Status of the Beetle Readout for the MaPMTs  history of events  documentation of setup  prospects of near future RICH meeting, CERN, 05.09.2003 Stephan.

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

The MAD chip: 4 channel preamplifier + discriminator.
EML 2023 – Motor Control Lecture 4 – DAQ and Motor Controller.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Update on the RICH Beamtest The RICH Group M. Artuso, S. Blusk, C. Boulahouache, J. Butt, O. Dorjkhaidav, A. Kanan, N. Menaa, R. Mountain, H. Muramatsu,
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
Choosing the right preamplifier/discriminator comparing advantages and drawbacks : NL-277-L (Nanometrics), ASD-8 (Cern) and MAD4 (INFN Italy) Our favorite:
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
26/06/2003Nigel Smale University of Oxford Introduction The BeetleMA0 back-up solution. A readout chip that complies to the LHCb read out specifications.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
New Developments in Large Area THGEMs & APV Exercise INFN – Sezione di Trieste Carlos Alexandre Fernandes dos Santos 11/December/2014.
1 UA9 September 2010 test beam Si telescope hardware status Mark Raymond – 3/9/10.
S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.
Understanding Data Acquisition System for N- XYTER.
CaRIBOu Hardware Design and Status
MaPMT Readout Workshop / Introduction MaPMT Workshop Imperial College 26/27 June 2003 Franz Muheim University of Edinburgh.
Review of Readout for the MaPMTs  Beetle chip (1.2 & 1.2MA0)  results with Heidelberg board RICH meeting, CERN, Stephan Eisenhardt University.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
Preliminary Results of the Beetle Readout for the MaPMTs  Part 1: as presented on  Achievements since last LHCb week  Common Mode correction.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
ASIC Activities for the PANDA GSI Peter Wieczorek.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For CALICE-UK electronics group: A. Baird, D. Bowerman, P. Dauncey,
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Status of the Beetle front-end chip carrier for SRS Lorne Levinson Weizmann Institute of Science Rehovot, Israel L. Levinson, Weizmann Institute, Nov.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Beetle Readout for the MaPMTs: First Results from the Testbeam  history of events  documentation of setup RICH meeting, Zürich, Stephan Eisenhardt.
RICH meeting, F.Muheim1 Proposal for MAPMTs as Photodetectors for the LHCb RICH Franz Muheim University of Edinburgh on behalf of the MAPMT group.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
MaPMT Readout with boardBeetle: First Experiences Beetle User meeting, Zürich, Stephan Eisenhardt University of Edinburgh  Testbeam experiences:
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
TIMING DETECTOR ELECTRONICS FRONT END ELECTRONICS - NINO JOSE DA SILVA –CT-PPS TIMING ENGINEERING REVIEW /
EC electronic status. Outline Reminders History EC-front unit status EC_ASIC status What next ? 2.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Plans for this meeting Analysis of DNA setup data + improvements of setup Look into charge readout options of gas detectors (AGET/DREAM chips) Test new.
Markus Friedl (HEPHY Vienna)
APV Readout Controllers DAQ
Kenneth Wraight, Andrew Blue, Kate Doonan & Sam Crawley
Test Slab Status CALICE ECAL test slab: what is it all about?
VELO readout On detector electronics Off detector electronics to DAQ
MON TUE WED THU
Multianode Photo Multipliers for Ring Imaging Cherenkov Detectors
BESIII EMC electronics
Optical links in the 25ns test beam
2008 Calendar.
Sun Mon Tue Wed Thu Fri Sat
The CMS Tracking Readout and Front End Driver Testing
Sun Mon Tue Wed Thu Fri Sat
Setup for testing LHCb Inner Tracker Modules
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Sun Mon Tue Wed Thu Fri Sat
2008 Calendar.
Presentation transcript:

Status of the Beetle Readout for the MaPMTs  history of events  documentation of setup  prospects of near future RICH meeting, CERN, Stephan Eisenhardt University of Edinburgh

2 RICH meeting, CERN, Stephan Eisenhardt History of Events I o Thu : first ever boardBeetle 1.2 finished and shipped to Edinburgh o Fri : lorry of carrier crashed in road accident o Mon : shipment of first boardBeetle 1.2 arrived at Edinburgh visual inspection: board OK o Wed : first data frames after sorting out problems in the I2C level adaptation and the temporary cabling o Wed : first boardBeetle 1.2MA0 finished and shipped to Edinburgh o Thu : adaptation of FED to differential read-out and first ever LED light signals via DAQ chain (boardBeetle 1.2)  success!! (although a limitation of the dynamic range was observed – amplifier saturates?!?) o Fri : test of boardBeetle 1.2MA0  success! o Sat : pack and go

3 RICH meeting, CERN, Stephan Eisenhardt History of Events II o Sun Wed : troubleshooting of interference between WinXP,NI- interface and Labview on DAQ PC o Mon : 4 more boardBeetle 1.2 delivered to CERN o Wed : move into beam area o Thu Fri : infrastructure & cabling for missing interface board o Sat : tuning of timing & first data frames with LED light and one boardBeetle 1.2 o Sun : tuning of setup for Cherenkov light & first Cherenkov photons with one boardBeetle 1.2 o Mon : cabling for the MaPMT cluster due to missing interface board o Tue : I2C problems with cluster  work around found o Wed : mounting & tuning of cluster of 8 8-dynode stage MaPMT o Thu : tuning of read-out map for right geometry match & first ring of Cherenkov photons  success!! o Thu : 1 spare differential FED & 1 more boardBeetle 1.2 delivered to CERN (with saturation of amplifier cured)

4 RICH meeting, CERN, Stephan Eisenhardt Beetle 1.2 chip: pre-bonding pads of pitch adapter pipeline front- end digital engine pads of Beetle analogue input pads of Beetle I/O

5 RICH meeting, CERN, Stephan Eisenhardt Zoom for probe-tested Chip marks of probe needles made some problems at bonding - but finally it worked

6 RICH meeting, CERN, Stephan Eisenhardt Equipped boardBeetle 10x8 PGAs (2 rows GND pins) Level 0: “back side” Level 5: “front side” preamp,analog, digital, comparator GND connections pitch adapterBeetle chip protective plastic cap buffer capacities and terminators 4x differential amplifiers 4x differential line drivers 4x single ended probe pins power SEQSI & I2C 4x differential out I2C address 4x pot for DC offset

7 RICH meeting, CERN, Stephan Eisenhardt Cluster Setup base plate for mounting and grounding Cambridge bleeder board 5x boardBeetle with Beetle dynode stage MaPMT grounding points slits to access potentiometers mounting holes for lens mount mounting holes for mount to vessel

8 RICH meeting, CERN, Stephan Eisenhardt Cluster Setup: zoom HV point rotation of 4 bleeder chains

9 RICH meeting, CERN, Stephan Eisenhardt Cluster Setup: vessel boardBeetle base plate pivot point MaPMT bleeder board photon direction

10 RICH meeting, CERN, Stephan Eisenhardt Interface Board is missing… 3.3V power line for LVDS fan-out boards designed position of interface board daisy chain of power cables 5x LVDS fan out boards I2C bus 2 cable trees to distribute LVDS signals to boardBeetles

11 RICH meeting, CERN, Stephan Eisenhardt Prospects of the Near Future o Mount lenses o Equip full 9 MaPMT cluster with 8-dynode/Beetle1.2 o Planned measurements: –HV scans with Cherenkov and LED light –Latency and pulse shape scan –Threshold scan with binary readout o Expect to fix saturation problem of amplifier o Expect to extend dynamic range in FED o Hope to get up to 5 boardBeetle with Beetle1.2MA0 early next week to repeat some of the measurements with the second cluster o In the lab: get interface board and prove functionality o In the lab: cure I2C problem with cluster o Many thanks to all who made this possible!!!