Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.

Slides:



Advertisements
Similar presentations
ISTISNA’.
Advertisements

Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Congestion Management by distribution FEBEG POSITION Meeting FEBEG-VREG ( )
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Review Proposal 0166 Review of necessary reform of NTS Offtake Arrangements Thursday 6th September 2007.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Enduring Offtake Arrangements including an Off-Peak Interruptible Service Peter Bolitho.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Sunday, 04 October 2015 UNC Mod Action WG0505: Provide for discussion/development the potential categories of connection offer and associated timescales.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
© Energy UK April 2012 Transmission Workgroup – 4 th April Financial Commitment for Incremental Capacity Presentation by Energy UK
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group -140 Thoughts on additional information requirements.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Interactions with the implementation of RIIO-T1
Wales & West Utilities Entry – Standard Special Condition D12
Transitional Exit Capacity Proposals -Update
An alternative approach…..
Exit Capacity User Commitment – Transmission Workstream update
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
UNC Modification Proposal 0373
Capacity Methodology Statements: Impact of Mod 452
Mod 0452 (PARCA) – Further thoughts
PARCA Security and Termination Amounts
Update on Exit Capacity Substitution and Revision
Long Term Non Firm Capacity Update
Transmission Workstream – Partial Assignment
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
Transmission Workstream – 6th July 2005
Presentation transcript:

Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points

2 Problems with Mod 116V Arrangements Rigidity of capacity allocation timetable does not fit well with the complexity associated with capital investment programmes which generate requirements for incremental exit capacity at new and existing exit points 3 relevant types of investment to consider –Construction by NG NTS of upstream reinforcement (if required) –Construction by NG NTS of ROV compound and connecting pipeline to NTS (if required) –Construction by User/Developer of power station, downstream pipework/network or storage facility Does not give Users the certainty that capacity can be secured at the point they need to know this. Does not give NG NTS the certainty that their investment is not premature or that substitution they make will be utilised.

3 High Level Principles of Proposal Prevailing capacity allocated as per 116V and rolls forward annually Prevailing capacity can be varied annually (up or down) in a July window w.e.f. October 3 years hence and will be subject to 4 years user commitment Applies to both DC and DNO Users Users can apply for prevailing capacity at a new exit point and increases in prevailing capacity at existing exit points (subject to a materiality threshold) through the ARCA Allocation Process (AAP) anytime between Aug - Apr Users can reserve prevailing capacity outside of the July window by signing an ARCA and by demonstrating commitment to project in question. ARCA can require capacity to be made available from any date and will be subject to 4 years user commitment NG to have licence obligation to make capacity allocated under an AAP available in line with the Users required timetable or as soon as reasonably possible thereafter. NG to earn non obligated revenue if provide capacity earlier than 116V timetable in line with User’s requested date. NG can substitute exit capacity to meet an AAP requirement subject to restrictions

4 AAP - Applicability AAP can be used to cover: –Capacity required at new NTS Exit Points –Increases in prevailing capacity which require a > [25%] increase in the prevailing baseline at existing NTS Exit Points AAP is optional and Users can choose to use the July window for such requirements instead. NG’s suite of connection related agreements continue to be used for ROV and connecting pipelines regardless of whether the a User opts for AAP or the July revision window AAP to complement and dovetail with NG’s suite of connection related agreements.

5 AAP - Initial Capacity Request Process commences with an application for capacity in a standard form. This should be tied in with NG’s current “Budget Indication of Connection Costs” pro-forma. NG then have a fixed period of time to respond to the application (suggest 2 months as per UNC currently) stating –what capacity is available by what date –whether upstream reinforcement is required to provide –whether provision of the capacity is dependent on substitution –budget cost of any connecting pipeline If the User’s application includes a request for NG to build a connecting line and/or requires NG to make upstream reinforcements the maximum capacity lead time should be as per the 116V timetable (i.e an application made in Sep 08 would require capacity to be made available no later than Oct 2012)

6 AAP - Substitution NG can include exit capacity substitution to meet an AAP request equivalent to [90%] of prevailing baseline minus the prevailing capacity held. To the extent a User’s prevailing capacity is less than the baseline (unlikely as baselines have been set based on current bookings) this allows User’s to continue securing small increases in capacity during the constrained period in the event baseline capacity is substituted away to meet an AAP requirement. Users can reserve capacity contained in NG’s offer by signing an ARCA, regardless of whether NG need to make upstream reinforcement or not. ARCA can be entered into once a User has signed a “Design and Construction Agreement” or where User can demonstrate commitment to project (e.g. board approval/award of contract) This ensures capacity is reserved/substituted outside the standard 116V process based only on firm commitments

7 AAP - Demonstration Once signed if NG are required to make upstream reinforcement these works proceed in accordance with NG’s network planning/construction process –User already pays the cost of upstream reinforcement design works, which are refunded once NG to proceed to reinforcement construction phase. –ARCA to also include a date (the demonstration date) whereby User is required to demonstrate his relevant consents have been secured and his construction programme is on target to offtake gas by the capacity delivery date(s) –If the User is unable to demonstrate, NG shall be entitled not to proceed to reinforcement construction phase and to set a new demonstration date, and if necessary a new delivery date –If the User’s inability to demonstrate is because of NG’s inability to provide a connecting pipeline on time demonstration will be deemed to apply and NG will be required to proceed to construction phase to meet the capacity delivery date Any revised demonstration or delivery date set by NG shall each be 1 year after the previous date unless NG and the User mutually agree an earlier date Demonstration date can be revised a maximum of [3] times, unless mutually agreed otherwise, after which the ARCA terminates

8 AAP - Fulfilment In the event capacity substitution was undertaken to meet an AAP capacity request the baseline capacity at the substituted exit point will be restored on termination of the ARCA, or used to meet another capacity request. User commitment starts from the point where prevailing capacity is booked except where the ARCA terminates, in which case it no longer applies. The ARCA requires NG to buyback capacity from the delivery date specified if NG have failed to make it available and the User is in a position to offtake gas against that capacity. Buyback subject to restrictions in licence NG allowed to earn non obligated capacity revenue in the event AAP capacity delivered earlier than the 116V timetable in line with User’s requested date. Once an ARCA has been signed NG will publish details of how much capacity is to be made available at which exit point by when, along with details of any exit capacity substitution required to deliver this. Revisions to capacity delivery dates and ARCA terminations will also be published

9 AAP - Summary AAP gives Users the option of acquiring capacity for new capital projects more flexibly subject to demonstration of project commitment July revision window (an open season) retained for small capacity revisions but can be used for new capital projects if commitment dates align Dovetails with NG’s existing suite of User connection agreements and network/construction process. Users can continue to negotiate these documents bilaterally to reflect their project requirements All Users know the extent to which exit capacity substitution can be applied and the potential consequences of not booking sufficient prevailing capacity in the July revision window (as per entry) Allows NG to delay upstream reinforcement if the User’s capital project is delayed. Allows User to accommodate project consenting/construction delays. Financial incentives for NG to deliver earlier than 116V 38 month timetable for capacity acquired in both the July revision window and the AAP