EN-CV interventions during YETS 2015-2016 22-09-2015.

Slides:



Advertisements
Similar presentations
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Advertisements

Construction and Installation of the CLIC Experimental Area
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
Associated detection/extinction systems D. Swoboda.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
LS1 Day EN-CV M. Nonis on behalf of CV group / CERN
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LHC-YETS Coordination meeting #9 24 th November, 2015.
LS2 Cooling & Ventilation Activities M. Battistin EN/CV Acknowledgements: P. Barriere, R. Bozzi, A. Broche, O. Crespo,
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 14 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Infrastructure activities planned on ATLAS during YETS 2015 Thanks to all the experts who contributed Bruno Saint Sulpice, Denis Dumas, Serge Deleval,
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
TE-CRG Activities D. Delikaris, TE-CRG.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire DCP Meeting 20/06/12 Schedule for the technical of June.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
TC meeting P2 planning wks 3&4 A.Tauro
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
EN-CV activities for LHC during LS2
Cryogenics storage and distribution
TS2 preparatory meeting
Equipment simplified model SMR UR safety
Helium spill in LHC tunnel
LHC Civil Engineering Activities for YETS – LS2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
EN-STI activities in LHC during EYETS
Status of Cryogenics Facilities Design
CV maintenance works during YETS
Cooling systems for HL-LHC (WP17.3)
EN-CV interventions during EYETS for PS and PSB
LHCb & EYETS
ATLAS Thermosiphon Electrical Distribution and Run Modes
ALICE 5 o’clock meeting Wk
K. Foraz on behalf of OSS members
EN-CV: P8 systems and Detector Cooling
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

EN-CV interventions during YETS

Maintenance

Cooling: yearly maintenance 3 weeks of stop for the SF, SU, UW Mechanical cleaning of the cooling towers Mechanical and electrical maintenance Bugs fixing SF UW SU

Ventilation: yearly maintenance No stop but redundancy affected during the maintenance. Intervention mostly on the surface. Tunnel air handling units Accessible areas (US, UA) air handling units Experimental cavern UX air handling units Yearly maintenance of the 174 underground units should be finished by TS3 (corrective actions could be needed during YETS)

Planning for EN-CV maintenance - tbc LHC pointsStopRestart Point 114th of December 1515th of January 16 Point 18tbd Point 21st of February 1619th of February 16 Point 322th of February 1626th of February 16 Point 411th of January 1629th of January 16 Point 514th of December 1515th of January 16 Point 61st of February 1619th of February 16 Point 722th of February 1626th of February 16 Point 811th of January 1629th of January 16

Additional works

Point 1 – additional works ALFA cooled cables in RR13 and RR17 Installation of by-pass on the ATLAS US15 mixed water circuit Qualification of the compressed air vessel in SH1 + installation of valve. (stop needed) SF1: dismantle and repair cooling towers silencers Modification of the firefighting water circuit in SUX1 USA15: replacement of the ED pumps, filling circuits and installation of additional valve.

Point 18 – additional works Full replacement of the cryo underground cooling plant in PM18 4 weeks of stop Tbc by the Consolidation for the budget Tbc by the cryo and MEF for the time window

Point 2 – additional works SX2: modification of the pipework to install an Eletta for TE/EPC Replacement of the leaking valve in point 3 requesting to stop and empty the sector 2-3 Work in UW25 to replace flexible sleeves and modify pipework Replacement of the raw water blocked valve in UL26 Replacement of the ventilation unit for ITS in SX2 Preparatory works for the replacement of the SR2 ventilation system (foreseen during EYETS). Intervention in the false floor: lockout required.

Point 3 – additional works PM32 consolidation phase two Tbc by the Consolidation (budget) 6 weeks of work. Most of it in surface. Preparatory works for the replacement of the SR3 ventilation system (foreseen during EYETS). Intervention in the false floor: lockout required

Point 4 – additional works SU4 migration of the cooling control system → Unicos 4 weeks of stop (+maintenance) SH 4 migration of the ventilation control system → Unicos (3 weeks) SHM 4 migration of the ventilation control system → Unicos (3 weeks)

Point 5 – additional works SUX5 migration of the cooling control system → Unicos (tbc by CMS) 3 weeks of stop (+maintenance) Mechanical maintenance on the ventilation in RR53 and RR57 Modifications and repair of point 5 raw water in SD5. Raw water stopped and compensatory measure to discuss. Maintenance of Totem cooling plants in R532 and R571. Preparatory works for the replacement of the SR5 ventilation system (foreseen during EYETS). Intervention in the false floor: lockout required Fixed non-conformities in water connections on the cooled cables in RR53

Point 6 – additional works SH 6 migration of the ventilation control system → Unicos (3 weeks) SHM 6 migration of the ventilation control system → Unicos (3 weeks) Work in UW65 to replace flexible sleeves and modify pipework Preparatory works for the replacement of the SR6 ventilation system (foreseen during EYETS). Intervention in the false floor: lockout required

Point 7 – additional works Preparatory works for the replacement of the SR7 ventilation system (foreseen during EYETS). Intervention in the false floor: lockout required

Point 8 – additional works Cooling test plant for future datacenter Modification for a backup of the LHCb control room racks Modification of the UAPE-831 and 832 installation of VSD. Point bas: replacement of the pumps. UW85 : replacement of the flexibles sleeves and additional support SH 8 migration of the ventilation control system → Unicos (3 weeks) SHM 8 migration of the ventilation control system → Unicos (3 weeks) Work in UW85 to replace flexible sleeves and modify pipework