantees.
FUEL MIX DISCLOSURE 29 October Fuel Mix Disclosure - History Article 3(6) of the Internal Market Directive (Directive 2003/54/EC) Final customers.
Mobility Tool+ 1. EU Survey Mobility Tool EPlusLink Beneficiary User Sign Grant Agreement Participant Manage Project Generation Participant Report Request.
Adviser Panel. Go to All DD Track Advisers: Click “Advisor Login”
1 Addendum FALL 2004 RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. November 2004.
Oracle eBusiness Financials R12 Oracle Receivables Functional Overview TCS Oracle Practice.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Vodafone India Partner On-boarding Quick Start Guide.
FHA Training Module 1 This document reflects current policy related to this topic. Its content is approved for use in all external and internal FHA-related.
MS Invoice E-Invoice Solution Overview March 2016.
BUSINESS WITH CONFIDENCE icaew.com Online annual return.
American Diploma Project Administrative Site Training.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
EUETS Registry EUETS Registry; the UK Experience and Changes for Phase III Lee Oliver Workshop on EU Emission Trading Scheme – Monitoring, Reporting and.
3 rd Party Registration & Account Management SMT Update To AMWG March 22, 2016.
Hazardous Waste Import-Export Final Rule Requirements and Implementation December 12, 2016.
Online Training Course
IPC1752 Class D User Instructions
Royal Mail Group: Publishing Volume Commitment Incentive.
Online Training Course
Royal Mail Group: Publishing Volume Commitment Incentive.
Manual for Supplier Registration
Approach to Market Cutover - Draft for Discussion
Scheme for Growth Pilot
Royal Mail Group: Publishing Volume Commitment Incentive.
Annual Quantity (AQ) 45.
ON EUROPEAN TRADEMARKS AND DESIGNS
Presentation transcript:

Guarantees of Origin Scheme 30 th November 2011

2 Guarantees of Origin – a brief history EU Directive 2001/77/EC - first mentioned GOs Replaced by the Renewable Energy Directive 2009/28/EC Legislation transposed on the 28 th of March 2011 S.I. (Statutory Instrument) 147 of 2011 SEMO named as the Issuing Body for Ireland CER tasked with developing the Supervisory Framework

3 What is a Guarantee of Origin? “Guarantees of origin issued for the purpose of this Directive have the sole function of proving to a final customer that a given share or quantity of energy was produced from renewable sources.” - Section (52), DIRECTIVE 2009/28/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 23 April 2009

4 Renewables Directive The sole purpose of GOs is Fuel Mix Disclosure There is no connection between national targets and FMD GOs do not follow the physical flow of energy

5 What is a Guarantee of Origin? Standard size of one megawatt hour (1MWh) Issued on request of the Generator Guarantee that electricity has been produced from a renewable source

6 Guarantee of Origin – Renewable Sources Examples of renewable sources: Wind Solar Ocean Energy Biomass Hydropower Landfill Gas Aerothermal Geothermal Hydrothermal

7 Fuel Mix Disclosure – Interim Solution SEMO completes the calc on an annual basis All Island Fuel Mix Suppliers submit declarations and ‘claim’ generation (Both in-market and out-of-market) Interim solution for 2008, 2009, 2010 For these years FMD was based on physical flows

8 FMD 2010 Breakdown

9 Fuel Mix Disclosure – Output SEMO provides an individual Fuel mix breakdown to Suppliers And All Island Mix breakdown Display on their customers’ bills Consumers may use this comparison when deciding which supplier to choose

10 Fuel Mix Disclosure – Enduring Solution Enduring solution to be in place next year for 2011 calculation Next year Suppliers will be able to declare Irish GOs GOs do not follow physical flow Deadline for Supplier Submissions for Disclosure Period 2011 is the 31 st March 2012

11 Guarantee of Origin - Status Used Deemed to be used in a disclosure period in which the GO is counted for FMD purposes A GO can only be used once Active 12 months from the date of production Can be used in any disclosure period in which it is active e.g. a GO issued on 1 st of June 2012 can be used in FMD 2012 or FMD 2013

12 Guarantee of Origin - Status Expired Expires after 12 months Can still be used or transferred after expiration Cancelled When used in FMD If not used in final FMD Disclosure Period, into Residual Mix Cancelled GOs cannot be used or transferred again

13 GO Scheme – Business Processes SEMO will administer the following processes: Registration Request Issuing Transfer Import Revocation

14 GO Scheme – Business Processes

15 GO Calendar Some processes are ad hoc Others are quarterly QuarterEnd Date Quarter 131 st March Quarter 230 th June Quarter 330 th September Quarter 431 st December

16 GO Registration Download from the SEM-O website Pack for Generators, Pack for Suppliers ‘Enable Macro’ document available on the website Pack must be fully completed

17 SEMO Website - GOs

18 GO Registration – Authorised Users Nomination of Authorised User (Internal) Nomination of External Agent (External) Can only have either an internal or external authorised user to Request, Issue, Transfer Supplier can act as an External Agent Password provided must be 8 characters Authorised Users and Passwords will be logged

19 GO Registration Once completed to Acknowledgement with Ref Number will be sent

20 GO Registration Within SEM Generators – details checked internally Out of SEM Generators – details checked with DSO Suppliers – details checked internally

21 GO Registration ID will be issued, this is separate to any market IDs This ID will be used for all correspondence relating to GOs and FMD Central registry will contain these IDs SEMO asks if participants can confirm receipt of this ID

22 GO Registration Request Submit Registration Pack Receive Input Information Check Registration Pack for completeness Validate Verify business details Verify Within-SEM Generator details Verify Supplier Unit details Contact DSO for necessary verifications Contact Participant Record Enter Participant details to GO registry Issue FMD IDs

23 GO Registration Enduring Registration Process will take 21 Working Days to complete Need to have Initial Registrations complete by the end of Working Days until Xmas!!!

24 GO Requests Ad Hoc process Generator sends request, receives Ref Number Two validation checks 1) Is the Generator registered for the scheme? 2) Are template details correct? 2 WDs for this validation Except for 10 WDs before end of quarter, extended to 5 WDs

25 GO Requests Requests can be for more than 1MWh, varying Start/End dates Verified Requests added to the request log Invalid Requests rejected SEMO will be backdating GOs for 2011 Start sending in requests once registered for the scheme

26 GO Requests Request Submit GO Request Send Acknowledgement Verify Check user details Check Generator details Record Update request log

27 GO Issuing Quarterly process Metered Generation (MG) pulled from SEM Market Systems (within market) and requested from MRSO (out of market) 10 Working Days after end of quarter

28 GO Issuing Cross check Requests against MG a) If Requested MWh <= MG – GOs Issued b) If Requested MWh > MG – GOs Rejected e.g. Request MWh = 10 MG MWh = 9 Authorised User will be informed that 9 are available Request can be resubmitted with revised values Resent within 2 WDs

29 GO Issuing Electronic document as per the S.I. Each certificate has its own unique ID Certificates ed to the Authorised User (20 WDs after the end of the quarter) Authorised User calls SEMO with their password The file password is then given Password is randomly generated Certificates can then be accessed

30 GO Issuing – Format of a GO Will be in XML format

31 Issue GO Certificates Request Request MRSO data Extract Market Systems data Consolidate data Verify Upload request log Validate requests Communicate Send rejection Issue Update GO database Issue GO certificates

32 GO Transfer Ad hoc process (need to be completed by 31 st of March 2012 for 2011 FMD) Current holder’s Authorised User sends in a Transfer Request Details of the New Holder (GO Participant) SEMO verifies the details and updates the Central Registry New updated certificates sent to New Holder

33 GO Transfer

34 GO Transfer - Exports Export transfers are included here – need MS New certificates not sent on – registry updated as ‘Exported’

35 GO Transfers Request Receive Input Information Check user details Verify Check GO details Check account details Record Update database Contact export Member State Communicate Send rejection Send confirmation

36 Renewables Attributes Transfer Quarterly process Supplier advises which Generators they have PSO PPA agreements with SEMO will be checking PSO lists However, need as much info as possible Attributes will be assigned automatically every quarter If details change, must advise SEMO

37 GO Revocation Ad hoc – Only where SEMO have grounds to suspect fraud; rules set out in S.I. SEMO will advise the CER of concerns, however final decision will be taken by SEMO Post notice to current holder – must be written notice as per S.I. Previous holders will be advised, if contact details are available Update Central Registry with ‘Revoked’

38 GO Revocation Contact CERContact ParticipantUpdate Database

39 GO Imports Ad hoc process Advise SEMO ASAP – will need to contact Member States to verify validity If no response from MS after 10 WDs - rejected Minimum details required – Static Data SEMO will work on building contacts within Member States

40 GO Imports Receive Notice Contact Member State Update Database Send Confirmation

41 Conclusions Registration process to be completed Requests accepted ad hoc Issuing once per quarter Transfers accepted ad hoc Imports accepted ad hoc Revocation – as required

42 Next Steps Registrations to commence asap Once registered send through requests Backdating to commence for 2011 in January FMD MOST to be held in January – All Island

43 Next Steps

44 Q&A Thank you for your attention!