AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

AGS/Booster Issues Feb. 25, 2014 Time Meeting Haixin Huang.
Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
AGS PP Progress Haixin Huang Time Meeting January, 31, 2012.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
Status of 1.3-GHz Cavity Vacuum Furnace at IB-4 SRF Dev. Group Meeting 27 Sept 2010.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
1939 International TD6 April 17, International TD6 Front View.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
AGS pp Status Feb. 17, 2015 Time Meeting Haixin Huang.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Maintenance and Accelerator Support RHIC StartUp10.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Haixin Huang AGS Cold Snake: Status and Plans.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Injector Status Jan. 19, 2016 Time Meeting Haixin Huang.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Injector Status Feb. 9, 2016 Time Meeting Haixin Huang.
Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Run coordinator report March 23 – 30, 2011
SNS Operational History
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Saturday – Morning 7:36 beams dumped
Wednesday 03/11 – The Plan Finish electron-cloud program:
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Scrubbing progress - 08/12/2012
07/08/2010 Fill #1264 dump at 02:14:38.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Wednesday 6.10 Morning: Quench test at 450 GeV
Presentation transcript:

AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang

2 Status l AGS and Booster are running well to provide beam for RHIC. l Siemens status: No quick fix in sight. Repair the cooling fan for Westinghouse today. Prepare to run AGS with it for a longer time. l AGS vacuum valve incident last maintenance day is under review. l New AGS BLM logic has been tested and put into use today. l H10 noise problem greatly reduced after Yugang found a loose capacitor in the old control board last Tuesday. Only two cases since then, instead of a few for each RHIC fill. l Booster injection field drift still happens from time to time but AGS injection seems stable for some time now. l H section unusual bad vacuum (correlated with drool loss at flattop): vacuum group will check leak to see if pump replacement is needed.

Haixin Huang 3 Vacuum Level and Beam Loss Correlated AGS vacuum *(-1/200) Beam decay at flattop Negative scale